Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
917 results • Latest
Anuual Maintenance of to NH 234 To Connecting Kurudi via Vadrahatti Chikkahosahalli hanumathapura hunasavadi Road from CH 3.00 to 3.75 KM, 3.77 to 5.11 KM, 5.25 To 6.82 KM, 7.05 To 8.52 And 9.52 TO 11.20 Km In Madhugiri Taluk for the year 2026-27
Annual Maintenance of Road PN Halli to Dharmapura Via Hulikunte From Ch 0.00 to 4.00, 8.70 to 11.00, 11.40 to 14.00 and 16.00 to 23.30 km in Sira taluk for the year 2026-27(CATEGORY-I RESERVED)
ANNUAL MAINTENANCE OF THE ROAD FROM NS ROAD TO KORATAGERE BOARDER VIA TARURU GATE JUNJAPPANAGUDI FROM CH-0.00-9.80 & 10.40-15.00 KM IN SIRA TALUK FOR THE YEAR 2026-27(total length 15.00km from ch-0.00-15.00 km over lap length 0.60km)(SC RESERVED)
ANNUAL MAINATENANCE OF THE ROAD FROM NH-4 TO TO BYDARAHALLI VIA YALADABAGI FROM CH-0.00-8.00 KM IN SIRA TALUK FOR THE YEAR 2026-27(Total length 14.00km,from ch-0.00-14.00km) (SC RESERVED)
Annaul Maintenance of Road starting From Andrapradesh Border to Karehalli via karekyatanahalli,Basavanahalli at Ch. 12.30 to 21.20 km and Ch. 27.00 to 28.20 km in Sira Taluk (Total Length 28.20km, Ch.0.00 to 28.20 km, Overlap 4.20 km)(SC RESERVED)
Annual Maintenance of Road Hariyajjihalli to Harogere Via Gonihalli From Ch 0.00 to 3.50, 8.50 to 12.63 and 13.00 to 14.00 km in Sira taluk for the year 2026-279(SC RESERVED)
Annual Maintenance of Road Tavarekere to Bevinahalli From Ch 0.00 to 3.00, 6.00 to 12.00 and 14.00 to 17.50 km in Sira taluk for the year 2026-27 RESERVED FOR CATEGORY I
AN NUAL MAINTANCE OF THE ROAD FROM NH-48 KURIHALLI RANTAVALA JOINING AP BOARDER VIA MUDDENAHALLI FROM CH-0.00 TO 13.90 KM IN SIRA TALUK FOR THE YEAR 2026-27(TOTAL LENGTH 13.90KM, FROM 0.00-13.90KM)
Annual maintenance of Gangasagara-Obalapura MDR from ch.6.70km to 9.90km,10.75km to 14.76km and 15.90km to 21.60km in Pavagada Taluk for the year 2026-27
Annual Maintenance of road starting from NH-150A Challakere to Vishwanathanahalli via Parashurampura (SH-48),Darmapura (SH-24),Dwaranakunte,Lakkavvanahalli,Kodihalli,Adivala (NH-48) Kalagatta at Ch.109.72 to 116.46 km in Sira Taluk for the year 2026-27 (Total Length 6.74km, Ch 109.72 to 116.46)
ANNUAL MAINTENANCE OF THE ROAD FROM HUNJANALU TO JODIDEVARAHALLI VIA KALISHETTIHALLI FROM CH-7.00-10.50 KM IN SIRA TALUK FOR THE YEAR 2026-27(TOTAL CH 10.50KM, FROM 0.00-10.50KM)
Annual Maintenance of Road Bandakunte to Pattanayakanahalli via Veeraganahalli From Ch 0.00 to 2.00 and 4.00 to 9.50 km in Sira taluk for the year 2026-27
Annual Maintenance of Road Hemdore to Kotti via Bramhasandra, Shivanaiahnapalya From Ch 3.70 to 11.50 km in Sira taluk for the year 2026-27
Annual maintenance of Mangalawada-Shylapura MDR from ch.0.00 km to 2.00km and 5.00km to 15.60km in Pavagada Taluk for the year 2026-27(SC RESERVED)
Annual Maintenance of Road Connecting Tumkur (NH-73) to Virupasamudra (AP Border) SH-184 from Ch.152.30km to155.55km, 159.50km to 177.70km and 183.95km to 200.90km in Pavagada Taluk for the year 2026-27(ST RESERVED)
Annual maintenance of Kumata-Kodamadagu SH-48 from ch.357.00km to 361.90km, 363.40km to 369.00km, 371.00km to 374.25km, 376.00km to 379.23km and 380.63km to 383.90 for the year 2026-27(CATEGORY-II(A) RESERVED)
Annual maintenance of Dommathamarri-Gummaghatta MDR from ch1.00km to 6.60km in Pavagada Taluk for the year 2026-27(ST RESERVED)
Annual maintenance of Pavagada-Devalakere MDR from ch.0.00km to 5.40km amd 8.70km to 14.00km in Pavagada Taluk for the year 2026-27(CATEGORY-II(A) RESERVED)
Annual maintenance of Y.N.Hosakote-Bestrahalli MDR from ch.0.00km to 3.00km and 4.50km to 6.60km in Pavagada Taluk for the year 2026-27(SC RESERVED)
Maintenance of Compound and other maintenance work for Y.N.Hosakote PWD Supervisor Quarters in Pavagada Taluk(CATEGORY-I RESERVED)
Construction of Lateral Drain at ch.9.50km and 11.50 km of SH-48 to Shilapura, via Nidagal Joining Andra border MDR in Pavagada Taluk for the year 2026-27(SC RESERVED)
Annual maintenance of Gangasagara-Obalapura road from Hanumanthanahalli village via Bheemanakunte to Joining Andra border MDR from ch.0.00Km to 27.90km in Pavagada Taluk for the year 2026-27(SC RESERVED)
Annual maintenance of Road Connecting from SH-48 to Pavagada-Venkatammanahalli Road Via Srirangapura, Pendlijeevi MDR from ch.3.69km to 16.40km in Pavagada Taluk for the year 2026-27
Annual maintenance of Doddahalli - Y.N. Hosakote MDR from ch1.50km to 8.40km in Pavagada Taluk for the year 2026-27
Annual maintenance of Supervisor quarters attached to the JE Quarters in Pavagada Town
Annual maintenance of SH-48 to Shilapura, via Nidagal Joining Andra border MDR from ch. 0.00km to 14.90km in Pavagada Taluk for the year 2026-27
Annual Mintenance of Pavagada-Venkatammanahalli main road via Palavalli B.K.Halli road to Joining Andra border MDR From 0.00km to 18.90km in Pavagada Taluk for the year 2026-27
Annual maintenance of Arasikere-Vadanakallu MDR from ch.4.00km to 5.70km and 6.40km to 12.80km in Pavagada Taluk for the year 2026-27
Annual maintenance of SH-48 to Kenchammanahalli gate via Sasalakunte MDR from ch.1.15km to 5.30km in Pavagada Taluk for the year 2026-27
MAINTENANCE OF ROAD STARTING FROM SIRA AMARAPURA ROAD TO VAJARAHALLI VIA HULIKUNTE AT CH.8.50 TO 11.70 KM IN SIRA TALUK FOR THE YEAR 2026-27 ( TOTAL LENGTH -11.70 KM, CH 0.00KM TO 11.70 KM)(ST RESERVED)
Annual Maintenance of Road SA Road to Andrapradesh Border Via Sigalahalli, Huligere From Ch 0.00 to 5.60 and 6.70 to 8.00 km in Sira taluk for the year 2026-27
Construction of New A site RO Kunigal to Huliyurdurga Road within Kadumathikere Village at SY No.72/3, Village-Kadumathikere, Taluk Kunigal, District Tumkur under Mysore DO of KASO
smart forest sticks
Supplying of Ready Diet Food, Milk And Bread To GH Gubbi, Tumakuru Dist
Supply of Lab reagents to MCH Sira
Supplying of Medical Equipment Cleaning Items and hospital consumables To General Hospital Koratagere
Self execution work of Shifting of electrical poles in Kanchaghatta feeder halla in Kasaba hobli, Tiptur taluk, Tumkur district.
Preparation of Detailed Project Report for the work of Construction of Series of Check dam in sy.no.39 of Thonnalapura village in Chikkanayakanahalli Taluk, Tumakuru District.
Self execution work of Shifting of electrical poles in Tiptur Uramundinakere tank bund in Kasaba hobli, Tiptur taluk, Tumkur district.
Facility Management Services - LumpSum Based - TENDER FOR THE PROCURE, SUPPLY, INSTALLATION OF LAPTOPS; TENDER FOR THE PROCURE, INSTALLATION OF LAPTOPS; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - TENDER FOR THE PROCURE, SUPPLY, INSTALLATION OF LAPTOPS; TENDER FOR THE PROCURE, INSTALLATION OF LAPTOPS; Consumables to be provided by service provider (inclusive in contract cost)
Construction of State Tigula Development Committee Community Building (Continued) of Gubbi Town Panchayath Limits.
Development in old Ak Colony Burial Ground Road 2nd Bridge to Burial Gound work in Gubbi TP under Phase-3
Construction of Mahalakshmi Samudaya Bhavana (Continued) in Ward No. 02 of Gubbi Town Panchayath Limits- Phase-03
Drilling of Borewell and Installation of Motor Pump near WTP Near Court Premises and near Gattilayout for Drinking water in Gubbi town Panchayath Limits
Construction of community building near Noorani Masjid continued at ward no 09 in Gubbi Town Panchayath limits
Supply of Necessary Materials for Routine Repair and Maintenance of PVC Water Supply Pipelines under the Water Supply Department, in Gubbi Town Panchayath Limits.
PROVIDING NON-CLINICAL EMPLYOEE SERVICE TENDER FOR TALUK GENERAL HOSPITAL TARIKERE, CHIKKAMAGALURU DIST FOR THE YEAR 2026-27
DIGGING , FILLING PLANTING AND MAINTAINANCE FOR ONE YEAR FOR IMPROVEMENT OF MG ROAD, GENERAL KARIYAPPA ROAD AND KUNIGAL MAIN ROAD FOOTPATH BY PLANTING GROUND COVERS AND PLANTATION OF FLOWERING SHURBS AND HEDGES TO MEDIAN
Construction of Staff Quarters Residential building at Banashankari Forest Quarters Premises in Tumkur Town During 2026-27