Loading…
Loading…
5,286 results • Latest
Restoration work of 22 KV HT Line damaged due to heavy Rain/ land sliding at Noti Khad (Chaba 1 and Chaba 2 Double Ckt under Electrical Sub-Division HPSEBL Sunni
Restoration work of 22 KV HT Line damaged due to heavy Rain/ land sliding at Noti Khad (Kadharghat and Old Sunni Feeder under Electrical Sub-Division HPSEBL, Sunni and Jalog
SH Addition alteration to top floor for providing accommodation to HPBSMDA and Divisional Manager Shimla office including roofing in open area etc
Construction of R/Wall at Rd. 0/00 to 0/015).
Entryand Mid Level Desktop Computer (Q2)
P/F Polycarbonate sheet in Roadside of Type-V and Type- VI Qtrs , Type- IV set no. 18 under Kasumpti Section
Estimate for Removal of slip behind 22KV New bay for Interconnection of 43 Bn ITBP Police Kalna due to water leakage by providing wire crate wall etc.
Remvoal of slips/Roads side muck on Sadhora to Mohanpur road in km. 0/00 to 6/525,Mohanpur nala to kiar koti road in km. 0/00 to 2/00 and mashobra to Cariganano road in km. 0/00 to 4/00, Baldeyan to Shanal road in km. 0/00 to 4/720
Providing and laying of OPGW cable from Ganvi Power House Stage-I to Forbay GPH-I and Ganvi PH-II to Rungcha (Dam Site) under Ganvi Power House Division, HPSEBL, Jeori.
Construction of R/wall between RD. 4/315 to 4/360)(Balance work
O and M of Ganvi Power House Stage 1.
Construction of Cupboards, P/F panelling , P/F AI Windows , PVC Flooring in various rooms in Directorate of Health Services Block No.- 5 , SDA Complex under Parimahal Section
Providing cook cum chowkidar for handle cooking, cleaning duties and watch and ward of Rest house NOGLI w.e.f. 01.04.2026 to 31.03.2027 ( 365 days)
Providing cook cum chowkidar for handle cooking, cleaning duties and watch and ward of Rest house Ganvi w.e.f. 01.04.2026 to 31.03.2027 ( 365 days)
Temporary diversion of water of Nogli khad into Power House water conductor system (Open Channel) w.e.f.10.04.2026 to 31.07.2026 (112days).
P/F Cupboard in Type II set no. 628,630, Type-1, 219 and white washing and distempering in various sets due/ vacation under Kasumpti Sub- Division
Gardening and watering of plants and Flower pots, complex of 2.5 MW Nogli Power House uprooting the grass from Power House Sub-Div work shop office complex and Sweeping and Cleaning in side of Power House Machine Hall, Mechanical Room, Fore Man Roo
A/R and M/O various residential Qtrs under Division No.-VIII Kasumpti Shimla-3. (SH Exterior w w /distempering and painting in Type-VI Set no. 12 and white washing/distempering in other sets on due/vacation under Kasumpti Sub- Division).
HPSEBL/GPHD/DB-9/2026-27-45
Providing and fixing of Insulation Mat Class A, Class B - Blue and Orange for Control Room, LT Room, Machine Hall of 2x11.25MW Ganvi Power House Stage 1.
Removal of Slips (i) Eversunny to Golcha Bhont road km.0/00 to 6/270 (ii) Eversunny to Pagog road km. 0/00 to 5/00) (Excluding GST
Supply of Mineral Turpentine Oil (MT Oil) for power house under Ganvi Power House Division, HPSEBL, Jeori
Construction of R/Wall between Rd 0/450 to 0/465
C/O R/Wall at Rd 4/295 to 4/310
Maintaining/Observation of Water Level at Forebay of Ganvi Power House Stage 1 round the clock and conveying the same to intake and control room of Ganvi Power House Stage 1 and cleaning of trash rack at Forebay wef 01.08.2026 to30.11.2026 (122 days)
Repair of Store Shutter Shed No.2, Weighing all the scrap and providing steel gate for fencing of the divisional store at Kotla
A/R and M/O of Road from Koti to Mundaghat via Moi Jubber Km 0/00 to 5/130 2. A/R and M/O of Road from Koti to Padechi. Km 0/00 to 7/080
Restoration of R R masonary wall RD 20.00 to 40.00m upstream of right side guide wall of trench weir damaged/ washed away during the month of 08/2025.
Periodic Maintenance of Earthern Shoulder, Drain , Culvert, Sign Board, 200 meter stone, Kilometer stone and White Washing of Parapets in Km RD 12/375 to 22/375
C/O Hill cutting and removal of earth between km. 1/360 to 1/500 and up lift of protection wall km.1/502 in wire crate near Via duct pier of NHAI (BALANCE WORK) (Excluding GST
Restoration of damaged river side protection wall of 2x11.25MW Ganvi-I d/s of left abutment of bailley bridge RD 25.00 to 50.00m by c/o cement concrete wall which was damaged due to heavy flood in Ganvi khad on dated 13.08.2025. under Ganvi Power H
Short Term Cab & Taxi Hiring Services - SUV; Outstation 24*7; 250Kms x 8Hrs
A/R and M/O on Providing staff for maintenance of Shoghi Mehli Junga Sadhupul road in Km 12/375 to 48/925 under Junga Sub-Division
O and M of Ganvi Power House Stage 2
C/o retaining wall RD 0.00m to 18.00m for the protection of high mask light structure at Ganvi stage-II intake damaged due to heavy flood in Ganvi khad on on dated 13.08.2025 . under Ganvi Power House Division HPSEBL Jeori.
Construction of R/Wall between Rd 0/700 to 0/719
Flooringfor GYM (V2) (Q3)
Providing services of Inspection Vehicle along with driver etc. complete for Sub Division-IV Office, CPWD, Shimla during 2026-27. CH to:- Construction of building for Regional Research Institute of Homeopathy at Shimla including development of site & internal electrical installations work.
P/FMS Jafri and polycarbonate in Type-V and VI at Kasumpti Shimla.) (Excluding GST
Hiring of Crawler Mounted Hydraulic vath Be Excavator Operating Weight 20 22 Tonnes With Bucket Capacity not less than 1.10 Cum for Removal of Formation Deficiencies including Cutting
Removal of slips and landslides at various reaches
C/o Bailey Bridge over Marathu Khad on Link road to village Lohat, Supplying and erection of 33.54 mtr span DSR Bailey Bridge at site over Marathu Khad on Link road to Village Lohat
Tender for comprehensive construction of ADSS OFC, including Supply and installation of related ADSS OFC accessories, supply and erection of 7m/8m tubular poles along with associated accessories, slinging of ADSS Cable, testing and commissioning
SH C.O R.wall from Km. 0.420 to 0.445
SH C.O R.wall from Km. 0.315 to 0.340
SH Painting, Distempering, wall ceiling and flooring etc. in Mortuary Hall and Dr s residence
Tender for comprehensive construction of ADSS OFC, including Supply and installation of related ADSS OFC accessories, supply and erection of 7m/8m tubular poles along with associated accessories, slinging of ADSS Cable, testing and commissioning
MOEI, Replacement of lamps and tubes, Fire Alarm System, EPBAX and RMO pump set & DG Set at Grand Hotel Shimla (H.P.) (SH:- Annual Comprehensive Maintenance of Digital EPBAX System) Subwork/Packages: MOEI, Replacement of lamps and tubes, Fire Alarm System, EPBAX and RMO pump set & DG set at Grand Hotel Shimla (H.P.) (SH:- Annual Comprehensive Maintenance of Digital EPBAX Systme)
Manpower Outsourcing Services - Minimum wage - Unskilled; Middle School; Admin
RCC storage tank 15000 lts cap, C/o RCC Intake chamber and providing L J of GI pipes of various Dia