Loading…
Loading…
726 results • Latest
Installation of LED flood light System at Kadamtala Play Ground under GP Kadamtala
Stable Bleaching Powderfor Householdand Industrialuse (V3) conformingto IS1065 (Part1) (Q3)
Up-gradation of Rural Road from SH Connection Near Adhi Industries to Buddadev house to Krishnapuri Road Laxman Biswas Road under PMGSY-III, Batch-I, 2024-25, Package No AN03DP307, Length 2.399 km under CD, APWD, Diglipur
Up-gradation of Rural Road from NH Connection Near Sikder Bar and Restaurant to NH Connection Near Vidayasagar Pally Ward No.2 under PMGSY-III, Batch-I, 2024-25, Package No AN03DP308, Length 1.728 km under CD, APWD, Diglipur
AR and Mo Non-residential buildings under SD-II, CD, APWD, Diglipur during 2025-26. Sw- Minor repair works in students toilet including providing ramp for Pwds in at GSS Madhupur
AR and MO State Highway -15, under SD-II, CD, APWD, Diglipur during 2026-27 Sw- Supplying of Mini Hydraulic Excavator Machine EX-35 as and when on required basis under Madhupur Section
Running and maintenance of trucks under Section- III(Swadeshnagar), Sub Division-IV (EM), NACD, APIWD, Mayabunder during 2026-27. Sub work-Providing the service of Mini cargo van for a period of six month for Section - IIl (Swadeshnagar) under Su
A/R and M/O District Road under Sub - Division No.I, NACD, APWD, Mayabunder during 2026-27. SW- Desilting of existing drain along District Road from Panighat Junction to Mayabunder Jetty under Sub - Division No.I, NACD, APWD, Mayabunder.
Construction of Water Treatment Plant at Nischintapur under SD-III, CD, APWD, Diglipur. Sw- Modification of existing pumping Arrangement at Pump House No.02 for supplying raw water to the Water Treatment Plant at Nischintapur
A/R and M/O State Highway under Sub - Division No.I, NACD, APWD, Mayabunder during 2026-27. SW- Desilting of existing drain along State Highway at Karmatang under Sub - Division No.I, NACD, APWD, Mayabunder.
Improvement and Replacement of damaged pipe line at Karmatang-IX under Sub - Division No.I, NACD, APWD, Mayabunder. SW- Balance work.
Providing floor and wall Tiles inside Block-C, Block-D of Boys Hostel of MGG College at Karmatang under SD-I, NACD, APWD, Mayabunder.SW-Balance Work.
Renovation of false ceiling of Auditorium building of MGG College at Karmatang under Sub - Division No.I, NACD, APWD, Mayabunder. SW- Wood work and sanitary fittings.
Renovation of false ceiling and roofing in TV Room and Mess Boys Hostel MGG College at Karmatang. SW- Providing and fixing PVC doors and window shutters.
Renovation of False ceiling of old block of Girls Hostel MGG College at Karmatang under Sub - Division No.I, NACD, APWD, Mayabunder. SW- Conduct of Total Station/DGPS Survey, Architectural Planning, Structural Designs, BOQ for RCC and Reinforcement
Engaging of Workers on as and when required basis for sanitation work DD collection of garbage from HH commercial and other establishments, loading unloading of wastes to cluster, cleaning of footpaths, drains, CSCs, segregation shed
Construction of G.I fencing with gate around the VSD Chainpur under Sub-Division No.II, NACD, APWD, Mayabunder
Sweeping Broom (V5) (Q4), Domestic Wiper/Wiper Mopper (V3) (Q4), Disinfectant Fluids, Phenolic Type (V5) conforming to IS 1061 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Rechargeable LED Bulb (V2) (Q2)
R and M of water pumps at Diglipur Headquarter and Rural areas under EE, CD, APWD, Diglipur during 2026-2027. Sw- Modification of existing 52 HP pump set including Co RCC foundation for modified pump set at Kalighat Pump House, Diglipur
Renovation of Cattle Travis for VSD Laxmipur under SD-II, CD, APWD, Diglipur. Sw- SITC of 01 No. 2.0 Ton Air Conditioner in the Operation Theatre of Veterinary Hospital, Diglipur
Acquisition of Stock, under EE, CD, APWD, Diglipur during 2026-27. Sw- Procurement of materials for Independence Day Celebration 2026
Up-gradation of Multipurpose Farm Keralapuram under SD-I, CD, APWD, Diglipur
Outsourcing of 25 Nos of Manpower for Zilla Parishad, N andM Andaman.(August to November 2026)
A/R M/o Rural Road under Sub Division No. I, NACD, APWD, Mayabunder during 2026-27.SW-Felling / Trimming of trees standing dangerously, vide SDM, Mayabunder Conditional Order No. 346, dated 09/12/25 and No. 353 dated 08/04/2026 in Pokkadera
A/R M/O Non -residential Building under Sub-Division No.II, NACD, APWD, Mayabunder during 2026-27.SW-Arrangement of At Home Function on the occasion of Republic Day Celebration at Camp Office cum residence at Deopur ,Mayabunder
A/R M/O District Road under Sub Division No.I, NACD, APWD, Mayabunder during 2026-27.SW-Felling of Trees (03 Nos. Siris and 01 No. Gulmohar) as per Conditional Order No. 360 of 19th June 2026
Construction of 02 Nos. of Class room (Single Storied) with toilet including IEI at GPS Bamboo Nallah-II under Sub Division No. II, NACD, APWD, Mayabunder.SW-Cutting and removal / trimming of 06 nos. dangerous tree standing within the premises of PM
Stable Bleaching Powderfor Householdand Industrialuse (V3) conformingto IS1065 (Part1) (Q3)
Construction of Threshing Floor and Drying Yard with Carbon Fiber Transparent Roof at Seed Multiplication Farm, Nimbudera, Mayabunder
A/R M/O State Highway under sub division No.I, NACD, APWD, Mayabunder during 2026-27.SW-Construction of RCC drain from Ch.2315.75mtr to 2325.75mtr (LHS) along State Highway
A/R M/O State Highway under sub division No.I, NACD, APWD, Mayabunder during 2026-27.SW-Construction of RCC drain from Ch.2315.75mtr to 2340mtr (RHS) along State Highway
Medals (V3) (Q4), Trophy (V2) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Table Tennis Rackets (Q3), Field Hockey Sticks as per IS 829 (Q3), Javelins as per IS 4613 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Table Tennis ball (V3) (Q4), Shuttlecocks (V2) Conforming to IS 415 (Q4), Badminton Racket (V2) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Shin Guardfor Football (Q3)
Cricket Bat (V2) Conformingto IS828 (Q3)
Earth Work in excavation for removing excess soil to protect newly constructed Retaining Wall near Labour Barrack at Nimbudera Camp (North and Middle Andaman Range) under WP Division
A/R M/O Non- Residential building under Sub Division No.I, NACD, APWD, Mayabunder during 2026-27.SW-Erection of Temporary Pandal, providing roofing ,over staging and other related works for celebration of Independence Day 2026
A/R M/o Water Supply under Sub Division No. I, NACD, APWD, Mayabunder during the year 2026-27.SW-Repair and Maintenance of Water Supply, State Highway, Residential and Non-Residential building whenever required for Karmatang Section and Maintenance
AR and MO water Supply under EE, CD, APWD, Diglipur during 2026-27. Sw- Hiring of Engine Dinghy for Inspection work under the jurisdiction of CD, APWD, Diglipur
Supplying, Installation, Testing and commissioning of 01 nos. 1.5 Ton Air Conditioner at NAFIS Work Station, SP Office at Mayabunder, North and Middle Andaman.
Supplying , Installation , Testing and Commissioning of 03 Nos. 02 Ton Air Conditioner at Conference Hall of SP Office , Mayabunder.
Stable Bleaching Powderfor Householdand Industrialuse (V3) conformingto IS1065 (Part1) (Q3)
Renovation of beat office at milangram
Construction of 2 Nos Reservoir 7.5 ML capacity at Mohanpur Ward No.05 and Ward No.08 under SD-III, CD, APWD, Diglipur. Sw - Providing Barbed wire fencing for the rain water harvesting reservoir at Mohanpur Ward No.05 and Ward No.08
Stable Bleaching Powder for Household and Industrial use (V3) conforming to IS 1065 (Part 1) (Q3)
BASE CONCRETING OF 100 NOS FOREST BOUNDARY
Stable Bleaching Powderfor Householdand Industrialuse (V3) conformingto IS1065 (Part1) (Q3)
Stable Bleaching Powderfor Householdand Industrialuse (V3) conformingto IS1065 (Part1) (Q3)