Facility Management Services - LumpSum Based - ELECTRIFICATION WORKS (INTERNAL WIRING & DISTRIBUTION BOARDS) FOR ECO-TOURISM DEVELOPMENT AT KIRIBURU, SASANGDA FOREST RANGE, SARANDA FOREST DIVISION; O&M of Electrical Work, O&M for Electronics Work, EX..
Facility Management Services - LumpSum Based - EXECUTION OF HVAC WORKS SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MODULAR VRF/VRV AIR COOLED OUTDOOR UNITS, AND ALLIED WORKSIN SASANGDA FOREST RANGE UNDER SARANDA FOREST DIVISION; EXECUTION OF H..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - EXECUTION OF HVAC WORKS INCLUDING SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL VENTILATION SYSTEM, COPPER & UPVC PIPING WORK, GSS DUCTING & AIR DISTRIBU..
Operation and Maintenance of Effluent/Sewage Treatment Plant - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 30 KLD CAPACITY SEWAGE TREATMENT PLANT (MBBR TECHNOLOGY) AND ALLIED WORKS IN SASANGDA FOREST RANGE UNDER SARANDA FOREST DIVISION..
Facility Management Services - LumpSum Based - EXECUTION OF PLUMBING SYSTEM WORKS INCLUDING SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF COMPOSITE PIPES, SUBMERSIBLE SUMP PUMPS, AND ALLIED WORKS IN SASANGDA FOREST RANGE UNDER SARANDA FOREST D..
Facility Management Services - LumpSum Based - EXECUTION OF PLUMBING, SANITARY, WATER SUPPLY AND RAIN WATER HARVESTING WORKS FOR PROPOSED ECO- TOURISM AT KIRIBURU IN SASANGDA FOREST RANGE UNDER SARANDA FOREST DIVISION; EXECUTION OF PLUMBING, ..
Grease No. 0, Graphited (V2) Conforming to IS 408 (Q3)
Running Contract for Sodium Chloride 3%, 100 ml Glass Bottle.
Running Contract for Tab/Cap. Dienogest 2 mg. in strip Packing.
Running Contract for Calcitonin Nasal Spray 200 I.U / Puff, Total Content minimum 2800 I.U
Selection of Agency for Supply, Installation and Comprehensive Maintenance of Water Cooler Cum Purifier Storage in Government Educational Institutes,Health Institutes,Government Offices on Rate Contract Basis in West Singhbhum, Chaibasa, Government
Fittings and Fish Plates for Rep and Maint of Railway Track
(i) Replacement of existing FOB having intermediate trestle by new one at Rourkela, Garposh, Dhutra, Bagdehi and Kansbahal under the jurisdiction of Sr. DEN/West/CKP. (ii) Civil Engineering work in connection with provision of 01 No. lift at Central FOB of Jharsuguda station
Augmentation of water supply arrangement at Adityapur (ADTP) Railway Station (2nd Call).
Additional Work of Phase-I for development of RRP (Rairangpur) station under ABSS.
Construction of Faecal Sludge Treatment Plant (FSTP) of Capacity 15 KLD at Chakradharpur Nagar Parishad and Operation and Maintenance of FSTP for 5 years
Improvement of MOU Yard, JRA Yard, BUL Yard & BZR Yard under the jurisdiction of DEN/Central/CKP
Improvement of TUX Yard under the jurisdiction of DEN/Central/CKP
Improvement of staff quarters by providing individual OH Tank, Pipe Line, Floor Tiles and other misc. works under the jurisdiction of ADEN/Sett/CKP (2nd Call)
(I) Constrution of 02 units type II quarters at Bahalda Road. (II) Renovation of Qtr. No. 462/1-16 for hostel purpose at MDDTI TATA.
Construction of retaining wall at location no. 266 Gantry A, Gantry B and Gantry C (three gantry column) of 132kV D/C CBSA1 MNP Transmission line crossing under 400kV PGCIL Transmission line under the jurisdiction of TSD, Goilkera
Custom Bidfor Services-Supportfor PPC E&LHRDC KIOM
Axle Oil (V2) Conforming to IS 1628 (Q2)
Construction of passenger platform in DN Grid to eliminate UP Main cum DN loop facility.
Electrical (G) works in connection with the Construction of Officer's Rest House at Dangoaposi.
Balance work for (I) Chakradharpur Division - 35197 Meter of Cess Repair work between TATA-OND and OND-BMPR under the Jurisdiction of Sr.DEN(East)/CKP. (II) Cutting of cess, repairing of cess and construction of side drain between section TATA - ASB under jurisdiction of ADEN/I/TATA (III)Cutting of Cess, repairing of cess and construction of side drain under jurisdiction of ADEN-II-TATA.
Execution of AT weld for 60Kg 90UTS and 60kg/60E1,R-260 grade rail joints for various Track works by supplying RDSO approved AT weld portions with supervision of welding works as per latest RDSO Guidelines under jurisdiction of Sr. DEN(East)/CKP of Chakradharpur division.
FILE FLAT WITH METAL CLIP INSIDE etc.
Diversion and Shifting of Telecom cables for construction of New SSP at Adityapur Station.
Supply of 2V 200AH LMLA Secondary Cell etc.
Supply of 2V 80AH LMLA Secondary Cell etc.
Procurement of GL-18 (Departmental Ledger).
Custom Bid for Services - Hiring of 1 MT loading capacity Mahindra Bolero Camper Gold Zx or equivalent truck for carrying railway materials over the jurisdiction of SSE PSI CKP for two years under Sr DEE TRD CKP Similar Category Goods Transport Service – Per KM Based Service
Custom Bid for Services - Hiring of 4point5 MT capacity truck Make & Model SWARAJ MAZDA Limited SARTAZ HG 72 BS IV 3335 Eicher 10point75 E2 PLUS 3515 or equivalent for carrying railway men and materials over the jurisdiction of SSE OHE BNDM for two Similar Category Goods Transport Service – Per KM Based Service
7/8" (22.22 mm) dia. Zinc plated/Galvanized Lock Bolt with collar
1/2" (12.70 mm) Dia. & 7/8"(22.2 mm ) Dia. Zinc plated/Galvanized Lock Bolt with collar
S&T works in connection with Extension of Line No-4 at Barbil Station.
S&T work in connection with Construction of long Loop Line at UP side and one sick siding of 70 M length at Dharuadih.
Construction of 12 units type II quarters in replacement of condemned quarters. [Maluka (MLKA) - 6 Units & Kendposi (KNPS) - 6 Units].
Chakradharpur-Rourkela - TSR (P) - 35.665 TKM & Bondamunda JN- Barsuan - TSR (P) - 11.100 TKM by TRT (2nd Call)
Brake Beam Complete for BOXNS Wagon
3/4" (19.05 mm) dia. and 5/8" (15.88 mm) dia. Zinc plated/Galvanized Lock Bolt with collar
Bondamunda-Barsuan - TSR (P) -23.984 TKM and Tatanagar Jn- Rourkela (UP) - TSR (P) - 17.000 TKM by TRT (2nd Call)
S&T works for Extension of short CSR Line No.1 and 2 and one Loop Line to 3rd Line at Rajkharswan.
S&T work in connection with Construction of TRT siding at Bamra.
BOWL LINER OF SECONDARY CRUSHER AS PER DRAWING NO. : SAIL/RMD/CMC/MIOM/OPP/221, MATERIAL: MN STEEL IS
Self Ballasted LED Lamps (LED Bulb) Conforming to IS 16102 (Part 2) (V3) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2), LED Batten Light (LED Tube Light) (V2) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Q2) 3 3