Loading…
Loading…
2,837 results • Recent activity
TTPS Mech II BM Unit II Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during 2025 2026 overhaul
TTPS Mech II BM Unit II Dismantling the existing seal plates and reerection after rectification works in BAH and overhauling of boiler fill pumps hot well makeup pumps during 2025 2026 overhaul
Rectification by Providing RCC Drain along the South of ESP 4 area from Culvert end to ASPH
Laying 110mm HDPE Pipe Line for Water Supply Distrubution Network With HSC at Kanagasabapathy street in East Zone Ward No39
Remedial measures by Strengthening and Protective Coating in the RCC PSC Structures of Coal Jetty Conveyor System from JT 1E towards West in Short Span 1 and Long Span 2 5 of Conveyor 14 in Red Gate area North Break Water of VOC Port
TTPS Mech II BM Unit II Painting of the safety valve exhaust pipes its silencers and CST tank during the overhaul 2025 2026