Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
891 results • Latest
Package work for Removal of Jungle, Silt and Debris in Distributary No.6B Right side of NRBC in selected reaches from Ch 2.00 To 4.00km,Not Considered in ERM and Removal of Jungle, Silt and Debris in Distributary No.6B Right side of NRBC in selected reaches from Ch 4.00 To 5.00km,(Not Considered in ERM) and Removal of Jungle, Silt and Debris in Lateral No 1 of Distributary No.6B Right side of NRBC in selected reaches from Ch 0.000 To 1.200km Not Considered in ERM
Package work for Removal of silt, and jungle from ch 0.020 to1.650 of SL1 of Lat 14 of BD2 of D-9, from ch0.020 to 2.00 of Lat11 of BD 2 of D-9, from ch0.020 to 2.130 of Lat12 of BD2 of D-9, from ch0.020 to 1.710 of Lat 13 of BD2 of D-9, from ch0.020 to 1.740 of SL 1 of Lat 12 of BD2 of D-9 and from ch 0.020 to 1.710 of Lat 14 of BD2 of D-9 of NRBC
Package work for Removal of silt,and jungle from ch 0.020 to 3.120 of Lat7 of BD2 of D-9 , from ch 0.020 to 2.800 of Lat9 of BD2 of D-9 , from ch2.800 to 6.500 of Lat9 of BD2 of D-9, from ch 0.020 to 1.860 of Lat 8 of BD2 of D-9 of NRBC
Package work for Removal of silt, and jungle from ch 0.020 to 1.680 of SL3 of L9 , from ch 0.020 to 0.870 of Lat1 of SBD1 of BD2 of D-9, from ch0.020 to 1.950 of Lat 2 of SBD1 of BD2 of D-9 , from ch0.020 to 1.700 of Lat4 of SBD1 of BD2 of D-9 , from ch0.020 to 1.130 of Lat 3 of SBD1 of BD2 of D-9 and from ch 0.020 to 0.880 of Lat 6 of BD 3 of D-9 of NRBC.
Package work for Removal of Jungle, Silt & Debris in Distributary No.8A of NRBC in selected reaches from Ch 0.000 to 2.000 km and Lateral No 1 of Dy No 8A of NRBC and Removal of Jungle, Silt & Debris in Distributary No.8A of NRBC in selected reaches from Ch 2.000 to 4.300 km and Lateral No 2 And its sub lateral of Dy No 8A of NRBC
Package work of Removal of silt, and jungle from ch 0.020 to 1.440 of Lat 15 of BD2 of D-9 , from ch0.020 to 1.00 of Lat 7 of BD3 of D-9, from ch0.020 to 1.150 of Lat 2 of BD 3 of D-9 , from ch0.020 to 0.630 of Lat1 of BD3 of D-9 , from ch 0.020 to 2.540 of Lat 3of BD 3 of D-9, from ch 0.020 to 1.500 of Lat 4 of BD 3 of D-9 ,from ch 0.020 to 0.930 of Lat 5 of BD3 of D-9 , from ch0.020 to 1.100 of SL1 of Lat 4 of BD 3 of D-9 and from ch 0.020 to 1.410 of Lat 8 of BD 3 of D-9 of NRBC.
Package work for Removal of silt, and jungle from ch 0.020 to 2.100 of Lat 1 A of D-10 , from ch0.020 to 2.950 of Lat 7 of D-10 , from ch0.020 to1.870 of SL1 of Lat 5 of D-11 , from ch 0.020 to1.00 of SL2 of Lat5 of D-11 and from ch 0.020 to1.650 of Lat 9of D-11 of NRBC.
Package work for from ch 0.020 to 2.500 of D-11 A , from ch 0.020 to 1.500 of Lat 1 of D-11A , from ch 0.020 to 3.500 of Lat 4 of D-11 A , from ch 0.020 to 2.100 of R/S canal of parapur tank of Devadurga Taluk , from ch0.020 to 2.860 of Lead of drain canal of Devadurga Taluk, from ch 0.020 to 3.680 of Samapatrayanadoddi canal of Devadurga Taluk
Package work of Removal of silt, and jungle from ch 0.020 to 4.30 of Lat 7 of D-11 , from ch 0.020 to 2.570 of SL1 of Lat7 of D-11, from ch 0.020 to 1.230 of Lat 3 of BD 1of D-11 , from ch 0.020 to 1.280 of Lat 4 of BD 1 of D-11, from ch 0.020 to 1.00 of Lat 5 of BD 1 of D-11 and from ch 0.020 to 1.420 of Lat 8 of D-11 of NRBC.
Construction of Box Culvert at Km 41.20 on SH-129 chickheaarur Mudgal Mundergi in Lingasugur taluk of Raichur District. Under KRDCL 5054-80-190-0-01-132 for the year 2026-27.
Procurement of Gear Box Output shaft for HP-803 mill of RTPS
Procurement of Hydrazene hydrate for RTPS
SUPPLY, SITE FABRICATION AND ERECTION OF MANUAL STONE-PICKING PLATFORMS AT STRATEGIC LOCATIONS OF BELT CONVEYOR NUMBERS 2A, 2B, 2C AND 2D AT YTPS CHP AREA
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Repair and Maintenance of UGD in Raichur City
Procurement of Digital Temperature & Position Indicator and Silica Gel
Supplying, Errection and Testing 30KVA DG Set to KVK Building at UAS, Campus Raichur.
Supplying & Errection of LED Street Light Pole & Accessories to Horticulture Circle to New MARS at UAS, Campus Raichur.
Applying Painting in Nisarga Hostel and Other Works at UAS, Campus Raichur.
Renovation of Roofing of Seed Godown No. 1 (Balance Front Half Portion) at UAS, Campus Raichur.
Providing Electrification Extra Power Point to Mushroom Production Technology Laboratory in Agri. College at UAS, Campus Raichur.
Repairs to Cow Shed & Providing Chain link Fencing Near Dairy Section at UAS, Campus Raichur.
Removing & Re-Errection of Vehicle Parking Shed at New Research Complex Building at UAS, Raichur.
Compression Testing Machine
Static Protective Relays (Q3)
Static Protective Relays (Q3)
Removing of jungle and silt from ch 9.00 to 12.00 Km & from ch 16.00 to 18.00 Km of Dy no.21 of SBC.
Removal of Jungle and silt from Ch 0.00 to 2.00km and 2.00 to 4.10km of Dy-11A of SBC.
Restoration of CC lining at Ch.1.6,1.70km of Dy-19 of SBC.
Removal of Silt and Jungle Clearance from Ch 0.000 to 2.600 km of Dy-11B of SBC
Removal of Silt and Jungle Clearance from Ch 0.000 to 2.800 km of SL-1R, from Ch 0.00 to 1.380 km of SL-2R & from ch 0.000 to 1.540 km of SL-3L of Lat-7 of Dy-12A of SBC
Removing of jungle and silt from ch.2.50 km to 4.00 km and ch 4.00km to 5.50km of Dy-17 of SBC.
Scour filling & Restoration of Lining at Ch 8.30Km & 10.63Km of Dy-21 of SBC
Restoration of CC lining Ch 0.38km, Ch 0.56 km of Lat-4 of D-17 and CTC at Ch 0.965 km of Lat-4 of D-17 and Restoration of CC lining Ch 3.3km Ch 3.4 km of D-17 of SBC.
Restoration of CC lining from Ch 2.40 to 2.50km of Lat-16 of Dy-09 of SBC.
AME of Machinary from Ch 40.00 to 52.00 km including distributries and laterals for the year 2026-27
AME of Machine for SBC Main canal from Ch 30.00km to 40.00km including distributaries and laterals for the year 2026-27
Removal of jungle & silt and improvement to SR from ch.0.00 km to 3.00 km of Dy-16B of SBC.
Removal of Silt and Jungle Clearance from Ch 0.000 to 3.800 km of Lat-6 of Dy-12A of SBC and from Ch 0.000 to 1.600 km of Lat-3 of Dy-12B of SBC
Installation of Trash Rack at siphon Inlet at Ch 6.5km of Dy-9 of SBC.
Repairs to Drops & Restoration of Lining at Ch 1.26Km, 4.15Km & 7.43Km Dy-14 of SBC
Removal of Jungle and silt from Ch 11.50 to 13.50km and 13.50 to 15.50km of BD-09 of Dy-9 of SBC.
Removal of Jungle and silt from Ch 15.00 to 17.00km and 30.00 to 32.00 km of Dy-9 of SBC.
Restoration of Deck slab CTC at ch 12.50 km of BD-9 of DY-9 of SBC
Restoration of Deck slab CTC at ch 28.10 km of DY-9 of SBC
AME of Machinery SBC Main Canal from Ch 52.00 to 63.00 km including distributries and laterals for the year 2026-27
Removal of Silt .and Jungle Clearance from Ch 0.000 to 6.210 km of Dy-13 of SBC
Restoration of CC lining at Ch 5.800 km ( On SR Side, at DPO-17) of Dy-12B of SBC
Removal of jungle & silt from ch.0.00 km to 1.67 km of Lat-8 of Dy-19 of SBC.
Removing of jungle and silt from ch 0.00 to 4.00 Km of Dy no.20 of SBC and Scour Fillings from ch 65.00 to 67.00 Km of SBC Main Canal ( In Selected Reaches)