Loading…
Loading…
2,846 results • Recent activity
SUPPLY, DISMANTLING, ERECTION, TESTING AND COMMISSIONING OF CONSTANT LOAD HANGER ASSEMBLY CLH 2257 and 193 MODEL INCLUSIVE OF TIE RODS AND TURN BUCKLES FOR CRITICAL STEAM PIPE LINES IN UNIT V BOILER
TTPS Operation Circle MPM I Unit III Upkeepment of R.C. feeders and attending to shear pin renewal works for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors cable trays in Unit IV V for a period of twelve months from 01 04 2026 to 31 03 2027
TTPS Operation Circle CAD ACWPH I Inspection, checking of supply and return pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at Auxiliary Cooling Water Pump House-I by recording the parameters
TTPS Operation Circle MPM I Unit III Attending to certain preventive and breakdown maintenance works in coal mills, RC feeders Hot, cold and seal air system of mills for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III Operation and routine cleaning of lift car landing gates and doing rescue operation of Freight cum Passenger lift in Unit IV V Boiler area for the period from 01 04 2026 to 31 03 2027