Loading…
Loading…
3,470 results • Recent activity
MTPS 1 BM Unit II AOH 2025 26 Application of hard setting sealing compound of Eromat 1003 on the erosion prone area of the Air Pre Heater outlet Flue gas duct both A and B sides
MTPS I M I CA CWS I Overhauling of sludge disposal pump and Cold and hot water tunnel vent valves Air Vent valves etc
MTPS I BM UNIT II Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of worn out buck stay pin Fabrication of buck stay cover plate etc
MTPS I BM Unit II Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I BM Unit II Boiler pressure parts AOH 2025 Dismantling cleaning and rectification of defective seal trough seal plates SS woven wire mesh providing patch plate
MTPS I BM Unit II Boiler Pressure parts AOH 2025 Maintenance of boiler drum and all safety valves and allied works