Loading…
Loading…
3,608 results • Recent activity
MTPS I Mill Plant AC Plant Unit I AOH 2025 26 Air Washer System Epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows W type eliminator chemical cleaning Overhauling the AWCW Pumps
MTPSI TM Unit I Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2025 26
MTPS I TM UNIT I Complete Overhauling of HP Bypass LP Bypass Spray Valves Oil Supply Unit during AOH 2025 2026
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS RHS of condenser tubes in Unit I condenser during AOH of 2025 26
MTPS I TM Unit I Removal and Reinsulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
MTPS I CHP I Removing wornout damaged rails dismantling the PSC concrete sleepers with fittings removing coal powder on the track line providing bed PCC mix WT V inhaul