Loading…
Loading…
559 results • Latest
Develop. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Pragnapur Vill Design Ch82.000 to Tangad Palle Vill Design Ch160.000 for a Design L of 78.000 Km in the State of Telangana under NH(O) on HAM PKGII
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telangana under NH O on Hybrid Annuity Mode PKG I
Develop.of 6L UER2 NH 344 M NH1 Km0.700 to Dwarka Sec24 Road Km38.111 in Delhi n 4L RS NH344 N NH344 M Delhi at Km26.135 of NH344 M UERII till BHD byp of NH10 near BHD in HR pkgI 2 3 NH344M n 5 NH344N 2 call Works at RnC of EPC Contractor
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near Village Barahi) of NH-719 in Madhya Pradesh on Hybrid Annuity Mode (Package2).
Consultancy Services for preparation of DPR /Feasibility Report for new Mumbai-Pune greenfield expressway in the State of Maharashtra (Approx. Length 130 km)
Develop of 6L access controlled greenfield highway starting from Junction with NH60 at Adgaon km. 138.00 to Ahilyanagar km. 290.000 (Ahilyanagar Bypass pkg I)
Construction of 6L access controlled greenfield highway from Ahilyanagar km 290.000 to Hasapur km 512.000 (AHILYANAGAR BYPASS PKG 2)
Rectification of Black Spot locations of Chutupallu Ghati from Ch. 92.885 to Ch.97.920 and Charahi Ghati Section from Ch. 51.540 to Ch. 52.500 on NH33 (New NH20) under NH(O) on EPC mode in the State of Jharkhand