Loading…
Loading…
146 results • Latest
SMET- TLGP sec: Provision of rail barricading along the track at road running parallel to track, cattle crossing and heavy trespassing locations for length of 7.390kms. (km.86/000-400 RH, 86/700-87/200 RH, 93/100-200 RH, 102/450- 103/100 LH, 111/800-112/500 RH, 118/500-600 RH, 122/600 - 900 LH, 124/100- 200 LH, 124/640-690 LH&RH, 125/900-126/040 RH, 126/400-650 LH, 128/000-250 LH,128/100-200 RH, 128/700-800 RH, 136/800-900 LH&RH, 155/600-156/000 RH, 156/100-400 RH, 157/300-400 LH, 158/000-159/300 LH&RH).
SW-I : ADEN/SKLR Sub Div:- Construction of Boundary Wall along the track approaches of HAS & SBHR stations for a length of 1500mtrs. SW-II : MYS-Y - Construction of Side drain - 2180m (Km.104/000- 104/07, 111/04- 111/700,119/100-199/400, 121/300-121/600, 122/700-127/900 DN line, 128/700- 128/900 LH & RH, 116/450-116/700 B/W UP & DN ) SW-III - MYS-Y - Construction of Side drain - 1630m (Km.106/630-107/000-UP, 114/100-114/380-DN, 116/400- 114/600-DN, 116/900-117/100-DN, 117/260-117/500-UP, 130/700-131/040-DN ) SW-IV - MYS-HLN Improvements to cess at scattered locations SW-V - ADEN-MYS subdivision- Improvements to cess in MYS-CMNR section at scattered locations
Supply of Pocket Tyre Defect Gauge along with Calibration Certificate Make/Brand:- CEE PEE or PRASAD ENGINEERING or Similar.
Hand Gloves, Class-4 with working voltage of 36000 volt made from 100% ultra pure natural rubber, smooth finish inside and outside, high dielectric characteristics as per IEC: 60903:2014 standards along with test certificate. as per Drg.No. IEC: 60903:2014
Repair to duty huts, toilet at level crossings, Improvement of L-xings by replacing worn out CC Pavers, Repairs to road surface of road approaches along with speed breakers, Signages, Safety Fencing, Painting of Lifting Barriers, Height Gauges, Provision of retro reflective tape on Height Gauges, Booms of Lifting Barries etc in the section of ADEN/PNP.
Improvement of L-xings by replacing worn out CC Pavers, Repairs to road surface of road approaches along with speed breakers, Signages, Safety Fencing, Painting of Lifting Barriers, Height Gauges, Provision of retro reflective tape on Height Gauges, Booms of Lifting Barries etc in the section of ADEN/KUN