Loading…
Loading…
355 live236 closing this weekmost from Energy And Petro Chemicals Department Gujarat and Department Of Atomic Energy
355 results • Latest
LPP 2712G ASSEMBLY OF LONG TRAVEL BOGIE WITH WHEEL BEARING DRIVE SHAFT, LOCKING PIN FOR STAKER ( 2 set ), SLEWING DRIVE SHAFT UNIT ASSEMBLY FOR STACKER RECLAIMER OF COAL HANDLING PLANT OF 500MW UNIT NO 6 ( 2 set )
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-134G Inspection work of GERB make Vibration Isolation System (VIS) installed under ID Fan foundation (NDZV 47 S), Unit No 6, 500 MW, UKAI TPS (BMD-6); PW-134G Inspect..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5260G (TMD-6) Work of online routine preventive and breakdown maintenance of auxiliaries related to TG-set and Balance of Plant (BOP) of 500MW capacity Unit No 6 of U..
Industrial Safety Helmet (V3) ISImarkedto IS2925 (Q2)
Auma make limit switch model no. K210.225, Auma make Torque switch model no. K210.233, Auma make Actuator MODEL NO: SA100E90 analogous to COMM NO: 5122514007
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5253G Work contract for conduction of RLA (Remaining Life Assessment) of boiler pressure part and corrosion mapping of boiler tubes of 1x500 MW unit at Unit No 6, UTP..
Spare parts of Turnstile Gate as per Techncial Specification
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5255G The work of Repairing of Skin casing and miscellaneous work to arrest air ingress leakages in Boiler Unit No 3 4 & 5 at Ukai TPS BMD-2; As per Schedule B and sco..
Operation and Maintenance of all Pipeline Valve including M.S Pipeline and HDPE pipeline for the proper supply of water at all outlets required under the project and Maintenance of all records etc. under Extension of Under Ground Distribution Pipeline Network for Local Kotars and Chak at Various Villages of Mandvi and Mangrol Taluka in Command Area of Kakrapar-Gordha-Vad Lift Irrigation Scheme.
Restoration of Existing Checkdam Vareli-1 across Ver River near village Vareli,Ta. Mandvi, Dist. Surat.
Provision of Security Infrastructure including Security Cabin and Allied Facilities for Deployment of Security Personnel at Ver-II Irrigation Scheme (Amli Dam), Ta. Mandvi, Dist. Surat.
Provision of Security Infrastructure including Security Cabin and Allied Facilities for Deployment of Security Personnel at Lakhigam Irrigation Scheme , Ta. Mandvi, Dist. Surat.
Refilling of Industrial Gases in Cylinders - Refrigerant R-134 A Gas; Kilogram (KG)
Manpower Outsourcing Services - Minimum wage - Unskilled; Middle School; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Highly- Skilled; High School; Others
Material kit for Keltron make Inverter
Manual Metal Arc Welding (MMA) Machine (V3) (Q2)
Internal and External Painting of buildings in Anumala Township at Kakrapar Gujarat Site.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 132G Biennial rate contract for Preventive breakdown maintenance of Allen Bradley make PLC Based systems for Fly ash system installed at 210 MW Ukai TPS unit no 5 EMD..
Conductivity Analyser JUMO Cell 0.1 as per specification, Conductivity Analyser JUMO cell 0.01 as per specification.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-133G Work of Checking, servicing and verification of Durag make Opacity analyzer installed in 1X500 MW, Ukai TPS (C&I-6); PW-133G Work of Checking, servicing and veri..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-129G Work Contract for Repairing of defective EDLI Drum Level Control Electronic PCB Card of 1X500 MW Ukai TPS (C&I-6); PW-129G Work Contract for Repairing of defecti..
Distribution Transformer, 3 Phase, 11 kV, >200 KVA upto and Including 2500 KVA ISI Marked To IS 1180 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-124G TMD 6 Work of Re-babbitting and machining of old worn out Journal Bearing No 1 and its Spherical Piece with Support Drive Turbine and BFPs bearings installed in ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; As per tender specification; Service Provider
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Radiological, WT-5204G Work of Radiography testing of various weld joints during AOH COH R and M and as and when required by GSECL UTPS (Metallurgy); Radiography Test..
Auma make Spare nuclear actuator model no. SAI00E90 Commissioning no. 5122514007-01
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - WT-5245G Lube oil sample analysis of various rotating auxiliaries of Unit No 6, 500 MW, UKAI TPS (BMD-6), Mechanical, Ferrography, Chemical; As per ATC; As per ATC, N..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5243G Complete replacement Seal plate and Seal trough bowl in Bottom ash hopper and fabrication erection strengthening of BA hopper plate and structure also providing ..
Temperature transmitter MV/MA as per attached specification
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5256G Work of repairing rectification of ESP of Unit No 3 to 6 on as and when required basis at Ukai TPS; As per Schedule B and scope of work mentioned in ATC; As per ..
Spare/Add on Antenna for Transreceiver/Repeater - Mobile/Static/Handheld (Q2), Battery Chargers For Transceivers (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5251G The work of in situ repairing of High Pressure Valves and Spring Loaded boiler safety valves during AOH COH and as and when required basis at Ukai TPS BMD 2; As ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5248G Work of online, routine preventive break down AOH and COH maintenance of Ash Handling Plant silo system including manual pocking of ash hoppers in unit No 3 4 an..
Cassette Baffles of LTSH and ECONOMISER
T-6374_ SUPER RESIST WEAR RESIST LINING COMPOUND
Video Recorderfor CCTV System (V2) (Q2)
" Balls, diameter 15.875 mm, Material: 100Cr6 (Material No. 1.3505) or AISI-52100
High purity Anti-seize compound Loctite N-5000 (Make- Henkel) in packing size-16 Oz (500 gm approx) .
Flow Integrator Rotating Impeller. Make: M/s. IOTAFLOW SYSTEMS PVT LTD. as per specification.
Consultancy services for preparation of DPR for Upgradation to two lanes with paved shoulder of NH-953 from Km 0/00 (Songarh, Junction with NH-53) to Km 61.658 (Ahwa) in the State of Gujarat
Fabrication and Erection of Steel pipeline and Supply, Fabrication and Erection of steel structure.