Loading…
Loading…
3,475 results • Recent activity
MTPS 1 Mill Plant AC Plant Overhauling load testing and re commissioning of 3 Ton capacity EOT crane and load testing of electrical hoist 1 Ton capacity in Air washer system unit 1 to unit 4
Supply of variable load Hanger Assembly in Critical steam pipe liners in Boiler Area of unit-III and IV
MTPS I Mill Plant Unit I Applying two layers ceramic wear coat Eromat at mill outlet elbow released from Unit I during Annual overhaul 2025 26
MTPS I Mill Plant Unit I Clearing the Mill rejects from Unit I and II Mill Feeder area weighing in departmental weighbridge and transporting to reject yard G switch yard area coal yard by using contractors vehicle and unloading the same and return
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and wornout coal nozzles fixing of divider plates and allied works
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle