Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
9,700 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
9,700 results • Latest
PHE
Horizontal road crossing by trenchless method along CN Road(PWD) for NASIBPUR pwss under Chandannagar Sub-Division,Hooghly Division P.H.E. Dte.
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall for KUMURSA Piped Water Supply Scheme underARAMBAGH Sub-Division of Hooghly Division, P.H.E. Dte.
PHE
Sinking of 2 Nos. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of 2nos. switch-room and boundary wall for KOTA Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division, P.H.E. Dte.
PHE
Sinking of 2 Nos. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of 2nos. switch-room and boundary wall for RAGHUBATI Piped Water Supply Scheme underARAMBAGH Sub-Division of Hooghly Division
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall for OLIPUR ZONE-II Piped Water Supply Scheme under Chandannagar Sub-Division of Hooghly DivisioN.
PHE
Land Developing at Head Work site and 2nd Tube well site for Augmentation of Bathuary (Zone-II) Water Supply Scheme within Egra-II Block under Digha Sub-Division of Tamluk Division, PHE Dte, Purba Medinipur.
PHE
MS structure for canel crossing, NH road boring with casing and concrete piller for Laying distribution system and rising main pipe line at Erasole Water Supply Scheme under Tamluk Sub-Division of Tamluk Division, PHE Dte.
PHE
Laying distribution pipe line due to damaged by the construction of connecting Road,to Accommodate balance FHTC (290 Nos) with allied work for Mukundapur Piped Water Supply Scheme within Ramnagar-I Block under Digha Sub-Division of Tamluk Div
PHE
Land Developing at Head Work site and 2nd Tube well site for Augmentation of Bathuary (Zone-III) Water Supply Scheme within Egra-II Block under Digha Sub-Division of Tamluk Division, PHE Dte, Purba Medinipur.
PHE
Drum Sheet walling , left out pipe line, road restoration, Accommodate FHTC (27 Nos) and others allied works under JJM for Uttar Gopalpur Its Adjoining Mouzas Water Supply Scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Divin
PHE
Ground water based Urddhabmal Water Supply Scheme by providing Construction of Pump House, Boundary Wall, Laying of Rising main, Laying of Distribution pipe line and FHTC (260 nos) work within Sutahata Dev. Block under Haldia Sub Division of TD
PHE
Repairing of OHR, Pump House no 1, Pump House No. 2 under JJM with allied work of Sankarpur PWSS within Contai-III Block under Contai Sub-Division of Tamluk Division, PHE Dte.
PHE
Providing and Installation of Submersible pumping Machineries at newly sunk Ground Water Based boosting Tube Well No 4 and other allied works at Belera Piped Water Supply Scheme under Bolpur Mechanical Division Block Mayureswar II
PHE
Withdrawing and lowering of Submersible Pumping Machinery and other allied work and repairing of high lift pumping machineries of Rosa and Adjoining mouzas water supply scheme under Bolpur Mechanical Division P H E Dte
PHE
Supply and delivery of different electrical accessories at Khagra Piped water supply scheme under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of Electrical accessories for Augmentation of Nagari water supply scheme Block Suri I under Bolpur Mechanical Division PHE Dte
PHE
Dismantling and supplying fitting fixing concentring grade wire and barbed wire at the top of the newly boundry wall and painting weather coat inside and outside of boundary wall at the office premise of the Executive Engineer campus under Bolpur M
PHE
Repairing and replacement of Yard lighting accessories and other allied works at Tarapith Sewerage Development Project Area Block Rampurhat II under Bolpur Mechanical Division P H E Dte
PHE
Supply and delivery of UPVC Column pipes at store for Bajitpur water supply scheme under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of different electrical accessories at Routgara Piped water supply scheme under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of different electrical accessories at Loba Piped water supply scheme under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of Sub Mersible Pump Controllers for Hasan water supply scheme Block Rampurhat II under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of Main Swich, Change over switch,Busbar for Hasan water supply scheme Block Suri I under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of 80mm dia Column Pipe for Augmentation of Nagari water supply scheme (Block Suri I under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of Sluice Valve and Non Return Valve for Gaytha water supply scheme Block Rampurhat II under Bolpur Mechanical Division PHE Dte
PHE
Making collector line connection with CWR and allied works related with delivery pipe line at Bandirban Water Supply Scheme Block Suri I under Bolpur Mechanical Division PHED
PHE
Supply and delivery of UPVC Column pipes at store for Sahapur water supply scheme under Bolpur Mechanical Division PHE Dte
PHE
Supply delivery and fitting fixing of Yard Lighting Luminaries accessories for Shaspur water supply scheme Block Rampurhat II under Bolpur Mechanical Division PHE Dte
PHE
Supply and Delivery of Sub Mersible Pump Controllers for Routgara water supply scheme under Bolpur Mechanical Division PHE Dte
PHE
Providing and Installation of Submersible pumping Machineries at newly sunk Ground Water Based boosting Tube Well No 3 and other allied works at Beja Piped Water Supply Scheme under Bolpur Mechanical Division Block -Mayureswar II
PHE
Supply and delivery of Electrical accessories ie Main switch change over switch etc for Augmentation of Margram water supply scheme Block Rampurhat II under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of openwell submersible pumping machinery for Bajitpur Piped water supply scheme under Bolpur Mechanical Division PHE Dte
PHE
Supply and delivery of submersible Pumping Machineries and cable at Khagra Piped water supply scheme under Bolpur Mechanical Division PHE Dte
PWD
Emergent Repair for Column and Beam of 8th floor in front of lift of office block at City Civil Court Building Kolkata 700001 during the year 2024 2025
PUBLIC WORKS DEPARTMENT
Upkeepment of electrical and allied installation with provision of materials and manpower at Dr. B.N. Bose Sub-Divisional Hospital with allied area, North 24 Parganas- Day to day operation of 03 nos. Bed-Cum-Passenger Lift (03 Shift) for 3 years.
PHE
Rate quotation of different items for implementation of SCADA system at WTP, Boosting Station and all OHR sites (Existing and Proposed) of Surface Water-Based Piped Water Supply Scheme, Northern Sector, Part-I at Kaliganj in the District of Nadia
Zilla Parishad
Maharashtra Housing and Area Development Authority
Maharashtra Housing and Area Development Authority
Maharashtra Housing and Area Development Authority
Maharashtra Housing and Area Development Authority
Maharashtra Housing and Area Development Authority
Maharashtra Housing and Area Development Authority
Maharashtra Housing and Area Development Authority
SE National Health Mission State Health Society Mumbai
Public Works Region
Public Works Region
Public Works Region
Public Works Region
Public Works Region-Pune
Across all 9,700 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.