Loading…
Loading…
680 live302 closing this weekmost from DISTRICT MAGISTRATE PURULIA and Zilla Parishad
680 results • Latest
Procurement of CM-257, (Hindi & English) ( Reservation Requisition Form).
WELD PIECE WITH SIMULATED ARTIFICIAL DEFECTS MADE BY EDM SYSTEM
W90415302382: Primary Water Pump (Centrifugal) 150M3/HR, 77M, VAR-02 As Per Specification TG60729, TG9741530030: Spare Kit for PW PUMP Motor Set (660 MW Mat. Code-W90415302382) comprising of: Mechan, W90415302862: AC Motor, 75 KW, 2900 RPM, For Pump 150M3/HR., 77MWC Head. SPEC: TG60729 REV: 08
Procurement of LED-Display Board size 4Ft x 6Ft along with other accessories for Remote Display thro
Door Check Spring for BOXN Wagon.
Repairing and maintenance of new Intake Raw Water Pipeline corridor of STPS
Supply rate of different type of materials of VB-G RAM G works for Kenda GP under Puncha Block.
Supply rate of different type of materials of VB-G RAM G works for Panipathar GP under Puncha Block.
Supply rate of different type of materials of VB-G RAM G works for Puncha GP under Puncha Block.
Supply rate of different type of materials of VB-G RAM G works for Jambad GP under Puncha Block.
Supply rate of different type of materials of VB-G RAM G works for Chandra GP under Puncha Block.
Custom Bid for Services - Proposal for OEM Service Support For General Maintenance, Servicing and Troubleshooting of M/s ABB make DAVR (Model Unitrol-F) for Unit -1 of DVC RTPS Raghunathpur Similar Category Operation and Maintenance Power House/Power Plant
Locking Bolt & its Bracket for Flap door Arrangement.
Electromagnetic Disc Brake 190V DC, EM SPR-LOADED DISC BRK, SLDC170X
Clubbed Indent for (1) Procurement of Pneumatic Operated Butterfly Valve Complete Assembly for AHP
Professional Large Format Display (V2) (Q2), Cables, Converters and Adapters (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Push Rod Assembly for BOXNHL/BCNHL Wagons for KNORR BREMSE Design BMBS.
1) Construction of 05 nos. limited height subway KA-59 between Piardoba- Bishnupur, KA-79 between Ondagram-Bankura,KA-132 between Indrabil-Adra, BR- 23 between Chhandar-Brindabanpur, BR-29 between Brindabanpur-Srirampur under DEN/East/Adra. 2) Execution of balance work such as construction of Shed, Drain etc. at subway BR-37 & BR-42 between Hamirhati and Sonamukhi section. 3) Cess repair under the jurisdiction of DEN/East/Adra.
PCC Road Repairing at Pahargora Hanuman Mandir to Golkar Bundh UNDER Janardandih G.P
PCC Road Repairing from Puruno Saltore to Bogathan under Saltore G.P
PCC Road Repairing at New Colony more to Madhuban Marriage Hall UNDER Saltore G.P
PORTABLE AFTER CATION CONDUCTIVITY METER
Upgradation of STPS New Intake Pipeline Corridor Road for Civil part (Phase-I) (Capex 2025-26)
Oil Filled Service Transformers for 2X660 MW DVC
Outer Spring for bolster of CASNUB 22HS Bogie.
Custom Bid for Services - Hiring of One 01 Mobile Pick n Carry Hydraulic Crane Farana 15 MT Capacity with 20 Meter Boom Length for Two Years Similar Category Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis)
Operation and Maintenance for 10 years of the 10.315 km Puruliya Bypass Section of NH-32 including balance work and dismantling and re-construction of defective or damaged section in the state of West Bengal
Clearing and removal of water hyacinth, floating debris, municipal garbage and semi solid compact mass, including thick and thorny jungles from Ichhamati River under AMC for the period of 12 months, for a length of 52.20 Km. from Dattaphulia Bridge