Loading…
Loading…
3,470 results • Recent activity
LADLE WELL FILLER (ZIRCON BASE)
High Carbon Ferro Chrome
MTPS I BM Unit IV Boiler pressure parts Replacement of most overheated Hot Reheat coil rear side bend in Boiler inter pass area Circuit No 29 to 48
MTPS I BM Unit IV Boiler Pressure parts AOH 2025 Overhauling of HP LP valves and replacement of defective valves
MTPS 1 BM Unit IV Inspection/Renewal of Guide bearing in Air pre Heater A B sides dismantling cleaning inspection and reassembling of air seal assembly etc and other related works during AOH 2025 2026
MTPS I BM Unit IV AOH 2025 2026 Cutting Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A and B sides