Loading…
Loading…
1,046 results • Latest
Construction of Check dam across halla near Davanada Hosahalli Village in Handanakere Hobli, Chikkanayakanahalli Taluk, Tumkur District.
Construction of check dam cum cause way near Y.K.Doddi (Yalekadakalu) village in Kunigal taluk Tumkur District
Construction of series of Checkdam across halla flowing from Gadabanahalli to Sarigehalli tank in Kibbanhalli hobli, Tiptur taluk, Tumkur District.
Improvements to Navile Tank in Chikkanayakanahalli Taluk, Tumkur District.
Construction of Checkdam cum bridge across halla near Adinayakanahalli Village in Honnavalli hobli, Tiptur taluk, Tumkur district.
Prepration and submission of Detailed Project Report for the work of Construction of Series of Check Dams to Halla of Gadabanahalli to Sarigehalli Tank in Kibbanahalli hobli, Tiptur taluk, Tumkur District.
Work for repairing pipelines and valves leakage, fabricating valve rods, extension and ladders, installation of repaired 240 HP Submersible pump. 01, and repairing and commissioning the sluice gates installed at the reservoir at the Bugudanahalli 30 MLD Water Treatment Plant belonging to Tumakuru City Corporation.
Providing and laying replacement of deteriorated 250mm dia C.I rising main to D.I pipeline from pump house at mandipete to Chruch circle under city corporation tumkuru
Supply of Group D on outsource basis to CDPO Office Pavagada
Drilling of Borewells in Ward no 19 Near Gouse A Ajam madarasa back side of RO Plant and Jamiya Choutri Fixing of pump motor in ward no 19 RO Plant back side And jamiya Choutri.
Transformer Shifting and Poles shifting and new poles erection In Private bus stand Sira CMC Limits
Providing manpower on outsource basis to Department of Fisheries, Zilla Panchayath Tumkur(DEO, Fisheries Assistant, Driver and Group D)
Annual maintenance of Borewells pump and motor in Huliyar TP Limits
Providing & supplying man power (Driver) to Assistant Executive Engineer office,Yettinahole project Sub Division No.03 K.B.Cross (Camp-Tumkur)for the Year 2026-27
Supply of man power to MD office and CAO Office
supply of bandh dhalayath man power to special land aquisition office,yettinahole project, tumkur from 01.02.2026 to 31.01.2027
Supply of Electrical Sewing Machine for Disabled Persons Pertaining to District Disabled Welfare officer Tumkur District
AUTO BALLOONING SOFTWARE
Construction and Installation of 1000 LPH RO Plant in Hariyappanahalli (Mastipalya) village in Kora GP of Tumkur taluk Tumkur district
Construction of CC road and drain in Kenchanahalli Village, Bandhigowdanapalya Village, R.byadarahalli Village, Shasthripalya Village, Handhalagere Village, Honnegowdana Doddi Village, Bommenahalli Village of Thavarekere Gram panchayathi, Kempanahalli & Arallimaradha Doddi Village of Thavarekere Gram panchayathi, Thavarekere Village, Hosadoddi Village, Kichavadi village, Paavasandra Village, Hallevooru Village of Huliyurdurga hobli, Kunigal Taluk.
Improvements of road &drain in MallaghattaBasavanna temple road Dasara Bannimantapa surroundings in ward23 crusher govindaiah House road, ward no12 tiles ramesh house road, Manjula rangappa house road, Nagapriya school road, DivyaBar rajanna House road ,ward 3 SMSchool road ,from Tirupalli cremation to Canal road, ward22 govindarajuKalegowda house road ,doddakere Lakshmidevihanta agnivamsaksatriya sangha to Canalsluicegate ,CD bidangere hunasekattekere kodihalla kunigal Tq
IMPROVEMENTS TO ROAD FROM KEMPASHAIYANAPALYA MARAMMA TEMPLE TO THEREDAKUPPE MAIN ROAD TUMKUR KUNIGAL BORDER TO KATTEPALYA VILLAGE VIA KURIBORANAPALYA AND KALSIPALYA VILLAGE TO CHANNIGOWDANAPALYAAND FROM SINGRIPALYA VILLAGE TO AYYANAGOWDANAPALYA AND KOTEKERE VILLAGE IN KOTHAGERE HOBLI KUNIGAL TALUK
Improvements to Service Road and metaling from Ch 0.00 Km to 15.00 Km of D-24 Under TBC
Improvements to road and drain from Koolikumar house to Railway Station, Murugeshanna house road in Ward No.22 K.S.R.T.C extension area beside Gas godown of Ward No.02 of Kunigal Town and S.C.Colony to P.W.D road of Rajagere Village, from Kempanahalli village to Siddamannipalya village, Gangaraju House of Siddamanipalya to Reevayya House, Hunasekuppe village to Ippadi Seegepalya road, construction of CC road in Kundhuru village limits of Hutridurga hobli, Kunigal Taluk.
Supplying of Drugs, Lab Chemicals To General Hospital Gubbi
Removal of Jungle and Slipped Earth in D-7 of NBC
Operation And Maintainance OfKunadaranahalli and Sopanahalli Dwss Pump House, 63KVA Transformer Sub Station, Rising Main And Distributory Network Till Delivery Tanks
Removal of Jungle and Slipped Earth in D-10A, D-10A1, D-10A2 and Sampige DPO of TBC
Operation And Maintainance Of Honnavalli Dwss Pump House, 11kv/415v Transformer Sub Station, Rising Main And Distributory Network Till Delivery Tanks
Operation And Maintainance Of Kenkere Dwss Pump House, 11kv/415v Transformer Sub Station, Rising Main And Distributory Network Till Delivery Tanks
Removal of Jungle and Slipped Earth in D-8 of NBC
Removal of Jungle and Slipped Earth from Ch0.00 km to 18.20 Km of D-10 of TBC
Removal of Jungle and Slipped Earth in selected Reaches from Ch0.00 km to 9.00 km of D-8 of TBC
Operation And Maintainance Of Madenur Dwss Pump House, 11kv/415v Transformer Sub Station, Rising Main And Distributory Network Till Delivery Tanks
Removal of Jungle and Slipped Earth in D-6 and D-6A of NBC
Removal of Jungle and Slipped Earth in Ridge Canal and 14000 m Minor D-8 of TBC
ELD OLD AUTOMATIC CHECKING AT LPG PLANTS
providing pump motor cable to existing bore wells and 20HP motor to old pump house in Pavagada TMC Limits
Custom Bid for Services - CALIBRATION OF SPECTROMETRIC OIL ANALYSIS PROCEDURE (SOAP) EQUIPMENT Similar Category Calibration Services
Improvements and repairs damaged portion Canal Lining and Service road,Embankment in selective reaches of d24 between ch1.00 to ch10.00km under TBC
Improvement of cement concrete drain and culvert in SC colony of kankuppe village of Hebburu Hobli of Tumakuru taluka
Providing Skin wall to Existing Waste wiers to arrest leakage in Kankuppe Tank in Hebbur Hobli of Tumkuru Taluka
Kothagere tank bund seepage repair under jurisdiction of NO3 HCI sub division hebbur for the year 2026-27
Improvements at Andra Border in Road from NH-4 To Andra Border Via Urakere Tovinakere dabbegatta, Rantavalalu in Madhugiri taluk
Preparation of Detailed Project Reports (DPRs) for Preparation of DPR for Construction of Pre-metric boys hostel, Tiptur Town (BCWD-1097), Construction of Model pre metric Girls Hostel, Vidyanagar Tiptur Town(BCWD-2433) & Construction of Post metric boys hostel, LIngadahalli, Tiptur Town(BCWD-2432) Tumkur District
Providing irrigation facility by drilling Borewell to the land of 1.Venkateshmurthy Y.V. s/o late Venkatachalaiah yalagalvadi village of Huthridurgha hobli,2.Narasimhaiah w/o Narasanayka Kaggalapura village in Amrutturu Hobli,Kunigal Taluk Tumkur District.
Providing Irrigation Facility by Drilling Borewell to the Land of Jayaramu s/o late Yajamana Venkataramanappa Girinagara village in Kasaba Hobli, Kunigal Taluk Tumkur District.(Reserved for Scheduled Tribe Contractor)
Providing Irrigation Facility by Drilling Borewell to the Land of Ramaiah s/o Hanumanthiah, Beguru Dasarahalli Village, Dodderi Hobli in Madhugiri Taluk. (Reserved for ST Contractor)
Providing Irrigation Facility to Drilling Borewell of land in 1) Kariyanna S/o Ramanayaka of Chikkagula Village in Kallambella Hobli, 2) Pandurangappa S/o Ranganayaka of Panjiganahalli Village, 3) Mallikarjunaiah S/o Obanayaka of Emmerahalli Village in Kasaba Hobli, 4) Obalesha S/o late B.R Chikkarangappa of Baraguru Village, 5) Neelamma W/o Late Siddalingaiah of Nagenahalli Village, 6) Jayaramaiah S/o Kempaiah of Mudimadu Village, 7) Darendra H.N S/o Narasimhaiah of Halenahalli Village in Sira Taluk.
Providing irrigation facility by drilling Borewell to the land of 1.Gangappa s/o Chikkapeddanna, Chikkamaluru village,2.Hanumantharayappa s/o Puttasiddappa, Chikkamaluru village,3.K.R Sujatha w/o Hanumanthraya, Kalidevapura village in Madhugiri Taluk. (Reserved for Scheduled Caste Contractor)