Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
917 results • Latest
Repair and maintenance work on Nangal Santokhgarh Polian Jaijon road Km 0/0 to 17/400 SH C/o Nallah at RD 12/960
Construction of Entry Gate HP State Boundary on Tahliwal Bathri road Tehsil Haroli Distt.Una Deposit work
AR and MO on Gondpur to Jandoh Kudet road km 000 to 3400 SH Repair of Pot holes in km 1500 to 2800 at various RDs Under MMSRRY 202526
Heavy Vehicle Driving Simulator (MHA) (Q3)
Restoration of rain damages on Bharwain Chintpurni Talwara road km 000 to 15310 MDR42 SH Const of Retaining wall at RD 7155 to 7185 8105 to 8140 11840 to 11855 LHS and 11860 to 11878 Under PDNA2023
Restoration of rain damages on Bharwain Chintpurni Talwara road km 000 to 15310 MDR42 SH CO Retaining wall at RD 7155 to 7170 and CO additional Pushta for existing Retaining wall and CC berms at RD 9645 Under PDNA2023
Sample weighted thief and sampling winder
Restoration and reconstruction of link road Hira Nagar Dagrani Tobba to main road Dulehar via Ravi Dass Mandir Dulehar Upperla Km.0/00 to 2/00 SH C/O R/wall RD 0/720 to 0/736 LHS and edge wall RD 0/775 to 0/800 BHS and C/O CC pavement RD 0/635 to
Drilling, lowering of assembly development of 1 No. 125 mm dia borewell ( Mini T/well 5 dia) 90 mtrs deep for drinking facility to baba Bharthari Mandir at Jungle Khad in Tehsil Haroli Distt. Una(HP) under CRF
Name of Work.Construction of Community Centre (Panchayat Ghar)G P Amlehar , Dev. Block Nadaun . Distt Hamirpur (H.P.)(SH. Building Portion Civil work and W.S. and S.I. ) (Based on H.P.S.R. 2020).
Construction of 120mtr span bridge at Rampur on Una Santoshgarh road at RD.1.760 in Distt. Una (SH General Arrangement Drawings Structural design of substructure and superstructu
Construction of 120 mtr. span bridge at Rampur on Una Santoshgarh road at RD.1.760 in Distt. Una (SH Preparation of Hydraulic data and soil bearing capacity for construction of bridge)
Repair and Maintenance of Existing create wall from RD 8200/13150 to 13250 on left side of Chatara Khad on left bank of Swan River in Village Chatara Khas).
AMC/CMC of Fire Detection, Fire Alarm, Fire Hydrant and Sprinkler System
Restoration of Rain Damages of LWSS Malahat Bharolian to Protect the Existing OHSR 310 KL Capacity Near Indira Stadium (Una Collage) in Tehsil and Distt . Una (HP)
Tender for outsourcing the Job of Annual Operation and Maintenance of 33/11kV Sub-Station Samoor under Electrical Division, HPSEBL, Una through Licensed CLASS-A Electrical Contractor.
Tender for outsourcing the Job of Annual Operation and Maintenance of 33/11kV Sub-Station Sohari under Electrical Division, HPSEBL, Amb through Licensed CLASS-A Electrical Contractor.
LABOUR WORK AT PADDY PROCUREMENT CENTRE TAKRLA DISTT UNA HP
LABOUR WORK AT PADDY PROCUREMENT CENTRE RAMPUR
LABOUR WORK AT PADDY PROCUREMENT CENTRE TAHLIWAL DISTT UNA HP
C/O wire Crated wall/ Gabion wall including wire create apron etc. from RD 8200/11600 to 8200/11825 on left side of Chatara Khad to protect the cultivated land and abadies in village Chatara in Gilbadi Mohalla).
RRD on link road Kalu Di Bar to Bharobar Km 000 to 5000 SH PL 80mm thick interlocking paver block in Km 1300 to 1385
RRD on NH 70 to village Duhki road Km 000 to 6000 SH Co Rwall at RD 1500 to 1555 under MMSY
Const of ambulance road from Thana Kalan Tiar road to house of Sh Puran Chand Kishan Chand Vijay Kumar and others in Chakrola village GP Katoh KM 000 to 0600 SH PL GSB 60mm thick CC interlocking paver blocks from RD 000 to 0140 under MMSY
Const of ambulance road from Ambehra Harot road to Abadi Puman Ram Gulzari Lal Ashok Kumar and others in Kuthera Jattan village GP Ambehra Dheeraj KM 000 to 1500 SH PL GSB 80mm thick CC interlocking paver block at RD 000 to 0038 0934 to 0990 and 0690
SDF 2025 381 RO Repair Of Repair of Restoration of Rain damages on NMT to Saluri road Km 000 to 2300 Construction of Crate work in Km 2200 to 2220 and 2250 to 2270 and CC drain GP Dhussara
Const of ambulance road MR to SC basti Abadi Hoshiar Singh Kharyalta Block Bangana Distt Una SH PL GSB 80mm thick CC interlocking paver block at various RDs 120mtr between Km 000 to 0800 and Const of Retaining wall at RD 0098 to 0107 under MMSY
R.R.D. on various roads Under HP.PWD Sub-Division Bangana
SH- Repair of Pot Holes under Section Bangana-II) (Under OFC Head)
Procurement of Specialized Digital Manufacturing Machinery for Bamboo 4-Axis CNC & UV Digital
SH Construction of 1.20 MLD Sewage Treatment Plant (STP), Sewerage Network, and Allied Civil Works
Repair of restoration of rain damages of internal road Green Avenue Colony Rakkar Tehsil and Distt.Una (SH Laying of CC Paver blocks in various internal road Mohal Tabba (Deposit work)
Repair and Maintenance of link road to Bharolian Khurd Distt.Una km.0.0 to 1.810(SH Providing and erecting crash barrier at RD.0.940 to 1.0) (Under OFC deposit)
Imp. of College infrastructure at SDWG Govt. college Beetan Tehsil Haroli Distt.Una SH C/o U-shape drain around the main building Deposit work
C/o link road to the house of Sh.Subhash Chand W.No.9 Ispur GP Ispur SH P/L Paver block and C/o R/wall-RHS, B/wall-LHS at RD 0/00 to 0/112 under MMSY
Restoration and re-construction of sampark marg to the H/o Smt. Parminder Kaur W/o Sh.Balkar Singh WNO.9 GP Badhera SH C/o B/wall Length 68.00 mtr under MMSY
Restoration of Rain damages to LWSS Saloh in Tehsil Haroli Distt. Una (HP) (SH Construction of OHSR 60000 ltrs capacity with 15 mtrs staging height at Village Saloh (Mohalla Padheyan)
Internet Bandwidth and Replication Service - Leased Line( Point to Point); Goverment Service provider, Private Service provider; Class A; Internatioinal long distance ( ILD ); 1024
Repair of Health and Wellness Centre HWC Andora in Tehsil Amb Distt Una Repair to plaster in patches Plinth protection Repair of door window shutter flooring sanitary work etc Deposit work
Construction of Mini Sectt. building Una Distt. Una H.P (SH - Providing Maintenance, Repair, Operations, upkeep of electrical system thereof)
Construction of Sewage Treatment Plant Capacity 0.50 MLD and Sewer Network with Allied Civil Work) (Under Used Water Management Component under SBM (U) 2.0).
Supply of Electrical Shock Resistant Safety Shoes in various sub-divisions working under Operation Circle, HPSEBL, Una under CEOHZ, HPSEBL, Hamirpur
Supply of LT Distribution Panel Box for 100kVA in various sub-divisions working under Operation Circle, HPSEBL, Una under CEOHZ, HPSEBL, Hamirpur
C/O Link Road to Village Sihana Km. 0/000 to 1/500.
SH Formation cutting in km. 0/410 to 0/440 , R/Wall and Interlocking paver block in km. 0/410 to 0/610) under MNP
C/o 01 No. type-IV residence quarter for Executive Engineer Bilaspur Division No. II, HPPWD, Bilaspur Distt. Bilaspur (H.P) (SH- Providing E.I. therein)
Estimate for Construction of Retaining wall for protection Near H/o Sh. Ramesh Chand S/o Sh. Avtar Singh Lalsingi Under Municipal Corporation Una HP
Construction of Retaining Wall for Protection of Plot of Sh. Kainth in Himuda Colony, Rakkar under Municipal Corporation Una (H.P.)
Construction of Drain along Back Side of Bus Adda near Takka Road under Municipal Corporation Una (H.P.)
Construction of Paver Block Road from Smt. Sheetal to Sh. Umesh, Lower Aryanla under Municipal Corporation Una (H.P.)