Loading…
Loading…
2,849 results • Recent activity
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2026 and upto 31 03 2027
TTPS Operation Circle CAD CWPH I Unit I, II and III Upkeepment and Operation of storm water treatment plant equipments for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle OE II Breakdown Maintenance of fire hydrant, Mulsifyre, MVWS system and sprinkler system of pipelines in unit I to V for the period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III Charges for cleaning the outer surface of 415 Volt Boiler side LT Motors in Unit IV V for the period from 01 04 2026 to 31 03 2027
TTPS ES Circle MRT I Part of maintenance works related to controls protection in Unit I II III pertaining to Sub division II of MRT Division 1 for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle CAD ACWPH Unit III Cleaning of Louvers of fan less cooling tower for the period from 01.04.2026 to 31.03.2027