Loading…
Loading…
10,656 results • Latest
E. Rewinding and repairing of Submersible Motor of different capacities (15HP -3nos) and make with repairing of Submersible Pump Bowl Assembly at Ranaghat-II (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the year of 20
Installation of Solar street light at near h/o Saharul Mistri at Kamari under hatgachha gp
CONSTRUCTION of RCC Drain with slab by cement concrete from L/ O NELA SK TO L/ O KHAGEN SARDAR AT SANSAD NO VI( AAP- 72/2025-26), ID- 114187871
D. Rewinding and repairing of Submersible Motor of different capacities (17.5-20 HP -10 nos) and make with repairing of Submersible Pump Bowl Assembly at Ranaghat-II (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the ye
Outsourcing of Contractual Manpower at Academy of Animal Resources Management (AARM) at Haringhata, Simhat, Nadia, PIN-741246 under West Bengal Livestock Development Corporation Limited, LB-2, Sector-III, Salt Lake City, Kolkata forthe F.Y. 2025-26
Construction of 5 nos. BFS road several placeses of booth no.- 116 and 118 of ward no.-03 under APAS under Santipur Municipality, P.O.- Santipur, DT.- Nadia
Construction of ACR for Nazirpur Sarada Balika Vidyalaya under Chhitka G.P. under Tehata-I Development Block. Under MDW fund.
C. Rewinding and repairing of Submersible Motor of different capacities (22.5 HP -05 nos) and make with repairing of Submersible Pump Bowl Assembly at Chakdaha (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the year of
Construction of CC road from the house of Labib Sk to Iqbal Sk (30x2.6 mtr) PS No.-245
Consctruction of plat from and shed at Gopalpur Star Sangha club of ward no.-03, Booth no.-118, under APAS P19.
CONSTRUCTION OF HIGH DRAIN WITH SLAB FROM H O JAINAL SK TO H O BAPAN SADHUKHAN AT SANSAD NO I ( AAP- 73/2025-26), ID- 114190571
Rewinding and repairing of Submersible Motor of different capacities (17.5-20 HP -10 nos) and make with repairing of Submersible Pump Bowl Assembly at Chakdaha (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the year of
Construction of G.C.I. Shed at Gopalpur Daskhin para Dargatala by the side of Gopalpur Dakhin para of Ward No. - 03, booth no.-117, under APAS P1
Installation of solar light near h/o Mamun Mandal at Kamari under Hatgachha gp
construction of paver block in front of Kalimata Temple by the side of Sharat roy lane of ward no.-03, Booth no.-115 under APAS ( P12).
Purchase of Elecytric Motor, Water Purifier (RO) at Health Sub-Centre PS No.-203
Construction of cc. road from h/o Alaruddin sk to Dhalai Rasta at kamari under Hatgachha gp
CONSTRUCTION OF HIGH DRAIN WITH SLAB FROM BHALUKA HIGH SCHOOL TO DURGA MANDIR AT BHALUKA ( SANSAD NO VII) ( AAP- 75/2025-26), ID- 114197894
Construction of 2 nos. concrete road of several placeses of booths no.-117 and 118 of ward no.-03 under APAS, under Santipur municipality, P.O.-Santipur, DT. - Nadia.
Procurement of spare parts for 200 TPD Poultry Feed Plant at Kalyani, D-23, Industrial Area, Post-Kalyani, Dist.-Nadia-741235 under West Bengal Livestock Development Corporation Limited for the year 2025-26
Construction of 8 nos. concrete road of several placeses of booths no.-115,116,117, and 118 of ward no.-03 under APAS, under Santipur Municipality, P.O.- Santipur , DT. - Nadia
A. Rewinding and repairing of Submersible Motor of different capacities (17.5-20 HP -6 nos) and make with repairing of Submersible Pump Bowl Assembly at Kalyani (A-I) Sub-Division under Kalyani (Agri - Irrign) Division, Kalyani, Nadia for the year of
CONSTRUCTION OF CC ROAD FROM H O MAKBUL TO MASJID AT BHALUKA (SANSAD NO VI ) under Bhaluka GP under 15th FC 2025-26 AAP- 102/2025-26 ) ID- 111570444
SUPPLY INSTALLATION AND COMMISSIONING OF 6 NOS 30W SOLAR LED STREET LIGHTING SYSTEM AT VARIOUS PLACE UNDER 81/15 POLLING STATION AT SITACHANDRAPUR
25078S FROM OUR KALYANI WORKS TO INDIAN ARYA IRON AND STEEL COMPANY PRIVATE LIMITED, KENDUJHAR, ODISHA-758036 BY 01 TRAILER 40-8-8 FT, 25102S FROM OUR KALYANI WORKS TO WELSPUN CAPTIVE POWER GENERATION LIMITED, SURVEY NO 671 AND 672, DIST- KUTCH, GUJARAT-370110 BY 01 TRUCK 19FT, 24162S FROM OUR KALYANI WORKS TO HINDALCO INDUSTRIES LIMITED, SINGRAULI-SIDHI ROAD, P.O BARGAWAN- 486886, DIST SINGRAULI M.P. BY 01 ODC TRAILER 40-9-9 FT, 25051S FROM OUR KALYANI WORKS TO TATA STEEL LIMITED, GAMHARIA STORE, GAMHARIA - 832108, JHARKHAND BY 01 ODC TRAILER 40-9.5-9.5 FT, 25054S FROM OUR KALYANI WORKS TO JSW STEEL LIMITED, P.O. GEETAPURAM, PIN-402107, RAIGAD-MAHARASHTRA BY 01 ODC TRAILER 40-9.5-9.5 FT, 25094C FROM OUR KALYANI WORKS TO SHYAM SEL AND POWER LTD, BIJAY NAGAR MORE, RAIGANJ, DIST-BURDWAN, PIN-713362, WEST BENGAL BY 01 ODC TRAILER 40-9-9 FT, WEST BENGAL BY 03 NOS TRAILER 40-8-8 FT, 25099C FROM OUR KALYANI WORKS TO JSW STEEL LIMITED, VILLAGE DOLVI, RAIGAD-MAHARASHTRA BY 01 TRUCK 19FT, 25101S FROM OUR KALYANI WORKS TO BHARAT PETROLEUM CORPORATION LTD.KOCHI REFINERY, KOCHI, ERNAKULAM, INDIA-682302 BY 01 TRUCK 19FT, 25105S FROM OUR KALYANI WORKS TO JAMNAGAR UTILITIES AND POWER PRIVATE LTD, DAHEJ MANUFACTURING DIVISION, TALUKA-VAGRA, GUJARAT BY 01 TRUCK 19FT, 25122S FROM OUR KALYANI WORKS TO TATA STEEL LIMITED, SUPPLY MANAGEMENT DEPARTMENT, JAMSHEDPUR-831001 BY 01 OPEN DALA TRUCK 28FT, 25124C FROM OUR KALYANI WORKS TO JJINDAL UNITED STEEL LIMITED, KALINGANAGAR INDUSTRIAL COMPLEX, DIST-JAJPUR-755026 BY 01 TRUCK 19FT
Bamboo Piling from Mohan Roy towards Chandi Roy House, L-80 Mtr
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO H O JUMAT ALI SK AT ANANDABAS (SANSAD NO III) under Bhaluka GP under 15th FC 2025-26 ( AAP NO- 114/2025-26 ) ID- 111593314
Construction of 2 nos. concrete road of several placeses of booths no.-116 of ward no.-03 under APAS, under Santipur municipality, P.O.-Santipur, DT. - Nadia.
CONSTRUCTION OF CC ROAD FROM H O SUKURALI SK TO H O JAMAT MONMDAL AT SANSAD NO V underBhaluka GP under 15th FC 2025-26 (AAP- 130/2025-26 ) ID- 113685516
CONSTRUCTION OF CC ROAD FROM H O GURU GHOSH TO H O KABIR GHOSH AT HATDANGA (SANSAD NO XV) under Bhaluka GP under 15th FC 2025-26 ( AAP-133 /2025-26 ( ID- 113704495 )
Installation of tubewell at Shibnagar I.C.D.S Centre under Debagram G.P
CONSTRUCTION OF CC ROAD FROM H O DEBESH KIRTTANIYA TO H O MADHAB AT Bhaluka( SANSAD NO X ) under Bhaluka GP under 15th FC 2025-26 (AAP- 106/2025-26 ) ID- 111577299
CONSTRUCTION OF CEMENT CONCRET ROAD FROM H/O MALEK TO H/O KHALEK at Bhaluka( sansad-6) under Bhaluka GP under 15th FC 2025-26
Construction of CC road from the entrance of Shibnagar Primary School to Katwa Road under Debagram G.P
25110C FROM OUR KALYANI WORKS TO SHAKAMBHARI ISPAT AND POWER LTD, BARTORIA-723121, WB, INDIA BY 08 NOS STD. TRAILER 40-8-8-FT- WT-20 TON, INDIA BY 04 NOS ODC 40-9.5- 9.5 FT WT- 20 TON, 25112S FROM OUR KALYANI WORKS TO NUCLEAR POWER CORPORATION OF INDIA LTD.RAWATBHATIA ATOMIC POWER PROJECT 7 AND 8, ANUSHAKTI, VIA-KOTA RAJASTHAN, CHITTORGARH-323303 BY 19FT TRUCK WT-6TON, 25114S FROM OUR KALYANI WORKS TO JAWAHARPUR THERMAL POWER STATION, EXECUTIVE ENGINEER, MALAWAN, ETAH - 207001, UP BY 19FT TRUCK WT-6 TON, 25121S FROM OUR KALYANI WORKS TO JAI BALAJI INDUSTRIES LIMITED, UNIT- III, PO-RAJBANDH, DURGAPUR-713212 BY 01NO ODC TRAILER 40-9-9FT WT- 20 TON, 25134S FROM OUR KALYANI WORKS TO GRASIM INDUSTRIES LIMITED, UNIT GRASIM ENERGY CENTRE, DISTRICT-HARUCH, GUJARAT, PIN- 392012 BY 01NO 19FT TRUCK WT- 6 TON
Installation of Solar High Mast Light at Chakundi More under Debagram G.P
Construction of Kitchen Shed and Installation of Mark-II Tubewell at 126 No ICDS Center
Installation of Solar Pumping purified community Drinking water Project at Mobarakpur Sibtala Mandir under Tehatta-I Development Block.
Emergent repairing work in Patches of Sec-1 of Quality Control Sub Division No.I considering West Bengal Legislative Assembly Election 2026 for smooth vehicular movement before and during poll under Nadia Highway Division No.II
Construction of drain with cover from Nitya Ghosh house to Mahadeb Pal house at Jitpur
Modification of ecological park near Binodnagar High School Under Kanainagar G.P. under Tehatta-I Development Block.
FROM OUR KALYANI WORKS TO STEEL AUTHORITY OF INDIA LIMITED, DURGAPUR STEEL PLANT, SINTER PLANT SITE, DU
Patch Repair Work on Krishnagar Hanskhali Road from 5.00 kmp to 6.00 kmp under Quality Control Sub Division No I of Nadia Highway Division No II during the year 2025 26
Mahisbathan Murutia to KNN Road - Patch repairing work in stretches at Ch. 6.00kmp to 9.00kmp under Plassey Sub-Division, P.W.Dte. during the year 2025-26
Repairing and renovation of Police Guard room adjacent of EVM Warehouse situated within the Collectorate campus
brother Electrophotography/Xerography (Laser/LED) Monochrome (Black) A4 and Legal Size Multifunction Printer (MFP) Brand: brother (Detailed Description/Specification as per Product # 1 of GeM Contract
Construction of Bituminous road by use of waste plastic from the House of Anil Mandal towords Jame Masjid at Nawdapara under Tehatta G.P. under Tehatta-I Development Block.
Repairing of cover Drain with BT Road from the shop of Katu Modak to House of Sitaram Haldar under Tehatta-I Development Block.(3rd Call)
Repairing and renovation of Tehatta Natunpara Primary School Under Tehatta G.P. under Tehatta-I Development Block
CONSTRUCTION OF KITCHEN SLAB FOR KEEPING GAS OVEN AND LPG CYLINDER OF ANGANWADI CENTRE(206 NOS) UNDER TEHATTA-I DEV BLOCK(ANNEXURE-I)