Loading…
Loading…
170 results • Latest
Renovation of Toilet Outside of different wards (09 Blocks) at District Jail, Vaishali (Hajipur) for the year 2025-26
RO Plantwith Gensetand Trolley (Q3)
RO Plantwith Gensetand Trolley (Q3)
INSTALLATION, SUPPLY, TESTING AND COMMISSIONING OF FIRE FIGHTING WORKS AT DIFFERENT COURT BUILDINGS AT HAJIPUR, VAISHALI.
RO Plant with Genset and Trolley (Q3) (3 (3 ))
Construction of Pcc Road from vaishali purani chimni to rama singh khet house in ward 3
BR-36R-240
Wooden Block of hard and Dry wood (Babool)of size 24 ''X 6''X 6'' with fine finished surface and all edges champered by 5 mm wooden block should be free Knot.
RO Plant with Genset and Trolley (Q3) (3 (3 ))
RO Plant with Genset and Trolley (Q3) (3 (3 ))
Allin One PC (V2) (Q2)
ICEEXPERT--NEW UNIVERSAL R O SYSTEM Storage Type Drinking Water Cooler of Cooling Capacity - 120 litre/hour Brand: ICEEXPERT--NEW UNIVERSAL R O SYSTEM (Detailed Description/Specification as per Produc
Clothing hanger of length 35 centimeter Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687730007215 dt.16/09/2026)
Monthly Basis Cab & Taxi Hiring Services - Premium Sedan; 3000 km x 640 hours; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 km x 24 hours; Outstation 24*7
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3) (3 (3 ))
Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3), Sanitary Napkins Vending Machines (Q3) (3 (3 ))
Rate Contract for Providing Comprehensive Operation and Maintenance Services in GAs for Saran and Vaishali Districts (Group B)
Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Others, Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor and Outdoor
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Watch and Ward
nal jal work new connection in ward 8
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Gram Panchayat Harparsad; Gym Equipments, Supply and Installation of Open Gym Equipment at Gram Panchayat 12 nos.; Service Provider
Construction of pcc road from md sadik house to md mokit house in ward 1
Construction of pcc road from md firoz aam bagan to deepak ram house in ward 10
Construction of pcc road from rambabu house to yogi brahm sthan in ward 11
Construction of hume pipe drain from md jamshed house to abdul sattar house in ward 14
nal jal work new connection in ward 9
nal jal work new connection in ward 5
Construction of pcc road from ramlalit ray house lekha singh land in ward 4
Monthly Basis Cab & Taxi Hiring Services - SUV; 4500 KM Per Vehicle Per Month; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 KM Per Vehicle Per Month; Outstation 24*7
Modular Piano Type Domestic Electrical Sockets ISIMarked To IS1293 (Q2)
Handling, Transport and Other Mining Services - Percentage quote based - HTC AT PWS BELKUNDA
Housekeeping Material
CONSTRUCTION OF 100 BEDDED GIRLS HOSTEL AT GIRLS I.T.I CAMPUS, HAJIPUR, VAISHALI
Allin One PC (V2) (Q2)
Unitary Air Conditioner (Window AC) (V3) ISIMarkedto IS1391 (Part1) (Q2)
Interactive Panel and Internet connectivity
RO Plantwith Gensetand Trolley (Q3)
Canteen Service - Best Price on Fixed Menu Rate Model - Vegetarian, Non-Vegetarian; Breakfast, Lunch, Dinner, Snacks, Beverages; Inside Building Premises (exclusive for employees/patients/in house personnel)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Digital Blood Pressure Monitor (Q2)
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Outstation
Tricycleor Rickshawfor Carrying Goods (V2) (Q3)
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Under BISScheme-II) (Q2)
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Drinking Water Coolers (V4) ISIMarked To IS1475 (Q2)
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
RO Plantwith Gensetand Trolley (Q3)
Handling, Transport and Other Mining Services - Percentage quote based - HTC AT PWS BELKUNDA
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
RO Plantwith Gensetand Trolley (Q3)