Loading…
Loading…
2,748 results • Latest
Various Instrument Items
90mm quick coupled polyethylene pipe (HDPE Pipe) & fitting sets conforming to IS 17425: 2020
110 mm quick coupled polyethylene pipe (HDPE Pipe) & fitting sets conforming to IS 17425: 2020
Unplasticized Polyvinyl Chloride (PVC - U) Screen and Casing Pipes for Bore/Tubewells (V2) as per IS 12818 (Q2) ( ( 3 3 ))
Unplasticized Polyvinyl Chloride (PVC - U) Screen and Casing Pipes for Bore/Tubewells (V2) as per IS 12818 (Q2) ( ( 3 3 ))
Unplasticized Polyvinyl Chloride (PVC - U) Screen and Casing Pipes for Bore/Tubewells (V2) as per IS 12818 (Q2) ( ( 3 3 ))
Gram rankhandi gulaal patti mein omprakash ke makaan se charan singh son of trilok singh ke makaan tak cc road and naali nirmaan karya
Gram rankhandi chajju patti ke kali mata mandir se sunil Sharma ke makan tak 2 sahayak gali sahit cc road and naali nirmaan karya
CWE/AF AMB/SAR-T08/2026-27 INSTALLATION OF RUNWAY LIGHT FITTINGS AND OTHER CONNECTED ITEMS AT OVER RUN AREA OF UNDERSHOOT 27 END AND UNDERSHOOT 09 END AT AF STN SARSAWA UNDER GE AF SARSAWA
SPLIT AC 1.5 TON FOR OFFICE USE
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Road repair work using cement concrete CC is being carried out at various locations including near Super Dairy and the gas godown on Gas Godown Road Ward 54 near Aman General Store and Chand Medical Store and near the graveyard.
Construction of RCC drain from Ward No. 11 Kheda Khurd graveyard to Ruhade via Shalim house and from Aslam house towards Murkaram house
Construction of CC road and drain from Shabbir Hasan house to Abdul Gaffur house in Ward No. 11 Mavikala.
PVC Socket 160 mm dia (Fabricated 4kg/cm2 class-II), PVC Socket 200 mm dia (Fabricated 4kg/cm2 class-II), PVC Tee 160X160X160 mm dia (Injection moulded 4kg/cm2 class-II 6kg/cm2 class-II & class-III), PVC Tee 200X160X200mm dia (Fabricated 4kg/cm2 class-II), PVC Tee 160X200X160mm dia (Fabricated 4kg/cm2 class-II), PVC Tee 200X200X200mm dia (Fabricated 4kg/cm2 class-II), PVC Bend 160 mm dia X45° (Fabricated/Moulded 4kg/cm2 class- II), PVC Bend 160 mm dia X60° (Fabricated/Moulded 4kg/cm2 class-II), PVC Bend 160 mm dia X90° (Fabricated Moulded 4kg/cm2 class-II), PVC Bend 200 mm dia X45° (Fabricated/Moulded 4kg/cm2 class-II), PVC Bend 200 mm dia X60° (Fabricated/Moulded 4kg/cm2 class-II), PVC Bend 200 mm dia X90° (Fabricated/Moulded 4kg/cm2 class-II), PVC Reducer 200X160 mm dia (Fabricated 4kg/cm2 class-II), PVC End Cap 160mm dia (Injection Moulded 6kg/cm2 class-III), PVC End Cap 200mm dia (Injection Moulded 6kg/cm2 class-III), PVC FTP with Flange 160mm dia (Fabricated 4kg/cm2 class-II), PVC FTP with Flange 200mm dia (Fabricated 4kg/cm2 class-II), Solvent Cement, Two Way uPVC Outlet Valve
Work on laying interlocking tiles on both sides from Sharad Medical Store to Asha Modern in Ward 55 Mission Compound
Tentage work in Nagar Nigam Saharanpur Programme
Welding Electrode Drying Portable Oven
Repair and Overhauling Service - Repair and Over Hauling Services of 01 x Maruti Gypsy; Repair and Over Hauling Services of 01 x Maruti Gypsy; Yes; Buyer Premises
CERTAIN REPAIR/MAINT OF MISC E/M, WATER SUPPLY AND SUMMER/COOLING APPLIANCES OF SAHARANPUR UNDER GE ROORKEE
Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Fully strengthen the air heater plates and conduct a satisfactory trial; Buyer, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling the old air heater tubes of Boiler No 01 size 63 5 mm OD x 2 64 mm thickness fabricating and errecting new tubes in accordance with the dra.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling the old air heater tubes of Boiler No 02 size 63 5 mm OD x 2 64 mm thickness fabricating and errecting new tubes in accordance with the dra.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling the old air heater tubes of Boiler No 03 size 63 5 mm OD x 2 64 mm thickness fabricating and errecting new tubes in accordance with the dra.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc B Manufacturing and installing new columns beam channels; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to Twenty HP; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the old corroded platform and replacing it with a new one; Buyer
A RUNNIG CONTRACT FOR THE DIPOSIT SCHEEM 33 KV LINE SHIFTING TOWN OF EDD NAKUR
A running contract for the smooth operation of the electricity distribution system within the jurisdiction of the Electricity Distribution Division, Nakud (Saharanpur) covering IPDS towns (Nakud, Ambehta, Titaron) and the RAPDRP town (Gangoh)
Industry Unit; Creating the melter from the Satvik Sulfur Furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil; Buyer, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the worn out coils in the melters of the Satvik Sulfur Furnace replacing them with new ones and conducting hydraulic testing and giving a sat.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a sati.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Renovate and install a new SO2 chamber inside the coolers of the Satvik Sulfur Furnace and conduct a trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the old corroded SO2 gas line at the sulfur furnace station and install the new seamless MS line with flanges tightening the joints and bolts;.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the grooved plate of the filtrate tank located below the vacuum filter install the plate provided and perform a trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Repairing the weak parts of juice and mud with dry box of clarifier and making all the connections; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom a.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the SO2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm MS plate and making all .., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cut out and remove all rotten mud scrapers inside the door clarifier and install the provided plates and belts according to size and give a satisfacto.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Coat and remove the weak mud boot plates in each compartment of the clarifier and install the provided new plates; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting out all the worn out weak cooling pipes and flanges of the coolers of the Satvik Sulphur Furnace and installing new flanges and cooling pipes usi.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting out the worn out weak flanges of the coolers of the Sulphur Furnace and installing new flanges using the provided plate and giving it a satisfact.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the weak corroded cross in the gas pipeline at the Sulphur Furnace Station and install the cross by making a new flange from the provided .., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the weak corroded header of the Sulphur Furnace and install it from the provided plate and pipeline and connect the nipples and give a sat.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repairing the bagasse line leading to the mill installed above the vacuum filter station in the boiling house and conducting a satisfactory trial; Buy.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the brass SS tubes from the quad and store them; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Install the new brass SS tubes provided by the mill committee in the calandria expand them and conduct hydraulic testing of the calandria at a pressu.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the old corroded platform and replacing it with a new one; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial; Buyer
HONEY PROCESSING UNIT
new angles channels; Buyer, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting out the worn spots of the pan umbrella and strengthening it with a new channel and angle; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Patching the old and worn plates at various locations with the provided new plates; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the corroded bottom and top platforms of the pan and making new ones from the provided plates and strengthening the associated structure; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing a 20 22 manhole with blind at the pan floor; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Refurbish the corroded side plates of the molasses conditioner locatedby bending them with the new plates provided and replace the corroded bottom angle.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repair the neck and damaged shaft and arm of the crystallizer; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the worm wheel of the crystallizer make a bed for the new planetary gear box provided adjust the shaft and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Strengthening the weak side covers and weak cells of the crystallizers by using the provided channel and angle supports; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the corroded plates of the pan floor installed syrup malt A light A heavy B heavy C light C1 heavy tanks and installing them from the.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the neck and damaged parts of the vacuum crystallizer shell and installing a new one from the provided 10 12 mm plate and welding the relevant cu.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle fabricate erect a 900 mm band and give a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle fabricate erect an 1100 mm band and give a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting off the taper angle on the weak caladria of the pan and fitting the provided new 10 12 mm plate by bending it and giving a satisfactory trial; Buy.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting off the weak sloping bottom half and side plates of the air cooled crystallizer and fitting the provided new 6 8 mm plate by bending it and giving.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the weak corroded steam jacket of the calandria of the pan and installing the provided plate 8 10 mm by bending it and testing the hydrolink and .., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak corroded ducting plates of the sugar hopper and making new ducting plates from the provided 3 mm plates and installing them .., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Replace the broken part of the Rody Melter arm and give a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Make the hopper trough using the provided plate strengthen it with an angle and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the faulty Trajet heater on the continuous machines installing a new one and conducting a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; The hopper 1 5 m x 1 5 m trough was renovated by riveting a 5 mm plate with a 10 mm plate and given a trial by installing a connecting rod; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; The cover of the Conti machines was renovated using an 8 10 mm plate installed in place and given a satisfactory trial by welding; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Replace the side plates of the A B heavy run off tank with new 6 8 mm plates and replace the bottom plate with a new 10 mm plate make connections e.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Replacing the weak side plate bottom of the Magma Mixer under, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To dismantle old weak round and square tanks vessels of A light C light B heavy and prepare them from the provided 8 10 mm plate and give satisfactory t..
Facility Management Services - LumpSum Based - Industrial; AMC OF MISC APPLICATION SORFTWARE; Consumables to be provided by buyer
Systems/Equipments (Version 2) - Industry Unit; To replace the reflector plate of the fibrizer and give a satisfactory trial; Buyer, Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged side plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfactor.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged bottom plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfact.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To make and errect the guide of SRC and IRC as per the given sample and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To make runner boxes of SRC and IRC and give satisfactory trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To do the work of fitting the liner of the given SS plate at the bottom of SRC and IRC and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To fabricate boots using 8 10 mm MS plates provided by SRC and IRC and to conduct a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Carry out strengthening work using the channels and angles provided by SRC and IRC and conduct a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To fabricate the weak sloppy plates of the Donali suit fitted on Milo from the given MS plate as per the drawing and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the worn out TRPF cover fitted on the mill and making and fitting a new cover using the plate given as per the drawing sample and giving a satis.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To carry out the work of tipping the teeth of mill rollers and conduct a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To carry out the work of Chevron cutting as per requirement on mill rollers and give satisfactory trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Work involving the errectation of broken teeth on the mill s pressure chute repair of worn out teeth via hard facing and conducting a satisfactory tria.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; dismantling the old pressure chute errected on the mill completely replacing the corroded section repairing and welding the damaged parts of the SS plate .., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabricate the juice tank for the mill house using the provided 6 8 mm plate and conduct a satisfactory trial run; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the bottom of the supply juice tank errecting a 12 mm plate in its place and conducting a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Manufacturing the bed for the S R C and I R C, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the worn out TRPF headstock side plate errect a 6mm plate in its place and conduct a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Fabricating teeth for the hydraulic grab replacing old or damaged teeth with new ones and conducting a satisfactory trial run; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the old corroded platform and replacing it with a new one; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 Inch and providing a satisfactory leak proof trial; Buyer
PATCH PANEL VCCS, EXTERNAL CABLES SET FOR VCCS
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500X720; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500X720; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500X720; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500X720; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500X720; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500X720; Local 24*7
Work of baricatingm watch tower for gogah mahadi manakmau at ward no. 31
Nickle Screen For W. K. 1501/30 Digree Centrifugal Machine Size 0.06 X 2.20 X 0.27 Mm In Six Segments ( 5 set ), Nickle Screen For WK 1500/30 Degree, Slot 0.05mm Hole Size (2.30mm X 0.27mm) Complete With Bottom St ( 9 set ), Nickle Screen For Sugar Max Make Centrifugal Machine 1500/30 Digree Size 0.06x2.20x0.27mm In Six Seg ( 10 set ), Nickle Screen NK-1503/30 Size 0.06mmx 2.20 Mmx 0.27mm (6 SEGMENT) Complete With Bottom Strips ( 5 set )
VEEDOLE ALICOM 20 LITHIUM COMPLEX GREASE/EQUIVOLENT PSU MAKE VEEDOLE
Handling and Transport on Lumpsum Basis - The loose bagasse heaps from the previous year lying near the boiler RBC shall be spread and dried for use in the boiler The bagasse shall be brought near the RBC using our own resources and fed into the RBC .., Handling and Transport on Lumpsum Basis - For the Crushing Season 2026 27 the bagasse coming out from the carrier and the excess bagasse below the bagasse carrier shall be collected at the bagasse yard and shall be stacked and fed as required
Electronic Weigh Bridge (Without Civil Work) (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Aluminium Lagging Works; Service Provider
Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2), SFU 100 Amps, Cross linked polyethlene XLPE insulated PVC inner sheated armed cable with aluminium conductor 3.5x120sqmm, Moulded case circuit breaker with adjustable thermal magnatic trip unit four pole 125Amps breaking capacity 16KA, Condensor for ceiling fan 2.5MFD, Geyser heating element 1.5KW tringle base with ISI marked, PVC insulated or sheated weather proof aluminium cable with conductor 1100volt twin core 6.0sqmm
A4 and Legal Size Multifunction Printer (MFP) (Q2)
Lead Acid Storage Batteries For Motor Vehicles with Light Weight and High Cranking Performance (V2) Conforming to IS 14257 (Q3) (3 (3 ))
AS PER BOQ
AS PER BOQ
AS PER BOQ
AS PER BOQ
AS PER BOQ