Loading…
Loading…
355 live236 closing this weekmost from Energy And Petro Chemicals Department Gujarat and Department Of Atomic Energy
355 results • Latest
MMGSY 2025-26 Earthan to BT (Vanbandhu Kalyan Yojna-2) Const.of Vadi Bhensrot main road to Tapi faliya to Borisavar Joining road Sec-I 0/0 to 1/400, Sec-II 0/0 to 1/100,Sec-III 0/0 to 0/550 Ta. Songadh Dist.Tapi.
BLP 2026-27 Package no.02 Construction of Bridge Inspection Platform for 1. Kanpura Musa Road Ch.0/000 to 0/200 2. T-15 Vyara Panvadi Musa Madav Chhindiya Meghpur Balpur Wanrdevi Umarvavnajik Gadat Bhojpurdur Bedchit Road Ch. 1/600 to 1/800 3. T-15 Vyara Panvadi Musa Madav Chhindiya Meghpur Balpur Wanrdevi Umarvavnajik Gadat Bhojpurdur Bedchit Road Ch. 7/000 to 7/200 Dist. Tapi
LPP-2713G - GEARED MOTOR Type SA97/T DRN112M4/BE5HR LT MOTOR WITH DC BRAKE: 415 V, 4 KW, RPM-1460 ( 2 set ), Pinion (Group: SA97 Part No: 00042323) For GEARED MOTOR: Type SA97/T DRN112M4/BE5HR ( 2 Unit ), GEAR UNIT HOUSING (GROUP: SA97 PART NO: 06440290) FOR GEARED MOTOR: TYPE SA97/T DRN112M4/BE5HR ( 2 Unit ), TORQUE ARM CPL. (GROUP: SA97 PART NO: 06442528) FOR GEARED MOTOR: TYPE SA97/T DRN112M4/BE5HR ( 4 Unit )
ET-6309-1A_ DUST PROOF ACRYLIC CABIN FOR WEIGHBRIDGE SYSTEM 20' X 8' X 8' 6", DUST PROOF ACRYLIC CABIN FOR WEIGHBRIDGE SYSTEM 10' X 10' X 8' 6"
Various Lifting and Shifting Equipments
LP(P) -2694: hydrogen purity analyser panel with gas density sensor, converter and connecting cable.
LPP 2683 COMPLETE BARE PUMP ASSEMBLY OF JACKING OIL PUMP, MAKE: ALLWEILER GMBH FOR 500 MW UNIT NO. 6
Construction of open shed for dozer maintenance behind coal sampling room at Ukai TPS.(WT-5262 Civil PH)
Improvement of Existing Irrigation Infrastructure works on Sadadvel Left Minor Ex.Bamanvada Minor.
Improvement of Existing Irrigation Infrastructure works on Sadadvel Right Minor Ex.Bamanvada Minor.
Improvement of Existing Irrigation Infrastructure works on Fadvel Minor Ex.Vandarvela Distry.
Improvement of Existing Irrigation Infracture works on Donja Minor Ex. ULBBC.
As & when required hiring of JCB for coal plant area & other civil works at Ukai TPS for the year 2026-27.(WT-5267 Civil PH)
Improvement of Existing Irrigation Infrastructure works on Kaliyari Minor Ex.Ambach Distry.
Improvement of Existing Irrigation Infrastructure works on Kaliyari Sub Minor Ex.Kaliyari Minor.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5250G (TMD-II) Work of attending coil (tube) punctured in HP Heaters of 200 - 210 MW Units 3 4 and 5 at Ukai TPS on as and when required basis for the year 2026-27; A..
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - NDT; Ultrasonic Testing Facility; PAUT Testing of weld joints
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - NDT; Eddy Current Testing facility, Leak Testing Facility, Magnetic Particle Testing, Penetrant Testing Facility, Radiography Testing Facility, Ultrasonic Testing Fac..
W96414400025 STROBOSCOPE
LP(P) -2715: INCREMENTAL ENCODER, SPRING STEEL COUPLING
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Educational; Mechanical machine; Service Provider
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At. Devgadh Tal.Mandvi Dist.Surat
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At.Garpani Tal. Dolvan Dist. Tapi
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At.Vaghzari Tal. Vyara Dist. Tapi
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At. Dhamadra (Dekai) Tal.Garudeshvar Dist.Narmada
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At.48/1 Bagalpur ,Tal. Dolvan Dist. Tapi
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At. Umara(Chaudhari Faliyu) Tal.Ambika(Valvada) Dist.Surat
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At. 49-Dolvan Tal. Dolvan Dist. Tapi
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At.5A Bamnamal Tal.Dolvan Dist.Tapi
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At.Mordevi (Nachniya) Tal. Valod Dist. Tapi
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At.Angaldhara Tal. Ambika(Valvada) Dist.Surat
Construction, Operation & Maintenance (for 5 Years) of Lift Irrigation Scheme At.42/1 Ghani Tal. Dolvan Dist. Tapi
Construction of New Inlet Structure on U.L.B.M.C. at Ch. 55734M.
Renovation work of VRB at ch. 6150 mt. on Kankariya Distry.
Renovation work of Fall at ch.4950mt, 10260mt, 10770mt and VRB at Ch.9875mt structures on Vedchhi distry.
Renovation work of VRB at ch. 3900 mt. on Jamaniya Distry.
Bank Stabilization and Protection Works at Ch. 1555 to 1675 m of Kelia Left Bank Branch Canal
Restoration work of Flood Damage of Bhatpur Distry & its minors.
Rehabilitation and Restoration of Flood-Damaged works on U.L.B.M.C.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5259G Works of Annual Maintenance Servicing or Repairing or Testing Contract for L and T make ACB of 200 or 210 MW Unit No 3 4 & 5 at Ukai TPS; Power House Equipment..
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Maruti Suzuki XL6; 2024; 25, 000-50, 000 kms; A/C; 24
Supply of Tungsten Halogen Lamp compatible with UV-VIS Spectrophotometer Make: Shimadzu, Supply of Deuterium UV Lamp compatible with UV-VIS Spectrophotometer Make: Shimadzu
Maintenance, Servicing and Painting to Main Penstock Gate Unit No.03 Including its Hoisting Arrangements at Ukai Dam
Maintenance, Servicing and Painting to Main Penstock Gate Unit No.04 Including its Hoisting Arrangements at Ukai Dam
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5254G Fabrication work of weather protective shed canopy on ESP Rectifier transformer and its EOT Crane in Unit 3 and 4 EMD II GSECL UTPS EMD2; Power House Equipment, ..