Loading…
Loading…
170 results • Latest
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
RO Plantwith Gensetand Trolley (Q3)
Signage Board (V4) (Q3)
Renovation of Food Distribution Platform/Counter Infront of Different Wards at District Jail, Vaishali (Hajipur) for the Year 2025-26
RO Plantwith Gensetand Trolley (Q3)
Eye Let File kind of Paper kut 24 ounce length 36 cm. Width 24 cm. front paper printed eight eyelet two Patti and three laces with multicolour IR logo. (Item description updated on 10/02/26)
RO Plant with Genset and Trolley (Q3)
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
RO Plantwith Gensetand Trolley (Q3)
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Foot Plate Arrangement to RDSO'S SK.-99057, item No.9 to 18 & 20, Alt. No-2 (Two)
RO Plantwith Gensetand Trolley (Q3)
AMC/CMC of Fire Extinguishers - FOOD CORPORATION OF INDIA, DIVISIONAL OFFICE, HAJIPUR; ABC TYPE, HAJIPUR; WATER CO2 TYPE
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid Number : GEM/2026/B/7129720 Dated : 20-01-2026 Bid Document 1/19 Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Air Walker/Stroller - Outdoor Gym Equipment Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid Number : GEM/2025/B/6673904 Dated : 11-09-2025 Bid Document 1/18 -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Air Walker/Stroller - Outdoor Gym Equipment Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6673920 Dated : 11-09-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Plastic Chairs For General Purposes conforming to IS 13713 (V3) (Q2) ( PAC Only ) (3 (3 ))
Facility Management Services - LumpSum Based - Malpur Panchayat, Vaishali, Bihar (843114); The Library Tender Includes The Supply Of 3 Tables 7 Chairs 1 Desktop Table 1 Inverter 1 Bookshelf And 1 Set Of Books; Cost of consumable to be reimbursed to s..
Custom Bid for Services - Annual Maintenance Contract with replacement of spares for LPG Pipe Lines, Burners & Gas Banks Similar Category Maintenance and Pigging Service for Oil and Gas Pipelines Operation And Maintenance Of Gas Compressor Station
PMGSY-PDLP/25-26 Daudnagar/01
CIVIL, MECHANICAL AND ELECTRICAL WORKS AT NRO HARIHARPUR, VAISHALI
Annual Maintenance Service - Desktops, Laptops and Peripherals - Desktop PC; hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Desktop PC; Acer, Annual Maintenance Service - Desktops, Laptops and Peripherals - Desktop PC; Dell, Annual Maintenance Service - Desktops, Laptops and Peripherals - All In One PC; hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Printer (Monochrome, Laser, Composite Cartridge ); hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Printer (Monochrome, Laser, Composite Cartridge ); Samsung, Annual Maintenance Service - Desktops, Laptops and Peripherals - Printer (Monochrome, Laser, Composite Cartridge ); Lexmak, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Offline 600-650 VA); Microtek, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Offline 600-650 VA); Uniline, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Offline 600-650 VA); MicroPower, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Offline 600-650 VA); General, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Offline 600-650 VA); Emerson, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Offline 600-650 VA); BPE, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Offline 600-650 VA); Super Nova
Handling, Transport and Other Mining Services - Percentage quote based - Ad Hoc HTC at PWS Sarai
BENLO 40 Watt, LED Batten Light Brand: BENLO (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687721763708 dt.22/05/2026)
AMC/CMC of Fire Extinguishers - Institutional; WATER CO2, AMC/CMC of Fire Extinguishers - Institutional; Carbon Dioxide Fire Extinguisher, AMC/CMC of Fire Extinguishers - Institutional; DCP TYPE, AMC/CMC of Fire Extinguishers - Institutional; M FOAM TYPE, AMC/CMC of Fire Extinguishers - Institutional; ABC TYPE
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid Number : GEM/2025/B/6997570 Dated : 12-12-2025 Bid Document 1/18 Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Air Walker/Stroller - Outdoor Gym Equipment Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid Number : GEM/2025/B/6736989 Dated : 27-09-2025 Bid Document 1/18 Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Air Walker/Stroller - Outdoor Gym Equipment Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)
RO Plant with Genset and Trolley (Q3)
RO Plant with Genset and Trolley (Q3) (3 (3 ))
RO Plant with Genset and Trolley (Q3) (3 (3 ))
RO Plant with Genset and Trolley (Q3) (3 (3 ))
Name of The Work: - Construction of Office Building for Assistant Engineer at P.H Sub Division, Mahua (Including Civil Works, PHE works, Electrification works, Site Development & Procurement of furnitures & furnishing) in district Vaishali under P.H. Division, Hajipur for the year 2025-2026.
Name of The Work: - Construction of Office Building for Assistant Engineer at P.H Sub Division, Patepur (Including Civil Works, PHE works, Electrification works, Site Development & Procurement of furnitures & furnishing) in district Vaishali under P.H. Division, Hajipur for the year 2025-2026.
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6737041 Dated : 27-09-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Crossfit Fan (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2)
Construction work of main drain from Dakbungla to Rambalak Chowk in Nagar Parishad, Hajipur .
Professional Painting Service - Walls; Interior Walls; NA
Steelite Star Steel Clothes 18-locker type Type Brand: Steelite Star (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687732517749 dt.26/05/2026)
Gifa Photon LED Rope Light 2835 IP65 (18Mtr.)
Revolving Chair (V5) (Q2), Sofa (V3) (Q2), Computer Table (V3) (Q2), Executive Table (V4) (Q2), Chair for General Purpose (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2) (3 (3 ))
Construction Of 1 No. Closed Shed (50?x30?), 1 No. Open Platform (50? X 30?), Boundary Wall, Pcc Approach Road, Area Development And Wiring For Existing Closed Shed At Divisional Store, Hajipur Under Civil Division, Hajipur.
Financial Advisory Services - Onsite; Financial Modelling
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Development of campus and repair of toilet block and other misc civil work at Hajipur HO under Vaishali Division