Loading…
Loading…
2,846 results • Recent activity
TTPS Mech II TM II Breakdown Periodical Overhauling of Instrument and Service Air Compressor in Units IV V for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM I Unit III Collecting of Coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of TTPS for a period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit I to V Monitoring of water wall soot blowers and Long retractable soot blowers during daily operation in Unit I to V Boilers and retracting the swivel tubes and lance tubes if any stuck up found for a period from 01 04 2026 and u
TTPS ES Circle EM III Fault attending replacing the defective parts and cleaning works in SVL MVL LED TL Fittings and plug points of all areas covered under unit IV and V Except Chimney for the period from 01 04 2026 to 31 03 2027
TTPS ES Circle MRT II Day to day routine Cleaning Maintenance of Control protection panels and testing assistance activities pertaining to Generator Auxiliaries system 230KV Switchyard and MRT II lab Sub Division I MRT II of Unit 4 5 for t
TTPS Operation Circle Chemical Division Operation of Ferrous sulphate pumps for Units 3,4 and 5 and the Operation of Phosphate, Morpholine and Hydrazine dozing pumps for Unit 3 on round the clock basis for the period from 01.04.2026 to 31.03.2027