Loading…
Loading…
4,000 results • Latest
COVER TO DRG NO, 20-01-69A(AS PER DRAWINGS AND SPECIFICATIONS)
100 TKT SPUN POLYESTER SEWING THREAD(OLIVE GREEN) (IN TUBES OF 1000 MTRS. EACH)
Sub Work. Supply, Erection and Commissioning of roof top mounted Solar Photovoltaic Power Plant of 25 KWp for the Construction of Combined Court Building to accommodate 6 Court Halls and Bar Association at Panchetty in Tiruvallur District
Sub Work Providing Internal And External Electrification to the newly constructed Girls Hostel in Govt. Model School at Thandurai, Thiruvallur District
Vibration Damper as per BHEL Drawing
Dashboard Camera (V2) (Q2)
RESTORATION OF ROAD CUT UP TO BT WORK MADE BY CMWSSB AT ASSISI NAGAR EXTN 2ND STREET IN DN-26, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO BT WORK MADE BY CMWSSB AT ASSISI NAGAR EXTN 1ST STREET IN DN-26, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT SIVABOOSHAM STREET AND LOGU STREET IN DN-27, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO BT WORK MADE BY CMWSSB AT GANESH NAGAR, RAMACHANDRAN IN DN-26, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT THILAGAR STREET AND PVN NAGAR 2ND STREET IN DN-27, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO BT WORK MADE BY CMWSSB AT DURAISAMY STREET IN DN-26, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO BT WORK MADE BY CMWSSB AT EDAIMA NAGAR MILK COLONY IN DN-26, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT PVN NAGAR 1ST STREET AND PVN NAGAR 3RD STREET IN DN-27, UNIT-7, ZONE-3
Providing hume pipe at Bajanai Koil Street in DN-24, Unit-06, Zone-03
Providing Interlocking block around food kiosk, Modular toilet and Boating entrance North side for Madhavaram lake at Kamarajar Salai in DN-27, Unit-07, Zone-03
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT MUTHUPAL STREET, RENUKADEVI STREET,MAHAKAVIBARATHIYAR STREET AND NAGOOR MEERAN CROSS STREET IN DN-27, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT PACHAIYAPPAN GARDEN 3RD STREET 1ST CROSS STREET, ANNAI INDRA NAGAR BARATHI STREET, PACHAIYAPPAN GARDEN 3RD STREET 2ND CROSS STREET AND PACHAIYAPPAN GARDEN 3RD STREET 3RD CROSS STREET IN DN-27,
Repair and improvements work for Chennai Middle School at Madhavaram Milk Colony 5th unit in DN-26, Unit-07, Zone-03
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT JAYALAKSHMI STREET IN DN-27, UNIT-7, ZONE-3
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT MOOGAMBIGAI STREET IN DN-27, UNIT-7, ZONE-3
Providing view cutter (Transformer enclosure) at Gandhi main road in DN-23, Unit-06, Zone-03
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT MANIETTIYAPPAN STREET AND MARIYAPPAN STREET IN DN-27, UNIT-7, ZONE-3
Providing Platform for Vending Zone at Jaimaruthi Nagar in DN-31, Unit-08, Zone-03
Art work at Sembium Redhills Road Under Pass East Side in DN-31, Unit-08, Zone-03
RESTORATION OF ROAD CUT UP TO BT WORK MADE BY CMWSSB AT MEENAMBAL AVENUE 2ND STREET IN DN-27, UNIT-7, ZONE-3
Art work at Sembium Redhills Road Under Pass West Side in DN-31, Unit-08, Zone-03
Annual Maintenance for Pura Kulam at Gandhi main road in DN-23, Unit-06, Zone-03
PERCENTAGE RATE CONTRACT FOR REPAIRS TO WATER SUPPLY DISTRIBUTION LINES AT HVF FACTORY.
TAPER PIN (R1) AS PER R1 SIZE TO DRG NO. 304-30(AS PER DRAWINGS AND SPECIFICATIONS)
BUSH FOR CONNECTING ROD BIG END TO DRG NO. 304-20- 5(AS PER DRAWINGS AND SPECIFICATIONS)
GEAR (FORGING) UPTO OPN NO. 0-20 TO DRG NO. 308-53- 2(AS PER DRAWINGS AND SPECIFICATIONS)
CLIP TO DRG NO. 3320-298(AS PER DRAWINGS AND SPECIFICATIONS)
PERCENTAGE RATE CONTRACT FOR MINOR / PETTY DAILY REPAIR WORKS IN PUBLIC BUILDINGS AT HVF ESTATE
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT AVM AVENUE 2ND STREET, AVM AVENUE 1ST STREET, AVM AVENUE 2ND CROSS STREET AND AVM AVENUE 1ST CROSS STREET IN DN-27, UNIT-7, ZONE-3
Improvements to Councillor Room at EMS Street in DN-31, Unit-08, Zone-03
RESTORATION OF ROAD CUT UP TO CC WORK MADE BY CMWSSB AT AYYAVU STREET, AVM AVENUE 4TH STREET AND KETHSAMANE STREET IN DN-27, UNIT-7, ZONE-3
Construction of Security Room and Electrical work at Birlla Avenue Open Gym at Birlla Avenue Main Road in DN-31, Unit-08, Zone-03
Improvements to Arignar anna nagar Culvets at Arignar anna nagar main road in DN-31, Unit-08, Zone-03
Construction of Toilet, Bore Well and Soft Landscaping (Greenery) at Birlla Avenue Open Gym at Birlla Avenue Main Road in DN-31, Unit-08, Zone-03
RESTORATION OF ROAD CUT WORK MADE BY TANGEDCO AT TEACHERS COLONY 1ST CROSS STREET IN DN-33, UNIT-8, ZONE-3
Beautification work at Thiru Vi Ka Street in DN-31, Unit-08, Zone-03
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair work of the rolling shutter in Non Power House buildings at NCTPS II
Dismantling of Old Building and construction of Store Room Building at VeeraRaghavapuram Pillaiyar koil street in ward no.13
NCTPS II Civil Maintenance Circle Civil Maintenance Division Formation of RCC road along with south side of forebay channel at NCTPS II from Ch 0m to 160m
Outsourcing of 2 Nos of Computer Operator / Data Entry Operator to Carryout the day to day (typing) data entry works through licenced contractor on need basis each one for O/o. CE/E and SE/C
NCTPS I SE M II Circle ICHS Dn Reconditioning of Drive wheel bogie assembly released from Stacker and Reclaimers of ICHS
NCTPS I SEMII Circle ICHS Dn Overhauling and Reconditioning of worn out Elecon make Helical Gear Box Model SBN 355 Ratio 22 4 1 released from conveyor 8A
NCTPS I SE MII Circle ICHS Dn FOPH Painting of top roof surface of HFO tank I II HSD tank and painting the outside surface of HSD tank
NCTPS I Operation Circle CA Dn DM Plant Dismantling Fabrication Rubber lining and Erection of MSRL supports at various locations in the DM Plant area