Loading
Loading…
Loading…
2,833 results • Recent activity
CHP-I-Replacement of damaged GI conduit pipes, wirings, junction boxes in the lighting system by the new conduit pipes, wires and flame proof lighting junction boxes in Conveyor-19
ECHP-I- Replacement of 580 mtrs. Length worn out belt by a second hand belt of 1400mm width belt in Conveyor-19
ECHP-I-Replacement of 196 mtrs. length worn out belt by a second hand belt of 1800mm width belt in the Conveyor-47
ICHP- Renewal of 1400mm width conveyor belt in boom conveyor of Reclaimer-I machine with the available SH belt.
Clearing the Juliflora Jungle on the South side of Raw Water Pump House at TTPS
SUPPLY OF FLANGE MOUNTED HELICAL GEARED MOTOR WITH EMITTING RAPPING GEAR BOX FOR UNIT IV and V ESP