Loading…
Loading…
10,999 results • Latest
Restoration of eroded left bank of river Darakeshwar for a length 25 meter at Bhandar beria, mouza -Bamnia, Block PS-Indus DIST-Bankura, Under Damodar Canal Division
Emergent Repair of Damaged Spur along the right bank of Damodar River at Mouza- Kenety, Block P.S. Sonamukhi, Dist- Bankura under Damodar Canal Division. (Spur no 11,12,13,14,15)
Restoration of damaged right bank of River Damodar dwarf bundh for a total length of 200 metre at Ghatpar, Samitimana, Pandey para Mouza -Nitynandapur, Block P.S.- Sonamukhi, Dist. Bankura under Damodar Canal Division
F.M.P work at Damodar Left Embankment In-betweench. 56.00km , ch.60.00 km under Sarangpur (I)section of Edilpur (1) Sub-Division within Damodar Canal Division for the year 2025-2026
FMP at Damodar Left Embankment in between ch. 52.00 KM and 55.00 KM under Palla (1) section of Edilpur (1) Sub-Division within Damodar Canal Division.During the year 2025-26
F.M.P work at Damodar Left Embankment in between ch.41.00 KM and 47.00 KM under Amirpur section of Edilpur (1) Sub-Division within Damodar Canal Division for the year 2025-2026
F.M.P work at Damodar Left Embankment in between ch. 0.00 KM and 7.500 KM under Gohogram section of Edilpur (1) Sub-Division within Damodar Canal Division for the year 2025-2026
CONST OF CC ROAD FROM UTTAM GANGULI HOUSE TO PRABHAS MUKHERJEE HOUSE AT KARKONA ID- APAS/01/274/234/0002
CONST OF CC ROAD FROM PWD TO SWASAN AT KARKONA AT BOOTH 234 APAS/01/274/235/0003
CONS OF PUCCA COVERED DRAIN FROM PWD ROAD TO NUR ALAM FIELD AT ARJUNA
Soil Investigation for rejuvenation of cross regulator gate (Four vent) across Kanki River including protection work at the downstream right side of village -Karanda, GP-Nabasta, Block-Burdwan-II, Dist-Purba Bardhaman
Supplying unskilled mazdoor for watching, guarding and operation of Regulator gates at (ch.262.00, ch.333.50, ch.408.00, ch.482.00, ch.539.00, ch.579.00, ch.629.00, ch.664.00, ch.751.00, ch.806.00, ch.953.00) of 1/BC and (ch.0.00, ch.115.00)
CONSTRUCTION OF CONCRETE ROAD FROM KANCHAN MALLIK HOUSE TO SHUBAS MALLIK HOUSE WITH CULVART AT GANDHARBOPUR 16
Construction of 6 nos Outlets at ch.14.60, ch.32.80, ch.58.00, ch.92.50, ch.142.60, ch.178.00 of Dy- 4C canal at Block- Galsi-II under Sanko Section of D.C. Hd.Qtr. Sub Division within D.C. Division.
CONSTRUCTION OF CONCRETE ROAD FROM ANSWAR SEKH HOUSE TO GADAI SEKH HOUSE AT CHANDIPUR 08
Construction of a culvert over river Banka at Village Baramosagaria under GP- Kuchut,Block-Memari-II, Dist-Purba Bardhaman
Protection restoration of eroded banks of branch 12 of Dev Khal -1 near Baira football ground for a length of 55.00 mtr at right bank and 15.00 at left bank under block-Raina-I, Dist- Purba Bardhaman
Annual maintenance for servicing of hoisting equipment of cross regulator vertical gates at Ch. 933, 990, 1000, 1100, 1180, 1245 1467 of DBC at Guskara Sub-Division under D.H.W Division, Durgapur during the year2026-27
Annual maintenance for servicing of hoisting equipment of cross regulator vertical gates at Ch. 360, 585, 704, 838, 1074, 1245, 1467, 1543 of PBC at Guskara Sub-Division under D.H.W Division, Durgapur during the year2026-27
M/R to the embankment of left right bank of Old gangur in between off take and Reg gate at Mouja- Bazesalpur in Block- Bardhaman-Il in the District o Purba Bardhaman within Alamganj Section of D.C. Head- Qtr. Sub Division within D. C. Division
Raising, strengthening of existing dwarf bundh at right bank of Deb khal-1 for a total length of 900 m at Mouza-Barabainan, Block-Raina-II, Dist-Purba Bardhaman
Maintenance of x- reg gate on Dev Khal at Bayra by Replacing damage gates gate parts by new one including floor repairing under Shyamsundar (1) Section of Seharabazar (1) Sub Division of Damodar Canal Division
M/R to Water Course WC-48.00 of 6AMC of D.C NO-I Sub Division under Damodar Canal Division
Urgent running maintenance of Electro Mechanical gate hoisting systems including supported electrical Mechanical system (DG, Power DB, Spot Panels, Rope, screw rod etc) in LBMC system ..during Boro Irrigation FY 2025-26.
Maintenance Repair of Dwarf Embankment of Damodar River at Mouza- Balarampur, GP-Berugram , Block-Jamalpur, Dist-Purba Bardhaman. Under Damodar Canal Division during the year-2025-2026
GRAY WATER MANAGEMENT COLLECTION INFRASTRUCTUR TRETMENT WITH COVER SLAB FROM NADI PAR SHAMBHU MALLAV HOUSE TO NADIR JAMI AT BASATPUR 01
Urgent running maintenance of Electro Mechanical gate hoisting systems including supported Electrical Mechanical system (DG, Gate hoisting system etc) in LBMC system from Ch. 324 to 1193 during Boro Irrigation FY 2025-26.
Replacement of Four (04) nos damaged vertical gates at Banka weir, at Kanchannagar, Block- Bardhaman-I, Dist - Purba Bardhabardhan
M/R to the embankment in between Ch. 2555.00 to 2560.00 (R/B) Ch. 2565.00 to 2590.00 (R/B) and Ch. 2670.00 to 2685.00 (R/B) of LBMC at Mouja- Amirpur Belna Bazesalpur in Block-Bardhaman-I Bardhaman-Il in the District o Purba Bardhaman within Al
GRAY WATER MANAGEMENT COLLECTION INFRASTRUCTUR TRETMENT WITH COVER SLAB FROM DEBU KONAR CHATAL TO CHARA BAGAN AT KUCHUT05
M/R to DLE in-between ch. 8.00 to 9.00 km, 9.100 to 10.500 km including Inspection path. For a total length of 2400 mtr in Gohogram within Block-GALSI-II, P.S.- GALSI-II,, Dist. - Purba Bardhaman
Annual maintenance for servicing of hoisting equipment of Dy-gates of DMC from Ch.0 to Ch.730 under D.H.W Division Dist-Bardhaman Purba ,Paschim during the year 2026-27
Annual maintenance of Head Regulatory, Cross Regulatory W/C gates at different chainage (Ch.1859 to Lohai Tank) for Kharif and Boro irrigation of RBMC under Seharabazar Sub-Division..during the year 2026-27
Annual maintenance for servicing of hoisting equipment of cross regulatory radial gates at ch-324,540, 730, 874, 1222 of LBMC and sluice gate at ch-130,428,588 at ajoy river and Anderson weir gate at Damodar river under...during the year 2026-27
GRAY WATER MANAGEMENT COLLECTION INFRASTRUCTUR TRETMENT WITH COVER SLAB FROM TARUN RAY HOUSE TO MANSHA TALA AT SHIBPUR03
Repairing of 03 nos gate at 1532 of PBC at Guskara Sub-Division under DHW Division, Durgapur during the year 2026-27
Amader Para Amader Samadhan Schemes of Booth No 248 Palsona F.P. School under Katwa II Dev Block, Purba Bardhaman
Re-drilling against tubewell at Jabui D.T.W. (BN 158 ) including Repairing renovation of RCC pipe line Pump house with reconnection related works under Memari-II Development Block within Memari (AI) Sub Division under Burdwan(A-I) Divn
Urgent repairing and rectification work of the electrical panel and panel room at ADM Bungalow near Polo Ground, Asansol, under Asansol Electrical Subdivision II, PWD
Construction of Solar Operated Pump Dug-Well (PDW 5nos.) Cluster at Mouza-Barghata, G.P.-Rupushpur under Khyorasole Dev. Block of Birbhum District under EE(A-I), Burdwan (A-I) Division under Core-Sector programme
Repairing Rewinding of 25 HP (15 nos.) 2800/2900/3000 RPM 3Phase 23/41 Amp 380/400/440 Volts 50 cycle A.C supply Submersible Burnt Motor Pump set of different make under Burdwan (A-I) Sub-Division under Burdwan (A-I) Division
Repairing Rewinding of 20 HP (15nos.) 2800/2900/3000 RPM 3Phase 23/41 Amp 380/400/440 Volts 50 cycle A.C supply Submersible Burnt Motor Pump set of different make under Burdwan (A-I) Sub-Division under Burdwan (A-I) Division.
CONSTRUCTION OF PILLING WORK OF JUITEY PUKUR TO GRAVEYARD OF NIMO MASID MANDAL HOUSE (BOOTH NO- 137) AT NIMO-I GP UNDER MEMARI-I PS , FUND- APAS
Construction of CC road from Main road to house of Palas Ghosh at Kalibele village under Satgachia-II GP under Memari-II PS (2nd Call)
Repairing Rewinding of 15 HP (8 nos.) 2800/2900/3000 RPM 3Phase 23/41 Amp 380/400/440 Volts 50 cycle A.C supply Submersible Burnt Motor Pump set of different make under Burdwan (A-I) Sub-Division under Burdwan (A-I) Division
Construction of CC road from house of Nasim Mondal to house of Suman Mondal at Khorad village under Satgachia-I GP under Memari-II PS (2nd Call)
Construction of CC road fromTea shop of Rabi Da to house of Tarak Mondal at Gargeswar village under Bijur-II GP under Memari-II PS (2nd Call)
Repairing and rewinding of 20 H.P. Submersible Motor - Pump set (10 nos.)of different make under Kalna-II (A-I) Sub-Division under Burdwan (A-I) Division
Construction of CC road from Nur alam Sk khamar towards house of Musa Sk at Barari village under Barapalason-II GP under Memari-II PS (2nd Call)
Repairing and rewinding of 17.5 H.P. Submersible Motor - Pump set (05 nos.)of different make under Kalna-II (A-I) Sub-Division under Burdwan (A-I) Division.