Loading…
Loading…
355 live236 closing this weekmost from Energy And Petro Chemicals Department Gujarat and Department Of Atomic Energy
355 results • Latest
ARC OF ERECTION & MAINTENANCE OF HT ,LT, T/C CENTER WORK ON ALL 11KV FEEDER EMANATING FROM 66KV KUMKUVA S/S OF SONGADH SUB DIVISION UNDER VYARA DIVISION UNDER VARIOUS SCHEME.
ARC OF ERECTION & MAINTENANCE OF HT ,LT, T/C CENTER WORK ON ALL 11KV FEEDER EMANATING FROM 66KV MALANGDEV S/S OF SONGADH SUB DIVISION UNDER VYARA DIVISION UNDER VARIOUS SCHEME.
LP(P) -2656 415V LT MCC PANEL WITH COMPLETE MCC POWER AND CONTROL WIRING., Installation, commissioning and testing of air drier bundle and control panel
LP(P) -2688_ Resistance Box For Cable Reeling Drum Motor Rotor Voltage 146V, Rotor Current 2.9A ( 1 the number ten for arbitrary powers ), Resistance Box For Cable Reeling Drum Motor Rotor Voltage 157V, Rotor Current 3.4A ( 1 the number ten for arbitrary powers )
Customized AMC/CMC for Pre-owned Products - Annual Maintenance Contract (AMC) For Profibus system as per attached scope of work; Annual Maintenance Contract (AMC) For Profibus system as per attached scope of work; Annual Maintenance Contract (AMC); Q..
Weightand High Cranking Performance (V2) Conformingto IS14257 (Q3) (PACOnly)
CARDANSHAFT FDILC490, Compressed Length 2270 mm inclusive of end Hubs and coupling bolts and nuts
SITC of a DG Set for Court Building at Valod Di. Tapi.
Services for Annual general maintenance of earthen dam at Ukai. (2nd Attempt)
Providing under water diving services for various works activities at stop log gates groves No 7 ,9 and 14 at Ukai dam
Maintenance and Repaire of Lift irrigation scheme of Suchit juni kachali daba vibhag udvahan Piyat mandali, Juni kachali Ta Uchchal Dist. Tapi.
Maintenance and Repaire of Lift irrigation scheme of Shree Shrumjivi udvahan Piyat Manalim,Naranpura Ta Uchchal Dist. Tapi.
Annual Rate Contract for Supplying and Stacking various type of Building &Road Construction Mat erials, Tools, Plants at various places of Taluka Vyara under Taluka Panchayat, Vyara Dist Tap (3rd Trial)
Interactive Panels with CPU (Q2), Audio Amplifier (V3) (Q2), Speaker (V3) (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 142 The work of vibration analysis of Boiler and Turbine Auxiliaries for 200 210 MW units at GSECL Ukai TPS BMD 2; As per Schedule B and scope of work mentioned in AT..
Complete Spare Actuator; Make: Aira Pneumatics, Model: ARA-50-S, Rack And Pinion Set For Actuator; Make: Aira Pneumatics, Model: ARA-50-S, Seal Kit For Actuator; Make: Aira Pneumatics, Model: ARA-50-S (1 Set Contains 18 Items) ( 10 set )
Set of O-ring (Parker part no. 2-388) and spacer ring (Make: M/s Parker)
Thermofisher Scientific Make Anion Column, 064149, PROD, COL, IP, AS 23, 4X250MM, Thermofisher Scientific Make Cation Column, 079805, PROD, COL, IP, CS16, 5X250 MM., Thermofisher Scientific Make Cation Guard Column, 079931, PROD, COL, IP, CG16, 3X50MM
Goods Transport Service – Per KM Based Service - Livestock; Pickup Truck; Medium Duty
DUPONT Make Molykote G Paste, Pack: 2 Kg Per Can ( 8 kilogram ), DUPONT Make Molykote Z Powder, Pack: 1 Kg Per Can ( 2 kilogram ), DUPONT Make Molykote D321R Aerosolized Spray, Pack: 400 Ml Per Can
Supply of various Refrigerant Gases R-134A, R 407 C, M-22 and R-32 at GSECL, Ukai TPS. [Stores ET-6386-N]
ET-6387 HYDRAULIC COMPARISION TESTER - 0 to 600 Bar, HYDRAULIC COMPARISION TESTER - 0 to 350 Bar, Automated Pressure controller for pressure calibration
Industrial Safety Helmet (V3) ISImarkedto IS2925 (Q2)
ET 6391 SPRAY NOZZLE FOR SPRAY CUM TRAY DEAERATOR
Spares For TOC Analyzer Make- M/s HACH Part No- 19-B5C-017 Dd B5C Pinch Valve C/O, Spares For TOC Analyzer Make- M/s HACH Part No- 19-B5C-015 Dd B5C TYPE 6606 N/C VALVE, Spares For TOC Analyzer Make- M/s HACH Part No- 19-B5C-016 Dd B5C TYPE 6606 VALVE
Reinforced EPDM rubber Diaphragm for pneumatically operated valve actuator as per specification.
Weightand High Cranking Performance (V2) Conformingto IS14257 (Q3)
Operation and Maintenance Of Electrical Systems/Electrical Installations - Supply Installation Testing Commissioning of 16 Mtr Double Section Flag Mast with Motorized Winch Aviation Light Power Supply Arrangement Bhagva Dhwaj at Songadh Nagarpalika
Line Operated Three Phase AC Motors (Induction Motor) ISIMarked To IS12615 (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; As per attached Technical specification/scop of work (section-B); Buyer
71 Frame size 0.37 KW 2 pole 415 V induction motor, 90L Frame Size 2.2 KW 2 pole with metallic fan 415 V induction motor
MMGSY 2026-27 (Strengthening and Resurfacing) Resurfacing of Various Roads in Uchchhal Taluka Package No.29 Total 2 road 2.800 km. Dist.Tapi. (1) Katswan Village Parsali faliya to Parsali Varg Shala toward road Km 0/0 to 1/500 Ta.Uchchhaal (2) Katswan Patel faliya to Maharatra Limit road Km 0/0 to 1/300 Ta.Uchchhaal.
MMGSY 2026-27 (Strengthening and Resurfacing) Resurfacing of Various Roads in Nizar and Uchchhal Taluka Package No.27 Total 2 road, 5.200 km. (1) Nava Vanka Adhivasi faliya to Sajipur Joining road 0/0 to 2/0 (W/S Sec-I 0/0 to 0/500, Sec-II 0/0 to 0/500, Sec-II 0/0 to 0/5000 Ta.Nizar (2) Bhintbhudrak Approach road Km 0/0 to 3/700 Ta.Uchchhal.
MMGSY 2026-27 (Strengthening and Resurfacing) Resurfacing of Various Roads in Uchchhal Taluka Package No.28 Total 2 road 1.640 km. Dist.Tapi (1) Bhadbhunja to Khkda Maharatra joining road Km 0/0 to 1/00 Ta. Uchchhaal (2) of Uchchhal S.H. to Maharatra Boundry Navapur road Km 0/0 to 0/640 Ta.Uchchhaal.
MMGSY 2026-27 (Earthan to BT) Construction of C.C road On Dholiumara faliya to Lift irrigation joining road Km 0/0 to 0/600 Ta. Uchchhaal Dist.Tapi.
Atalwadi 2026-27 Construction of Atalwadi at Vadi Buhari . Tal.Valod , Dist.Tapi
Atalwadi 2026-27 Construction of Atalwadi at Vadi Bhensrot. Tal.Ukai, Dist. Tapi
Atalwadi 2026-27 Construction of Atalwadi at Toarkva. Tal.Songadh, Dist.Tapi
Atalwadi 2026-27 Construction of Atalwadi at Karod. Tal.Uchchhal, Dist.Tapi