Loading…
Loading…
1,286 results • Latest
Estimate for Construction of Toilet(for Mech Staff) at Pump house PD-1 at KM. 2.830 of Pranpura Disty.
Estimate for Construction of Toilet(for Mech Staff) at Pump house JC-6 at KM. 49.000 of Main JLN Canal.
Estimate for internal clearance of Sump of JC-3 Pump House at Km. 33.350 ofJLN Canal.
Catching of Monkeys in limit of Municipal Council Rewari
Custom Bid for Services - Office Assistant at rewari territory office Similar Category Manpower Outsourcing Services - Minimum wage
Thin White Topping (TWT) for one time improvement of Rewari-Narnaul road NH-11 from KM 6.200 to 13.190 and 18.25 to 19.55 (Left out portion of village Khori) in Rewari District.
Operation and maintenance of existing toilets at various locations in Municipal Committee, Dharuhera. (For the year 2026-27)
Rough Cost Estimate for Development works of new replanned pocket in Phase-II , Sector-1, at Water Works Naranul
Providing and filling of good earth in low lying proposed parks in EWS Sites in Sector-18 Rewari
Providing and filling of good earth in low lying proposed parks in EWS Sites in Sector-19 Rewari
Custom Bid for Services - Rate Contract for Supply of Hygiene and Sanitation Items Similar Category Healthcare Sanitation Service Cleaning, Sanitation and Disinfection Service - Outcome Based
Estimate for connected 300 mm dia C.I pipeline for village Pond Mamaria Assampur from Nagla Disty. at RD K.M 8.500/L.
Const. Of Sub Health Center At Village Asiaki Gorawas Block Jatusana
Construction of link road from Lisan to Gothra tappa dahina at village Lisan Block Dahina District Rewari (HGVY)
Rough cost estimate for construction of boosting station in MTS Kosli Rewari
Construction of Firni at village Subasehri(Bhagwanpur) Block Bawal Rewari
CONSTRUCTION OF IPB RASTA JAITHPUR SEKHPUR TO KARAWRA MANAKPUR AT VILL JAITHPUR SEKHPUR BLOCK REWARI
Annual Repair of link road in Bawal Constituency, District- Rewari for the financial year 2026-27, G-I(Road ID- 3314, 3322, 3327, 3331, 3333, 3334, 8095, 8672, 8801, 5184, 6037, 6823, 8493)
Stationary Valve Regulated Lead Acid Batteries (V3)
All in One PC (V2) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2)
Const. of foot path of H no. 740 to 714 to 1205 to 1222 and 1211 to 1191 and 1194 to 1266 and 1331 to 1343 and h/o 1244 to 1234 and 1055 to 1456 to 1091 to 1410 to 1087 to 1125 to 1133 to 1344 to 1177 to 1157 to 1362 to 1390 to 1393 to 1169 in w no.
Annual maintenance estimate of Roads, Water Supply, Sewerage and SWD Scheme in Sector 9A,10and 11P Mahendergarh for the year 2025-26
Annual maintenance estimate of Water supply and Sewerage Scheme in Sector-3, Rewari for the year 2026-27
Annual maintenance estimate of Roads, Water Supply, Seweraage and Storm water drainage Scheme in Sector-19, Rewari for the year 2026-2027
Annual maintenance estimate of Master Water Supply Rewari for the year 2025-26
Annual Maintanence Shopping Centre Sector 5 Rewari
Annual Maintenance of of Staff Quarter U/E Rewari.
Annual maintenance estimate of Water supply and Sewerage Scheme in Sector-3, Rewari for the year 2026-27
Annual Maintenance of Road, Water Supply, Sewerage and SWD Scheme in Sector 18 Rewari 2026-27
Annual maintenance estimate of Roads, Water Supply, Sewerage Scheme in M.T.S Kosli for the year 2025-2026
Annual maintenance estimate of Master road in U/E Mahendergarh for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Infantometer under POSHAN Abhiyaan (Q2), Stadiometer under POSHAN Abhiyaan (Q2), Weighing Scale (Infant) under POSHAN Abhiyaan (Q2), Digital Weighing Scale (Mother & Child) under POSHAN Abhiyaan (Q2) (3 (3 ))
Protection of earthen bunds by providing and placing of bags filled with fresh earth in Phase-IV at IMT Bawal.
Providing and laying of HDPE pipes for diverting of stagnated water towards HSIIDC vacant land at IMT Bawal.
CONSTRUCTION OF IPB STREET FROM H/O SUBHASH TO H/O BODAN AT VILL CHURIAWAS, BLOCK REWARI HGVY
Servicing and repairing of different capacity DEA sets and Misc Electrical Works in various TE and BTS Sites for area of DET Rewari under BA Rewari
Internal Clearance of Dewana Dy. and its sump from Km 27.474 to 32.600 for Kharif 2026
Internal Clearance of Nangla Minor from K.M. 0.000 to 4.755 (Tail) for Kharif 2026
LED Batten Light (LEDTube Light) (V2) (Q2)
Internal Clearance of Basduda Dity from K.M. 0.000 to 3.454 for Kharif 2026.
Internal Clerance of Dewana Disty. From K.M. 23.375(P.H DD5) to 27.474 (P.H. DD6) for Kharif 2026.
Construction of VR Bridge at Km. 10.366 of Rajiaka Disty
Patch Work in Zone I Ward No 1 23 24 25 26 27 28 29 30 31 32 As Per Wardbandi 2026 MC Rewari
Const. Street with 80 mm thick IP blocks from H/o Mansa Jaat to Jaat Chaupal and H/o Jaipal Foji to Phool Singh Chowk in Ward no 3 Municipal Committee Bawal.
Construction of link road from Bangarwa to Jadra (Bhotwas Ahir) Block Dahina(HGVY)
Const. of CC Road from H/o Basti Lala ji to H/o Kuldeep in Ward no 6 Municpal Committee Bawal.