Dark Fiber Lease Service - Point to Point Based - Dry Lease; Single Mode; Intracity; 1; Aerial; NA; NA
construction of retaining wall with toe wall at Rd. km. 3/210 to 3/221
Restoration of approach road to Ganvi stage-II intake near Mangloo Bazar RD 0.00 to 12.00m by c/o PCC wall which was damaged due heavy rain during 08/2025
R/R Damages on link Road to Reot Km 0/00 to 2/225 C/o R/wall at RD 1/380 to 1/402.5
C/O Room and Bath room in Windsor cottage set No.5 P/F Cup Board in cottage. (Under Kasumpti Sub - Division
R/R Damages on Link to Reot Road in K.M. 0/00 to 2/225, C/o , B/Wall and R/Wall B/w various damages and sliding RDs b/w 1/00 to 2/225
R/R Damages on link Road to Reot Km 0/00 to 2/225 C/o R/wall at RD 0/915 to 0/930
C/O R/Wall between R.D. 0/841 to 0/858 under Mehli Section
Restoration of damaged river side protection wall of 2x11.25MW Ganvi - I u/s of left abutment of Bailey Bridge RD 0/11 to 15.00m by c/o cement cocrete wall which was damaged due to flood in Ganvi Khad on dated 13.08.2025.
Providing services of Light Motor Petrol inspection vehicle at Shimla Sub Division-I & Shimla Divsion-I Office of CPWD Shimla. Ch to: 2059PW. Subwork/Packages: Providing services of Light Motor Petrol inspection vehicle at Shimla Sub Division-I & Shimla Divisioin-I Office of CPWD Shimla. Ch to: 2059 PW.
Providing staff for maintenance of various residential GAD Qtrs under Mehli section.) (w.e.f. 01.05.2026 to 30.10.2026). For the year 2026.2027
Providing staff for maintenance of various residential GAD Qtrs under Kasumpti section.) (w.e.f. 01.05.2026 to 30.10.2026). For the year 2026.2027
R R Damages on Theog Kotkhai Hatkoti road NH 705 k.m. 0.000 to 69.000 SH C.O Ramp at R.D 24.550 to 24.561
C O Khabbal to Tikkari road KM 0 00 to 1 630 SH F C 5 7 mtr wide road at RD 0 00 to 1 375
R R damages on link road Bagi to Khabbal road km RD 0 0 to 10 00 SH C O W Wall of CD at RD 6 985 6 992 Catchpit of CD at RD 6 994 B Wall at RD 6 985 8 00 R Wall at RD 6 495 6 510 C O R Wall in R R stone Masonary cm 1 6 at RD 6 510 6 520 9
Maintenance of Shimla Bye Pass rd 13.00 to 24 250 SH CO of wing wall slab culvert at rd 19.380 to 19.395.
R R damages to bajnudhar kewaldhar mohanlal pariser km 0 00 to 3 00 SH p L kharanja soling and Hpc at rd 2 410
Construction of road from shalawat to the House of Madnu Parshotam das summerkot Tehsil Rohru Distt Shimla km 000 to 700SH Co Rwall at Rd 000 to 0015 0400 to 0430 and Bwall at Rd 00050 to 0090
r r Damage to Jagothi Nallah anderwati road km 0 00 to 6 00 SH C o removal of slips at Rd 1 195 to 3 450
RR Jagothi Nallah Andhrewthi road km 00 600 SH CO 900mm HPC at RD 4920 and RWall at RD 4510 4530 0360 to 0375 and 1260 to1255 under pdna
Automatic Line Voltage Correctors (Step Type) for Domestic Use - IS - 8448 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6716705 Dated : 29-09-2025 Bid Document 1/15 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 101949 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6717136 Dated : 29-09-2025 Bid Document 1/21, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 519000 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 8160 Schedule 2 EMD Amount (In INR) 2220 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. 2/21 (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DGM (F&A) Njhps Sjvn Jhakri Hp 172201, SJVN Limited, SJVN Limited, Ministry of Power (Njhps Sjvn Jhakri)
R R to Jangla saribasa Thali Amboi road km 0 00 to 4 00 SH C o R wall at Rd 0 880 to 0 903 1 170 to 1 195 under PDNA
C o Sub Tehsil Building at Jangla Distt Shimla SH Co Building Portion WS SI Rain Water harvesting tank septic tank site development etc
Construction of ITI Building at Chirgaon Rohru Distt Shimla HP SH C O Bld. Portion WS and SI Rain water harvesting tank Septic Tank and Site Development etc
RR Damages to Badiyara Jitata road km 000 to 6000 SH CO RWall in stone masonary at RD 1220 to 1260
RR damage to JBadiyara kaloti dhumadhar
R R Damage to various road under Rohru Sub Division in Summerkot Section SH Hiring of JCb for removal of Snow slps and maintenance of road clearance of drain
R R Damage to machoti kanewra padanalla road km 0 00 to 8 500 Sh C o R wall at Rd 2 120 to 2 135
R R Damage to various road under Kansakoti Section Sub Division RohruSub Division Kansakotii Section SH Hiring of JCB for removal of Slips Snow maintenance of road surface drain etc
RR damages to kansakoti kutara Dalgaon road km 000 to 1500 sh- co Rwall in stone Masonary cm 16 at Rd 11918 to 11931 PDNA
Television (TV) (V2) (Q2)
R R Damage in Narkanda Baggi Khadrala Sungri Rohru Road Km 61 00 to 66 500 and Gujjar Kotha Jabralu Kutu road km 0 00 to 5 500 SH Removal of Slips at various Rd
R R Damage on Khadrala Khangteri road Km 0 00 to 3 500 Koftu Karala Pekhadhar road Km 0 00 to 4 00 SH Removal of Slips at various Rd
R R Damage in Narkanda Baggi Khadrala Sungri Rohru Road Km 0 00 to 67 00 Machoti Dhara Saras road KM 0 00 tp 0 400 SH Removal of Slips at various Rd
R R Damage to Mehandli Tikkar road km 0 00 to 28 00 SH C o R wall at Rd 15 350 to 15 395
R R damages on Sariadhar Bashuni Rohru road km 0 00 to 67 0 SH C O 900mm Dia Hume pipe culvert at RD 0 760 1 477 C O R Wall at RD 0 710 to 0 730 C O B Wall at RD 0 805 0 825
RR Damage on Koftu Karla PEkhadhar Bajashal road km 000 to 7500Sh ROFD Co 2 No 300 mtr span RCC Slab culvert 2700 2900
RR Damage to Narkanda Baggi Khadrala Sungri rohru road Km 0006700 SH CO BWall at RD 43 645 43 66036 77036 790 RWall at RD 49 990 50 015 39 900 39 920 40 280 40 300 35 100 35 130 36 730 36 735
C o Link road Harijan BAsti Kandrora G.P Khangteri km 0 00 to 2 00 SH F C 5 7 mtr wide road km 0 00 to 1 360
R R Damages to Machoti Saras road km RD 0 0 5 00 SH F c 5 7 mtr road at RD 1 185 to 3 300
SH Hiring of Air Compressor with Tractor for drilling of holes in stone boulders
RR Damage on mastot to baghi rd 000 to 1235 SH C0 Bwll at RD 0400 to 0440 0470 to 0515 0700 to 0745
RR Damage to Samoli Sanji Bhatwari road km 000 to 700 Sh Co Rwall in PCC 1 4 8 at Rd 2645 to 2675
RR Damages on Sainji Astani road km RD 000 to 400 SH CO RWall at RD 0110 0130 0570 0590 BWall at RD 0570 0590 and PCC 1 4 8 at RD 0180 0195 wire crate at RD 0130 0160 Removal of slips at RD 0130 0160
C O parking in front of Bekta Niwas Phase II in ward No 20 Dhalli
C O Damaged stairs path near block no C 22 23 SDA colony in ward no 29 Vikasnagar SH CO damaged stairs path along with tiles and railing work
Up gradation of drain road from NH 22 Jai Moti Bhawan RD 0 0 to 0 900 Ward no 23 Bhatta Kuffer SH P F MS Channel Gratting 0 40 to 0 165
R O rain damages road from Bhatta Kuffer to Chitranta Bauri in ward No.23 RD 0 00 to 0 960 SH C O R wall Rd 0 680 to 0 688 mtr
Maintenance on Shimla bye pass road K.M .13.000 to 24.250 Sh C.O R Wall between R.D 18.160 to 18.175