Loading…
Loading…
2,767 results • Recent activity
Construction of foot bridge in Km. 137 and CTRB a Km. 139 on Takari Main Canal, Construction of Embankment work In Km. 136 and Km. 138 of Takari Main Canal and Construction of Balance Lining at Km.139 (40 m length) of Takari Main Canal.
Construction of Bituminous Road from Takari Pump House Stage 3 to Delivery Chamber And Approach road from Takari Stage 4 to Main D.C.
Supply, Installation, Commissioning of D [Supply, Installation, Commissioning of Digital clock double face platform type GPS Synchronized with RED LED (Stand Alone Mode) as per RDSO Specification RDSO/SPN/TC/62/2008 Revision 4.1 or latest.]
Solar Based Home Systems (Solar Power Packs): AC Models as per MNRE Specifications (Q3) (3 (3 ))
Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3)
12 Watt White-LED Based Solar Street Lighting System As Per MNRE Specification (Q3)