Loading…
Loading…
1,929 results • Latest
Providing round the clock essential monitoring of activities during and after commissioning of systems for BTG BOP areas for a period of 260 days for a period from 13 07 2026 to 31 03 2027 or from the date of commencement of work to 31 03 2027 which
Calibration Services - Statutory Testing and Certification of 4 Nos of Safety Valves of Liquid CO2 tank; Pressure; CCOE; Hybrid (detailed in scope of work)
Clearing the Scrub Jungle from Type 3 and 4 Quarters area Compound Wall at Camp 1 Quarters
Hiring of Consultants - Milestone/Deliverable Based - Technology Consultants; Carrying out feasibility study for establishment of 50 to 200 MWh Battery Energy Storage System, BESS, within NTPL site; Yes; Onsite
Civil Maintenance Circle Project 1.15 MLD Capacity Effluent Treatment Plant for Waste Water generated from Boiler, Filtration and DM Section at TTPS
refer tender notice
Stationary Lead-Acid Cellsand Batterieswith Plante Positive Plates Conforming To IS1652 (Q3)
smart forest sticks
Fire Retardant Tarpaulin (Q3)
Custom Bid for Services - 01 no PME shaft locking device proximity sensor to be replaced spares CG supply inway job included removal and fitment of shaft locking system Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Plummer Bearing temperature sensor of PME Aft & Fwd and SME Aft are defective and erratic reading to be renewed alongwith suitable connectors and cables and to be proved Qty 03 Nos Spares CG supply Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Tractors (V3) (Q2)
Short Term Cab & Taxi Hiring Services - Sedan; Local; 40Kms x 5Hrs, Short Term Cab & Taxi Hiring Services - Sedan; Local; 80Kms x 10Hrs, Short Term Cab & Taxi Hiring Services - Sedan; Outstation 24*7; 250Kms x 8Hrs, Short Term Cab & Taxi Hiring Services - Premium SUV; Local; 40Kms x 5Hrs, Short Term Cab & Taxi Hiring Services - Premium SUV; Local; 80Kms x 10Hrs, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation 24*7; 250Kms x 8Hrs
Quenching of fire on coal heaps in the coal yard and smelting coal while stacking and reclaiming dozing operation maintenance of sprinkler water pipe line etc at coal yard pile I II III IV for a period 180 days from the date of commencement of work
Providing round the clock essential monitoring of activities during and after commissioning of systems such as in AHS for AHP and associated equipment etc for a period of 260 days for a period from 13 07 2026 to 31 03 2027 or from the date of commenc
Providing round the clock essential monitoring of activities during and after commissioning of systems such as in MPM for Mill areas and associated equipment etc for a period of 260 days for a period from 13 07 2026 to 31 03 2027 or from the date of
Providing round the clock essential monitoring of activities during and after commissioning of systems such as in ICHP including stacker cum Reclaimer and bulldozers for ICHP and associated equipment for a period of 260 days from 13 07 26 to 31 03 27
EARTH PIPE GI 40 MM DIA 3 MTR LENGTH
Supply of 25mm dia. Moulded M.S. Chain for holding giant Tyre Fender at VOC Wharf, Additional Berth, Coastal Berth and Shallow Draught Berth inside Green Gate at VOCPA
SODA ASH LIGHT, CONFORMING TO IS: 251-1998, IN 50 Kgs GUNNY BAGS as per specification
Windbox" U" Bend Type Expansion Jt Size: 13343 X 12418 X 70 mm, Windbox" L" Type Expansion JointsSize: 1715 X 765 mm
TTPS Mech II BM Unit I Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2025 2026
TTPS Mech II BM Unit I Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2025 2026
TTPS Mech II TM I Unit I Overhauling of HPT IPT control valves and cam shaft assemblies etc during forthcoming overhaul
TTPS Mech II TM I Unit I Overhauling of Steam and Condensate valves flange Gasket renewal and machining of valves yoke bush in main turbine system during forthcoming overhaul
TTPS Mech II BM Unit I Painting of the safety valve exhaust pipes its silencers and CST tank during the overhaul 2025 2026
TTPS Mech II BM Unit I Overhaul of long retractable soot blower LRSB and water wall soot blower during the year 2025 2026
TTPS Mech II TM I Unit I Overhauling of feed water tank deaerator and overhauling of feed water valves, steam condensate valves during forthcoming overhaul
TTPS Mech II TM I Unit I Overhauling of Turbine Lub oil system seal oil system Valves and equipments during forthcoming overhaul
TTPS Mech II BM Unit I Overhauling of wind box and SADC in Boiler during the year 2025 2026
TTPS Mech II TM I Unit I Conducting tube Cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during forthcoming overha
TTPS Mech II BM Unit I Strengthening of Cold reheater coil attachment weld joint in pent house area of Unit I Boiler
Providing Water supply arrangement at Mela street Chettikulam in Chettikulam Village Panchayat in Sathankulam union
Strengthening of World Trade Avenue Roads with rigid pavement including side drain and Parking Yard in VOC Port
Resurfacing of Internal Roads around CISF Quarters including Port Hospital at VOC Port Authority
Custom Bid for Services - Conducting Photometric Field test for Airfield Ground lighting and report submission Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Calibration Services
Ordinary Portland Cement (V3) Conforming to IS 269 for Bulk Buying (Q3) (3 (3 ))
Weighing module 150 lbs for gravemetric feeder.
Reheater Front Bottom Bend 02, 120 Degree bend for Reheater front of circuit 2, REHEATER STRAIGHT TUBE OD 54.00 X 4.00 - SA213T22, Reheater Front Bottom Bend 05
CAUSTIC SODA 48 CONCENTRATION FOR BHEL UDANGUDI
TTPS Mech II AHP Unit I Annual overhauling works Cleaning of Ash Water Pump House Sump during forthcoming overhaul
TTPS Mech II TM I Unit I Inspection Painting Overhauling of condenser cw pipelines hotwells etc during forthcoming overhaul
TTPS Mech II TM I Unit I Overhauling of HP LP by pass valves and CRH NRVs during forthcoming overhaul
TTPS Mech II AHP Painting of Unit I Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during forthcoming overhaul
TTPS Mech II BM Unit I Dismantling the existing seal plates and re erection after rectification works in BAH and overhauling of boiler fill pumps hot well makeup pumps during 2025 2026 overhaul
TTPS Mech II BM Unit I Replacement of wornout corroded structural supports strengthening of weld joints and painting the steel structures of Unit I Boiler roof
TTPS Mech II TM I Unit I Removal of deteriorated cladding over the inner surface of condenser East West cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater
TTPS Mech II AHP Plastering of refractory cement inside Unit I BAH and removal of ash slag and debris from BAH floor and trenches during forthcoming overhaul
TTPS Mech II TM I Unit I Inspection of TG bearings of 210MW LMW design turbine during forthcoming overhaul
TTPS Mech II TM I Unit I Inspection of governing elements Checking H gap MOP float renewal of MOP Bearings if Necessary Overhauling of CVSM Pilot feed back pilot and Intermediate Pilot valves MOP NRV etc during forthcoming overhaul