Loading…
Loading…
12,147 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
12,147 results • Latest
Tenkila Kamnaru Colony 100 mtr 75 mm HDPE Pipeline installation and house connection work
Set of Overhauling kit items required for LP/ALP seat assembly of AC electric locomotive consisting of 10 items as follows. 1)Lead screw & bush. Qty/set. = 01 no. 2)Rotating stopper pin. Qty/set. = 01 no. 3)Big spring. Qty/set. = 01 no. 4)Connecting bush. Qty/set. = 01 no. 5)Handle knob. Qty/set. = 01 no. 6)Foot lever welding assembly. Qty/set. = 01 no. 7)Handle assembly. Qty/set. = 01 no. 8)Gear & Gear casing. Qty/set. = 01 No. 9)Lead screw & bracket welding. Qty/set. = 01 No. 10) Split pin 04 x 40. Qty/set. = 01 No. Note: One sample set should be got approved before effecting bulk supply.
Mid Media Activities under SBM 2.0 Package-02
Mid Media Activities under SBM 2.0 Package-01
Puttur CMC Limit ward 11 Construction of footbridge and installation of interlocks on the road Near Sheena Madiwala, Mohan Madiwala, Bhaskar Madiwala, and Chethan Madiwala house toward Chikkaputhur Veerabhadra Temple road and Electric Pole Shifting and installation of streetlights near Chikkaputhur kombettu college road Kushalappa Gowda house.
Top lifting assembly for modified CBC operating handle
Zone 4A Darbe Mareel Kemminje Bedrala Road Ward No 14 24 26 Water pipeline extension work and House Connection work 110mm HDPE Pipeline 550 mtr 75mm HDPE pipeline 100 mtr HSC 40 End Connection 8 Work
Construction of Chavdi and Food and Civil Supplies office (Ghatlodiya Zone) at Ghatlodiya, Ahmedabad. (Consultancy services for Third party inspection, Quality Assurance and Technical Audit (QATA) ) (4th attempt)
Drying of 100MVA Power Transformer-2 APEX Make along with replacement of oil and gasket at 220kV receiving station Chintamani in Chintamani Taluk, Chikkabalapura dist., on Partial Turnkey Basis including supply of all materials, equipment and erection of all materials/ equipments, testing and commissioning on Partial Turnkey Basis
curtain cotton tape of 1 inch etc .