Loading…
Loading…
31,672 results • Latest
Improvements and Special Repairs to Sri Mutyalamma Temple, Kotipalli(V), K Gangavaram(M), Dr.B.R.Ambedkar Konaseema District
Electrification with Street lighting to the Market Yard, Somala of AMC, Somala
Establishment of New Rythu Bazaar in the Market Yard, Srikalahasti of AMC, Srikalahasti in Tirupathi District
Providing External Electrification in the Market Yard, Somala of AMC, Somala
Construction of new Rythu Bazar under flyover with vegetable stalls in three (3) spans and parking slots in two (2) spans at Rajampeta
Improvements to Ayacut Road towards Maisuramma temple near K. Bollavaram (V) Gadivernula (M) Nandyal District
Improvements to Ayacut road towards Sale Pullaiah fields near Durvesi (V), Gadivemula (M), Nandyal District
Improvements to Ayacut Road towards Donga rasta near K.Bollavaram (V) Gadivemula (M) Nandyal District
Improvements to Ayacut road towards Boyini Nagendra fields near K. Bollavaram (V) Gadivermula (M) Nandyal District
Item No.2 - Improvements to the Inspection Path of Left Side Canal Bank from KM 14.000 to KM 17.960 of NSIC near Macherla (V), Macherla (M)
Item No.5 - Improvements to the Earth Bund from KM 27.820 to KM 29.990 of Buggavagu Balancing Reservoir
Item No.6 - Essential Repairs and protection arrangements to the UT at KM.35.515 of NSJC near Syamarajapuram (V), Durgi (M)
Construction of Multipurpose Hall near Yanamadala Ramaswamy Choultry at Appanaveedu (V) of Pedapadu (M) Estimate cost. Rs.40.00 Lakhs (MPLADS)
Main Work:- Rehabilitation & Upgradation of existing road to 4-lane with paved shoulders from Km 0/000 to Km 56/500 (Muddanur to B.Kothapalli of NH-716G in the State ofAndhra Pradesh on EPC mode under Annual Plan 2021-22 Sub-Work:- Providing Hire vehicle to the Executive Engineer (R&B) NH Division, Kadapa from 01-06-2026 TO 30.05.2027 (12 Months) for inspecting of the works in (R&B) NH Division, Kadapa from 01.06.2026 to 30.05.2027 (12 Months).
PROVIDING RED EARTH,KERB WALL AND LIGHTING TO ETUKURU WALKING TRACK IN DIV NO:16 UNDER AE-15 SECTION
Temporary Restoration to Gotuvarikandriga Tank bund and OT Sluices, in Gotuvarikandriga Village Limits in Nellore Rural Mandal of SPSR Nellore District.
Temporary Restoration to Donthali Small Tank Bund, Field Channels, Feeder Channels and Surplus Course Channels in Donthali Village Limits in Nellore Rural Mandal of SPSR Nellore District.
FDR-10/2025- Temporary Restoration for Damages to Leburu Channel Right side near Allipuram Village in Nellore Rural Mandal of SPSR Nellore Dist
Replacement of the existing 160mm dia deteriorated stoneware sewer line with 200mm dia PVC-U sewer line is proposed at various locations of MVP Colony Sector-2 in Ward No.18, East Zone of GVMC, under A.E-16 Section.
Supply and delivery of new tyres, tubes, flaps to 18 Cmt tipper public health sanitation vehicle of Bheemunipatnam Zone of GVMC
Providing Flooring for rooms and passage to Office Building at Sri Chowdeswari Devatha Devasthanam, Nandavaram(V), Banaganapalli(M), Nandyal District.
Providing Paintings to Office Building of Sri Chowdeswari Devatha Devasthanam, Nandavaram(V), Banaganapalli(M), Nandyal District.
Renewal of BT roads by hot mix process at Old ACB Office road, Doctors Colony in ward no 15 of East Zone, GVMC
Single Phase Solar Smart Meters
Supply and providing 1 No new truck for Sanitation purpose in PH section of Pedana Municipality under General Funds (2nd Call)
Jungle Clearence and Bund Strengthening of Kummari Kunta of Gurapusala Village in Yerragondapalem Mandal of Markapur District 2nd call
Modernization of existing fountain at Rajabapaiah Chowk Est:4,87,000/- Fund: General
Improvements to the road from Km 30/0 to 38/350 of Tadipatri - Bukkapuramu road in Anantapuramu District (2nd Call)
Improvements to the Kalluru - Garladinne road from Km 8/2 to 11/8, Km 18/0 to 23/0 and 30/0 to 34/0 in Anantapuramu District (2nd Call)
Procurement of medicines, surgical items etc. to TBP Hosptial, TB Dam.
Leasing of Project Restaurant opposite to TB Board Official Colony, Main Entrance beside MST Hall in Amaravathi (V), Hosapete (Tq.), Vijayanagara (Dist.) on PPP Model upto 5 years.
Right to collect Vehicle Parking Fee from the tourists visiting TB Dam Right Side Gardens for a period of one year (12 Months).
Leasing shop No.C3/1 beside SBI ATM shop near Open Ground of TB Dam. [For a period of Three years]
Leasing shop No.C2/2 (Middle) Opposite to Open Ground near PU College of TB Dam. [For a period of Three years]
Providing the stall of Novelties and Gift articles at the existing stall near MDF in Japanese Garden, TB Dam.
Leasing shop No.C3/3 beside SBI ATM shop near Open Ground of TB Dam. [For a period of Three years]
Leasing shop No.C2/3 (Towards KV School) Opposite to Open Ground near PU College of TB Dam. [For a period of Three years]
Disposal of Scrap / Unserviceable T & P articles available in Dam Line Section of Estate & HW Sub Division, TB Dam.
Supply and Fixing of Split AC units to Microbiology Lab (IRDL Project) in SP Medical College SVIMS Hospital, Tirupati (Part-B)
Annual Maintenance of State Highway Roads in (R&B) Section, Singanamala for the year 2026-27 (2nd Call)
Erection of new 33KV 14.4MVAR Capacitor bank at 132KV SS N G Palli in Chittoor District under RMI 2022-23
Tranport contract for Transportation of various equipments and other materia from APHMEL , Kondapalli to different destinations of SCCL and SAIL and vice versa