Loading…
Loading…
10,975 results • Latest
REPAIRING AND UPGRADATION ( PLASTER, PAINTING .. ETC.) OF OARI F. P. SCHHOOL AT PACHIM OARI. AROUND 100 PEOPLE BENEFITED.APAS/01/259/169/0003
REPAIRING OF DRAIN ATCHOTONILPUR PIRTALA ROADFROM SK HASU TEA STALL TO SKMUNNASHOP(APAS/01/260/234/0002)
CONSTRUCTION OF NEW CCROAD AND ADJACENT DRAIN ATCHOTONILPUR PASCIM PARAFROM SK ANOWER HOUSE TOANJAN BHATTACHARJEEHOUSE APAS/01/260/234/0001 CONSTRUCTION OF NEW CCROAD AND ADJACENT DRAIN ATCHOTONILPUR PASCIM PARAFROM SK ANOWER HOUSE TOANJAN BHATTACHA
NSTALLATION OF TUBE WELL AT NOBODOY PALLY NEAR KALI MANDIR(APAS/01/260/174/0011)
CONSTRUCTION OF NEW TOILET BLOCK AT BANKA MATH(APAS/01/260/174/0001)
CONSTRUCTION OF NEW CC ROAD AT KALIBAZAR AMTALA FROM BIMALENDU SAMANTA HOUSE TO SUBIR ROY HOUSE(APAS/01/260/136/0005)
Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other u
CONSTRUCTION OF NEW CC ROAD AT KALIBAZAR FROM ARUN SAMANTA HOUSE TO AMARNATH ROY HOUSE(APAS/01/260/136/0004)
INSTALLATION OF TUBE WELL BESIDE SURJA MANDIR(APAS/01/260/174/0006)
CONSTRUCTION OF NEW CC ROAD AT KALIBAZAR AMTALA FROM MAITY HARDWARE LANE TO AMITAVA CHOWDHURY HOUSE(APAS/01/260/136/0002)
Opt. and Mtc. of Distribution System and Rising Main Pipeline(CI/DI/AC/UPVC) including repairing of FHTC Connection for NABASTHA WS Schemes of Burdwan-II Dev.Block .......... under Burdwan Divn., PHE Dte. Period for eleven months.
CONSTRUCTION OF NEW DRAIN AND ADJACENT NEW CC ROAD AT NATUNPALLY MOTOR GARAGE FROM AJAY DAS HOUSE TO SUDHAMOY CHOWDHURY HOUSE(APAS/01/260/136/0001)
ROAD REPAIR ATHAZRABAGAN ZAHURALAM SARANI BESIDEJAGABANDHU JASHSPOND(APAS/01/260/173/0005)
Laying of inter connection between 3rd tube well site (Mouza-Karanda) and distribution system for Palsit PWSS within Bardhaman-II Block , under Burdwan Division, PHE Dte
INSTALLATION OF RCCSLAB ABOVE THE DRAIN ATBONGPUR DAKKHINBHATCHALA FROMDHANAPATI COUDHURYHOUSE TO SAHADEB DANAHOUSE(APAS/01/260/173/0003)
113665307 Estimate for the Construction of Covered drain with Soak Pit from Swapan Gupta House to Guter Gore at Saraitikar of Sansad XII Under SARAITIKAR Gram Panchayat Under Burdwan-I Dev. Block.
NEW CC ROADCONSTRUCTION INBONGPUR DESHBANDHUSARANI FROM SALILCHOUDHURY HOUSE TOSANDIP MEHRAHOUSE(APAS/01/260/173/0001)
113672297 Estimate for the Construction of Covered drain with Soak Pit from Satya to Ram Bhakat at Mirzapur of Sansad XVI Under SARAITIKAR Gram Panchayat Under Burdwan-I Dev. Block.
Operation Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Nabastha PWSS of Burdwan-II Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
CONSTRUCTION OFSEATING BENCH ATBHATCHALA BASHTALANEAR BAKAMATH(APAS/01/260/172/0012)
113663652 Estimate for the Construction of Covered drain with Soak Pit from Asim house to main drain at Saraitikar of Sansad XI Under SARAITIKAR Gram Panchayat Under Burdwan-I Dev. Block.
INSTALLATION OF RCCSLAB AT BONGPUR MOREBEHIND MAHADEBSALOON TO END OF BAKARIVER(APAS/01/260/172/0007)
INSTALLATION OF STREET LIGHT AT APARNA GHAT BAKA PAR FROM POLTU BAG HOUSE TO SHIVSANKAR MONDAL HOUSE(APAS/01/260/153/0003)
INSTALLATION OF STREET LIGHT AT 2 NO SHYAMBAZAR LANE FROM GOPAL SAHA HOUSE TO JAGANNATH MONDAL HOUSE(APAS/01/260/153/0002)
Construction of Cover Drain with Soak Pit from Nasaratpur Pather Sathi toward Shni Mandir at Nasaratpur Activity Code 131310504 Sl No 179
REPAIRING AND UPDRADATION (SMART CLASS , PLASTER , COLOUR etc) OF 10 NO. ICDS CENTRE (Code No.-19335310206) AT KHUNDAPUR . AROUND 90 PEOPLE BENEFITED.APAS/01/259/169/0001
113656776 Estimate for the Construction of Covered drain with Soak Pit from Nanu to Pitch Road at Sansad VII Under SARAITIKAR Gram Panchayat Under Burdwan-I Dev. Block.
Construction of Cover Drain with Soak Pit from Nasaratpur Ananta Karmkar house toward Pathersathi at Nasaratpur Activity Code 131310144 Sl No 178
Construction of Concrete Road from Pradip Shil house to wards STKK Road via Bikash Khan house via Ratan Shil house Activity Code 131307243 Sl No 182
INSTALLATION OF STREET LIGHT AT 2 NO SHYAMBAZAR LANE FROM KADAMTALA MORE TO RAMKRISHNA MUKHERJEE HOUSE(APAS/01/260/153/0001)
Construction of Concrete Road from Chandan Basak house to wards via Shankar Basak and Uttam Basak house with wall Activity Code 131306431 Sl No 181
Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Uchitpur PWSS of Raina-I Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Chak Basatpur Single village scheme Raina-II Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
REPAIRING AND UPDRADATION (SMART CLASS , FENCING, PLASTER , COLOUR etc) OF 16 NO. ICDS CENTRE (Code No.-19335310212) AT KARIMPUR . AROUND 100 PEOPLE BENEFITED.APAS/01/259/184/0001
Operation Maintenance of Distribution System, Rising main, Sluice Valves, including operation of sluice valves for Malkita PWSS of Burdwan-I Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
Operation AND Maintenance of Distribution System , Rising main, Sluice Valves, including operation of sluice valves of Nababhat PWSS of Burdwan-I within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1 year
Repairing AND Maintenance Of Community Toilet 7 Seated At Kamarsala I In Ward No 33 Within Burdwan Municipality.
Operation Maintenance of Distribution System , Rising main, Sluice Valves, including operation of sluice valves of Palsit PWSS of Burdwan-II within Burdwan Sub- Division under Burdwan Division, PHE Dte Period for 1(one)year
Operation Maintenance of DistributionSystem,Rising main,Sluice Valves,including operation of sluice valves of Malkita PWSS of Burdwan-I Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
INSTALATION OF 06 NOS. SOLAR STREET LIGHT WITH 6M. LENGHT POLE 1) NEAR LATIF MOLLA HOUSE AT MOLLA PARA 2) NEAR ICDS CENTRE 3) NEAR CHAND MALLICK HOUSE AT SEKH PARA AND OTHERS 2 NOS
Repairing AND Maintenance of Community Toilet 2 seated at Anjirbagan Quarter in Ward No 22 within Burdwan Municipality. ODF Checklist
Opt. and Mtc. of Distribution System and Rising Main Pipeline(CI/DI/AC/UPVC) including repairing of FHTC Connection for Isufabad (Z-I and II) WS Schemes of Burdwan-I Dev.Block .......... under Burdwan Divn., PHE Dte. Period for eleven months.
Construction of Pump House cum switch room 5.40 m x 3.60 m with saitary arrangement KONARPUR 3rd TW site under DIGRA Piped Water Supply Scheme under RAINA II Block
peration Maintenance of Distribution System , Rising main, Sluice Valves, including operation of sluice valves of Raipur PWSS of Burdwan-II within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year
Construction of community Leach Pit with Silt Chamber under Bijur-I Gram Panchayat within Memari-II Dev. Block. (Total-23 nos)
Operation and Maintenance of Distribution System , Rising main, Sluice Valves, including operation of sluice valves of Sasinara Zone-II PWSS of Memari-I within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year
Construction of community Leach Pit with Silt Chamber under Kuchut Gram Panchayat within Memari-II Dev. Block
CONSTRUCTION OF NEW CC ROAD AT GARGARA GHAT FROM CHANDAN ROY HOUSE TO MANIK MONDAL HOUSE(APAS/01/260/152/0017)
Operation AND Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Parhati PWSS of Memari-II Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
CONSTRUCTION OF NEW CC ROAD AT 2 NO SHYAMBAZAR LANE FROM DEBABRATA NAG HOUSE TO MAHADEB ROY HOUSE(APAS/01/260/152/0013)