Loading…
Loading…
4,221 results • Latest
Maintenance of Coupe road from 1974 TP to Kundoormedu (6 km) in Chrpa Range during 2025-26
Maintenance of Coupe road from Noottudumban to Orukomban (14 km) in Chrpa Range during 2025-26
Vayal maintenance at Panjanamkuthu area in Charpa Range during 2025-26
Supply and Installation of 8 Mtr Mini Mast system with 6 x 120W LED Flood Lights at Azhakam Durgadevi temple, ward-4 in Kodakara Grama Panchayath, Thrissur District under MPLADS 2024-25 of Sri. Benny Behanan MP
Soil moisture conservation of Pranchithode Vayal in Charpa Range during 2025-26
Soil moisture conservation of Pranchithode Vayal in Charpa Range during 2025-26
Annual Plan-OLK Zonal Div 11Mukkattukkara 2026-27 Pre monsoon Thodu cleaning from Chiradam to Vyloppilly Kuttumukku road General Civil Work
Estimate for the cost of Vayal maintenance at Pranchithodu area in Charpa Range during 2025-26
Maintenance of Coupe road from Dormitory to Onnampalam (8 km) in Chrpa Range during 2025-26
State Plan 2025_26 _ Proposals under the head Drinking Water Drought Mitigation and Emergency Works CARWSS to Kadangode and Adjoining Panchayaths_Supplying and fitting UG cable-at Kondayur Pump house_General Electrical Work
Maintenance of Trek Path from Panjanamkuthu to Charpa padam 4 km in Chrpa Range during 2025-26
Vista Clearence from Anakuthi to Onnampaalam in Charpa Range during 2025-26
Maintenance of Trek Path from Orukomban to Muthuvarachal (10 km) in Chrpa Range during 2025-26
Womens Vocational Training Centre Improvements
Vikas Bhavan Improvements-S0 138/26-
Souhrida Nagar Drinking Water Supply Scheme Ward 2-SO388/26-
Supply and Installation of 4 Nos. of 7 Mtr Mini Mast system with 3 x 70W LED Flood Lights at various locations in Wadakkanchery Municipality, Thrissur District under Annual Project 2025-26, Project No 201/25
PAZHAMPUZHA VAIDHYASHALA ROAD MAINTANANCE WARD 02
Supply and Installation of 7 Nos. of 6 Mtr 35W All in One Solar Street Lights at various locations in Eriyad Grama Panchayath, Thrissur District under Annual Project 2025-26, Project No. 59
Re-Tender-Annual Plan- Vellangallur GP 2023-24 Rennovation of panchayath office - Phase 2-332
BUILDING RENOVATION
GENERAL M R Monsoon Preparedness Chettupuzha chal from Chettupuzha Bridge to Parayanthazham Bridge joint to the Kottachal Removal of obstructions for the year 2026 to 2027 General Civil Work
GENERAL M R Monsoon Preparedness Chettupuzha chal from Elthuruth bridge to Chettupuzha Bridge Removal of obstructions for the year 2026 27 General Civil Work
GENERAL M R Herbert canal from Commandomugham to Inchamudi Removal of Obstructions for the year 2026 27 General Civil Work
BOREWELL CONSTRUCTION AT 12 SITES IN THRISSUR DISTRICT
GENERAL M R Monsoon Preparedness Chettupuzha chal from Muppuzha junction to Elthuruth bridge Removal of obstructions for the year 2026 27 General Civil Work
GENERAL M R Monsoon Preparedness Puzhakkal Chal from Kurinjiakkal bridge to Pulla cheriya bridge Removal of obstructions for the year 2026 27 General Civil Work
GENERAL M R Monsoon Preparedness Puzhakkal Chal from Puzhakkal bridge to Kurinjiakkal bridge Removal of obstruction for the year 2026 27 General Civil Work
BOREWELL CONSTRUCTION AT 7 VARIOUS SITES IN THRISSUR DISTRICT
GENERAL M R Annual Maintenance of Illikkal Ettumuna Kottenkottuvalavu Inchamudi Regulator for the year 2026 27 General Civil Work
GENERAL M R Annual Maintenance of Enamakkal Idiyanchira Regulator 51 thara Parappuzha for the year 2026 27 General Civil Work
MATERIAL SUPPLY
LT STANDARDISATION WORK AT KALPAKA TRANSFORMER UNDER ELECTRICAL SECTION KATTOOR
Paper-based Printing Services - Printing with Material; Certificate; Offset
Electrification
Annual Plan-Cherpu GP 2025-26 PRO.NO . 39/26-Providing basic facilities for women fitness centre
Annual Plan-Cherpu GP 2025-26 PRO.NO. 298/26-Drainage maintenace and hand rail fixing in peruvanam chira
Annual Maintenance Service - Desktops, Laptops and Peripherals - Desktop PC; hp
Annual Plan-Cherpu GP 2025-26 PRO.NO.50/26-PROVIDING BASIC AMINITIES IN AYURVEDHA DISPENSARY
Annual Plan-Cherpu GP 2025-26 , PRO.NO 296/26-Waste management collectors at school Phase 2
Blank ID Cards (V2) (Q4), ID Card Holder (V2) (Q4)
Providing and laying paving tile yard, dismantling planter,shifting flagpost infront of Chalakudy Division
Desilting and protection works for drinking water wells at Koodapuzha quarters compound,Division office compound,and SS quarters compound
KOONAMPARAMBU SAMSKARIKA NILAYAM ELECTRIFICATION
129564 MLA-SDF-Wadakanchery LA, 2025- 26,Construction of Puthiserry-Muthuvara - Center-Erlampadam Road ,Adatt GP , Puzhakkal BP-In Puzhakkal BP
Annual Plan-Electrification of FWC Vattekad in Kadappuram GP-S0277/26
KATTIKAKRAKKUNNU COMMUNITY HALL ELECTRIFICATION
The provisions included in this estimate are Clearing the compound, Engaging the Carpenter, Scavenger,Coolie , Plumber etc , PVC pipes and fittings items for the maintenance of the pipe lines , Long body tap, Wash basins, Water closet
dismantling and re roofing of the the M.P tiles, and Absetos sheet, demolishing the old tile work in toilet and veranda and reflooring,false ceiling ,Aluminium work ,Ready made septic tank