Loading…
Loading…
94 results • Latest
V BELT E -330, V BELT C-90, V BELT B-85, V BELT B-30, V BELT B-33, V BELT D-538
VVSDPL ONSITE MFM CALIBRATION
Upgradation of COA for reporting Train Arrivals/Departures over Vijayawada division.
Vijayawada Division: Signal and Telecom Department: S&T works in connection with (1) Proposed Interlocking of mid section manned LC gates No. 69 at Km60/26- 28, 76 at Km 66/24-26 in BZA-BVRM section and LC 37 at Km.30/36-38 GDV-MTM section of Vijayawada division. (2) Provision of EOLB in lieu of mechanical lifting barrier gates at 9 interlocked LC gates over Vijayawada division.
Work Contract for Supply and Deployment of Technical Manpower required for IWAI Sub Office at Vijayawada forexecution monitoring and supervision of project
SUPPLY INSTALLATION TESTING COMMISSIONING AND TRAIL RUN OF MACHINERY AND EQUIPMENT FOR SOCIETY FOR ELIMINATION OF RURAL POVERTY ANDHRA PRADESH SERPAP