Loading…
Loading…
10,655 results • Latest
SUPPLY AND INSTALLATION OF COLD WATER PURIFIED DISPENCER UNDER COOPERS CAMP NAA WARD NO 1 BOOTH NO 192
Operation and Maintenance of 1(One) No. AIRP at Joyghata of capacity 64 cum/hr respectively in Krishnaganj Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Proposed Estimate for black top road over on existing hard sub - base from near HIRA DUTTA TO SUKUMAR BISWAS, GOPAL MAJHI TO PRODIP DAS, MANTU PAL TO BISWAJIT SIKDER, DIPAK BALA TO NIRMAL BISWAS, IN WARD NO 04,UNDER COOPERS CAMP.N.A.A.
Renovation of Park near Sukanta Club at Ward No-6, Booth No-200 (Priority No-1) under Coopers Camp NAA under AMADER PARA AMADER SAMADHAN.
Operation and Maintenance of 1(One) No. AIRP at Maniknagar of capacity 35 cum/hr respectively in Shantipur Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Cement Concrete Road behind Ramkrishna Primary School at Ward No-6 Booth No-201 (Priority No-2) under Coopers Camp NAA Under AMADER PARA AMADER SAMADHAN.
Operation and Maintenance of 1 (One) Nos. AIRPs at Thanarpara of capacity 166 cum/hr respectively in Karimpur-II Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Renovation of shed room near 3No. Part at Ward No-5, Booth No-196 (Priority No-1) under Coopers Camp NAA Under AMADER PARA AMADER SAMADHAN
Operation and Maintenance of 2(Two) Nos. AIRPs at Digri Damodarkhali of capacities 75 and 56 cum/hr respectively in Krishnanagar-I Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Repairing of Shed Ghar Near 5No. Part Play Ground at Ward No-5, Booth No-197 (Priority No-1) under Coopers Camp NAA Under AMADER PARA AMADER SAMADHAN
INDTALLATION OF ARSENIC FREE TUBE WELL NEAR DILIP HALDER HOUSE AT WARD NO-7 BOOTH NO 90/202, WARD NO - 07, UNDER COOPERS CAMP NOTIFIED AREA AUTHORITY UNDER AMADER PARA AMADER SAMADHAN
Operation and Maintenance of 2(Two) Nos. AIRPs at Bansberia Chandpur of capacities 31 and 30 cum/hr respectively in Krishnanagar-I Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Supply and Installation of Stand Alone Solar PV High Mast with 12m GI High Mast with 50 W x 6 nos LED Luminary, 6x200 Wp Mono PERC PV, module, 6x100 Ah 12.8V LITHIUM FERRO PHOSPHATE (LIFe PO 4) Battery near Kusumbala and Link road of W-4 and W-5
Supply and Installation of Stand Alone Solar PV High Mast with 12m GI High Mast with 50 W x 6 nos LED Luminary, 6x200 Wp Mono PERC PV, module, 6x100 Ah 12.8V LITHIUM FERRO PHOSPHATE Battery at booth no-200, ward no-6 under Coopers Camp NAA
Proposed Estimate for black top road over on existing hard sub - base from near Rakesh Halder to Surya Kanta Majhi, Sri Guru Ashram to Gosai Ghosh House in ward no 01,under Coopers Camp N.A.A.
Proposed Estimate for black top road over on existing hard sub - base from near GOPAL MONDAL TO AJOY BISWAS,SURAJ BISWAS TO NEMAI DUTTA, PINKI SARKAR TO SACHIN ADHIKARY, DILIP SARKAR TO BIKASH BAIN, BISWAJIT HALDER TO NARAYAN HAJRA, BIBEKANANDA SAMAD
Proposed Estimate for black top road over on existing hard sub - base from near NEMAI MAJHI TO BAPI BARAI, NALINI MALAKAR TO MONOTOSH BAIDYA,GOPAL DAS TO JHUMA GHOSH, GANASH BARAI TO RADHYASAM SARKAR, NIKUNJA HALDER TO SARASWATI MISTRY, IN WARD NO
Estimate for the work of Supply, Installation /Erection and commission of 12 m high octagonal with 200 w LED flood light system at park opposite Halder Builders of Ward no - 03, Booth no - 195 (Priority - 04) under Coopes Cmp NAA
Construction of Community toilet Sukata Smrity Primaty School at ward no 11,UNDER COOPERS CAMP.N.A.A.
Construction of Community toilet Netaji Sebasingh Primary School at ward no 7,UNDER COOPERS CAMP.N.A.A.
Construction of Community toilet Ramkrishna Primary School at ward no 6,UNDER COOPERS CAMP.N.A.A.
Construction of Sajaldhara near Chhotonaldaha Purba Mathpara SSK at Chhotonaldaha Sansad IX under 15th FC Tied Fund Activity Id 110208687 SL No 05
Construction of solar light Infrant of Naba Kumar Sarkar, Ashok Das, Haripada Sadhuka, Jagadish Sarkar house at Natapuli, APAS/01/091/ 170/0003
Construction of Community toilet near Coopers colony high School at ward no 5 UNDER COOPERS CAMP.N.A.A
Operation and Maintenance of 2(Two) Nos. AIRPs at Khanjipur Bahadurpur of capacities 21 and 16 cum/hr respectively in Tehatta-I Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Internal Electrification to set up Municipal Fresh Waste Precessing Plant ........... ......... .......... for Proposed 49 TPD Municipal Waste Processing Plant under S. W.M Project within Nabadwip Municipality.
Construction of Community toilet near Community hall at ward no 4,UNDER COOPERS CAMP.N.A.A.
Operation and Maintenance of 2(Two) Nos. AIRPs at Helenchi Zone-I Taldaha of capacities 65 and 43 cum/hr respectively in Krishnaganj Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Construction of Community toilet Rabindra Primaty School at ward no 4 UNDER COOPERS CAMP.N.A.A.
CONSTRUCTION OF CC ROAD FROM THE H/O NASIR SK TO THE H/O ISLAM SK AT GHORAIKHETRA
Construction of New Pump House and Installation of Submersible pump and other allied works at Industrial Training Institute, Kalyani, Nadia.
HIGH MAST LIGHT INSTALLATION AND SHED AT GHORAIKHETRA FOODBALL GROUND
Construction of community toilet ishwar Chandra primary school at ward no 2,under Coopers Camp N.A.A
Operation and Maintenance of 2(Two) Nos. AIRPs at Helenchi Zone-II Helenchi Zone-III of capacities 39 and 49 cum/hr respectively in Krishnaganj Block under Nadia Arsenic Civil Division-II , PHE Dte. (Period of work 1 year)
Installation of Solar Street Light (9 nos) from Battala to H/O Habibur Sk under Plassey-II G.P
Construction of modified community leach pit (5HH, 25nos) Phase-II at Kanthalberia Under Bethuadahari-I GP
Electrical Installation work of Server Room for CCTV Surveillance System at COM and JNM Hospital, Kalyani
AMC for 7 nos. existing Xerox Machine with supply of consumable or spare parts under the office of the EE, ND, P.W.Dte. and at different establishments of the AEs under this Division located at Krishnagar and Plassey during the year 2026-27
Installation of open gym with shade structure in front of Pandabpara Primary School under Plassey-II G.P
Day to day repair, Operation maintenance of distribution system, rising main and allied pipelines (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Rajapur PWSS
INSTALLATION OF SOLAR HIGH MASTA LIGHT NEAR JUMMA MASJID AT GHASURIADANGA .
Custom Bid for Services - Procurement of Fire Pump 700M3 PER HR AND 105M head Spares at LPG BP Bottling Plant Kalyani Similar Category Customized AMC/CMC for Pre-owned Products
Balla piling beside road from H/O Yasin Sk to H/O Nimai Sk under Plassey-II G.P
Internal Electrification to set up Municipal Fresh Waste Precessing Plant ........ .......... ....... for Proposed 37 TPD Municipal Waste Processing Plant under S. W.M Project within Chakdaha Municipality.
INSTALLATION OF TUBE WELL AT DARAPPUR NUTANPARA PRIMARY SCHOOL SURROUNDING AREA AT HINGNARA G.P APAS SCHEME ID- APAS/01/093/3/0010
Balla piling beside road from H/O Darai Sk to H/O Taru Sk under Plassey-II G.P
Installation of Solar street light (10 Nos) at various places under Polling Station area 80/08 under Plassey-II G.P
Construction Of Cultural Shade at Khidirpur Lankapara Hari Mondir (30x25) APAS/01/081/102/0003
Installation of Solar Street Light (10 nos) at various places under Polling Station area no 80/07 under Plassey-II G.P