Loading…
Loading…
6,422 results • Latest
Construction of road from Gareeb Shah Morh to Aziz Shah Mohalla Masjid to ward No 05 Mubarakpura
Construction of link road from Kangerkas to Manda Drerari (1km) Panchayat Derari
Construction of road from Saral Khankri to Tulfara ward No 02 Pyt. Tunditrar
Construction of Additional room and Lavotry at Niabat office Manjakote.
Repair/Renovation of Tehsil Social Welfare Office Rajouri
Construction of link road from main road Manjakote to Haji Shafi Mohalla
Construction of road from Rachwa Mandir to Nadyala Hajam Mohalla ward No 01 Panchayat Nadyala
Construction/ Upgradation of road from main road MI Academy to Ashfaq Mohalla via Bashir Lodhi Mohallah ward No 05 Panchayat Dhanore Jarallan
Construction of road from main road Thrati Bagla to Kayala Challas High School via Lower Khanarian
Fencing Using PCC Sq. Post with 7 Strands of GI-BW with every pole concrete alongwith Plantation and DRSM including BUC for three years in Co. 40/D Channi, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA)
Fencing Using PCC Sq. Post with 7 Strands of GI-BW with every pole concrete alongwith Plantation including BUC for three years in Co. 48/D Marcholla, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA)
Fencing Using PCC Sq. Post with 7 Strands of GI-BW with every pole concrete alongwith Plantation and DRSM including BUC for three years in Co. 128/D Kangri, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA)
Fencing Using PCC Sq. Post with 7 Strands of GI-BW with every pole concrete alongwith Plantation and DRSM including BUC for three years in Co. 128/D Kuldabbi, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA)
SPARES FOR FARM TRACTOR ESCORT 6065 EM NO 15ZK
Planting of 8750 nos. of Polybagged plants (BUC) at 11 Nos. of different locations/closures already established during 2024-25 under CAMPA (ACA) in Sunderbani Range
DRSM work (136 cum) in Co. 52/N at Nagar Van Gania under Nagar Van Yojana during the year 2026-27
Procurement and Planting of different species of plants in Co. 52/N Nagar Van Gania under Nagar Van Yojana during the year 2026-27
Construction of Forest Check Post at RahSiot in Sunderbani Range UNDER CAPEX 2026-27
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings including BUC for three years, in Co. 85/N Lam, Nowshera Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings including BUC for three years, in Co. 85/N Lam, Nowshera Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings and DRSM including BUC for three years, in Co. 14/D Kalikassi, Lamberi Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings including BUC for three years, in Co. 54/N, Bhawani, Nowshera Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings including BUC for three years, in Co. 32/D Badanoo, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings including BUC for three years, in Co. 31/D, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings and Patch Sowing including BUC for three years, in Co. 44/D Channi, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings and Patch Sowing including BUC for three years, in Co. 44/D Channi, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings including BUC for three years, in Co. 45/D Thandapani, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Fencing Using PCC Square Post with 4 Strands of BA-BW alongwith Plantation of saplings including BUC for three years in Co. 57/N Manglamata, Nowshera Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Fencing Using PCC Square Post with 4 Strands of BA-BW alongwith Plantation of saplings including BUC for three years in Co. 45/D Thandapani, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
Fencing Using PCC Square Post with 4 Strands of BA-BW alongwith Plantation of saplings including BUC for three years in Co. 68/N Handan, Nowshera Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
PLS REFER NIT
Target Paper, Target Sheet, Head Gear for fd firirng, 1 Inch Nails, 2 Inch Nails, Rope, Wall Fan, Revolving Chair, RTC Ledger, HP Laser Jet Printer, Scan Jet Pro 3000 S4
Construction of Protection wall and Restoration of Essential Services at DKG
0003383629 Ball Socket Head Assembly
Compound wall of PHC Thanamandi with main Gate
500 LPH RO Plant (RO+ UV+ TDS Infuser+ PSS) with accessories and base installation
SPARES FOR MARUTI GYPSY 413 KIG BA NO 13B 14700 OF
Repair of Scorpio Veh BA No 25B 143507W, Complete Overhauling of Rotary Pump BA No 18C 107240L, Repair of Injector Assy with Replacement of Injector Nozzle Veh BA No 18C 107240L
procurement of different kind of MT spares
Vane Pump Assy, Shackle Pin Front, Shackle Pin Rear, U Bolt Front, U Bolt Rear, Lock Pin, Nipple Grease, Washer Seal
Parts Washer, Air Blow Gun, Brake Bleeder Kit, Brake Calliper Tool, Air Wrench Ratchet 3 by 4, Air Wrench Ratchet 1 by 2, Air Wrench Ratchet 2 by 3, Transmission Jack Hydraulic, Digital Battery Tester, LED Light, Automative Repair tools, Work Light, Emergency light protection, Rechargable LED work light, Air Machine, Thota Plier, Locking Plier, Screw driver bit, Vice
Refurbishment of BP Glass of 2.5 Ton
Conduct of Junior T-20 League Cricket Tournament under 16 years