Loading…
Loading…
31,296 results • Latest
Maintenance of State Highways in (R&B) Section, Amalapuram for the year 2026-27
Design, Development and Beautification of various parks & open spaces in GVMC area Madhurawada Zone (package -2).
Providing of Scaffolding for erectioning ornamental designs in AE-1 and 2 section for Navarathri Brahmotsavams-2026 in ESD-South,Tirumala
Supply of overhead water tanks(Drinking water grade)
Construction of RCC Sump in the Existing well for lift irrigation purpose at RARS, Chintapalle
Supply, Delivery loading and unloading of Alumino Ferric (Alum) at Stock room at Head Water Works for the maintenance of Water Supply in Gudivada Municipality Est:9,52,500/- Fund : General
Improvements and Special Repairs to Sri Gowthami Gorakshana Sangham, Rajamahendravaram Town and Mandal East Godavari District
Providing 200mm dia HDPE Drain Pipe line from Jockey Showroom to Maruthi Enclave Apartment in 3rd ward Tadepalli urban under AE-3 section of Mangalgiri Tadepalli Municipal Corporation under Municipal General Funds
Supply & Installation of New 630KVA Transformer at VMRDA-U.B complex Building, Siripuram Visakhapatnam
Supply and delivery of 9 nos of tractors along with hydraulic trucks for the tenali municipality under 15th FC tied grant 2021-22 1st & 2nd installements - (2nd Recall Tender)
Construction of Anganwadi Centre at Pettugodalu Village in Pathakota GP of Hukumpeta Mandal of ASR District Estimate Rs.12.00 Lakhs
Re-Construction of Sri Ramalayam at S.Gollapalli (V), Ramakuppam (M), Chittoor District.
Improvements to the road Beluguppa to Sollapuram road from Km 4/150 to 4/440, 5/330 to 5/430 & 11/500 to 11/650 in Anantapuramu District (2nd Call)
Construction of Drains,Culverts and CC road at Cobaldpet 8/1,8/2 cross roads and Ashok nagar 4/6/1 cross Road under Division number 34 ward in Secretariat number 121 in AE2 section of GMC. (3rd call)
DESILTATION FROM RAILWAY STATION TO CHAKRALAMADUGU VIA KRISHNANAGAR, SV NAGAR, ETC., OF RAJAMPET MUNICIPALITY
Improvements to Riding surface Vaviletipadu -Kamepalli - Kondepi Road (SH-303) from Km.25/0 to 29/0 in Prakasam District Sub-Work:- Providing Inspection Vehicle on hire basis to the Superintending Engineer (R&B) Circle, Ongole for the year 2026-27 i.e., from 07/2026 to 09/2026 (3 Months)
Item No.6 - Essential Repairs and protection arrangements to the UT at KM.35.515 of NSJC near Syamarajapuram (V), Durgi (M)
Providing CC Road and CC Drain at Mahakali Temple Opp. Shop Employees Colony main road and Venkateswara Colony Main Road Connection in Div No.01 Under AE-10 (LB Nagar) Section
Providing of CC Roads at 12th, 13th & 15th wards Cross Roads in Ponnur Municipality.
Raising of Avenue Plantation from Greyhounds Jn. to Boyapalem and Boyapalem to Kapuluppada and Vambay Colony to Cyclone tower (6.8 Km Road and Central Median) during 2026-27
2026-Eng01-01-101 Providing CC Road and CC Drains at Santhapeta area in Ward No.01 Bheemili Zone of GVMC.
Service charges for the work of AME for attending maintenance of electrical works on Activity basis in all the institutions in the jurisdiction of Dy.EE(Elec)-East. Tirupati for the year 2026-27.
Improvements and Special Repairs to Sri Malleswara Swamy Temple, Madduru(V), Kovvuru(M), East Godavari District
Annual maintenance of road Tiruchanoor to Ramanjula circle in Tirupati for the year 2026-27
Maintenance of SH Roads in R&B Section Bhimadole for the year 2026-27 (Package-1)
SUPPLY OF USHA MARTIN MAKE STEEL WIRE ROPE SIZE- 20MM DIA & 18 MM DIA
FDR-2025-Strengthening of Bund Obayapalli Village in Tarlupadu Mandal of Prakasam District.
Repairs and Improvements to MPPS M.Kothuru H/o M.Kothuru GP of Nagari Mandal
Rennovation of Entrance Arch, Main Gate, Compound Wall and Balance Portion CC Road at Hindu Buriel Ground, Kummar Bazar in Div No.04 Under AE-7 Section.
Construction of Compound Wall to MPPS Therani H/o Therani GP of Nagari Mandal
Restoration of CC potoholes/ CC Road repair works in 22,23 Wards of Srikalahasti Municipality(5th Call)
Providing 450 CC drains Amaravatt park East and west sides in BR Nagar layout 8th ward of Amadalavalasa Municipality
Improvements and Special Repairs to Sri Venugopala Swamy Temple, Narkedimilli(V), Atreyapuram(M), Dr.B.R.Ambedkar Konaseema District
Construction of Compound wall from rear side of the Girls Dining hall to Gate-II at campus-1, RGUKT-Srikakulam
Improvements & Strengthening of feeder channel from Reddykunta to thumu kunta and allikunta to vasanthanayuni cheruvu near Devarakonda village in Chinnagottigallu mandal of Tirupati District
Restoration of Washed out wall of Eguva Cheruvu near Kasirao Peta (V) in Madanapalle (M) in Annamayya District.Item No.02
Painting of MS Towers with one coat of Red oxide paint and one coat of Aluminium paint in 132kV Piduguralla - Tangeda - Wadapalli DC line from Loc No.1 to 84 in O&M Circle, Guntur in Vijayawada Zone
2026-HOR01-CB-246 Proposals for Gap filling plantation and including maintenance for one year of VERTICAL GARDENS at Sagar Nagar (RHS and LHS Side culvert) and Pedda Rushikonda, Madhurawada zone area
Desillting of drain for Engaging of JCB, Tractors and labours from Venkatareddy Colony to Panchruvu, Kothapalli to Venkatareddy Colony, Kothapalli to masthan Naidu flats and TN Palem H/W Opp to Subregester Colony in Ward No. 01.
Non Perishable Dietary Items and Milk for Dr B R Ambedkar Gurukulams Package III AY 2026 2027
Supply, Delivery and including Loading & Unloading charges of Bowganvilla plants in Guntur Municipal Corporation.
Construction of CC Drain from D.No. 5/1314/557/1 to 5/1314/562/8, in Godavari colony, Ward No.42. in Adoni Municipality under 15th FC 2025-26 (1st Instalment)
Re-Construction of Sri Thirupathi Gangamma Devasthanam Temple at Yanamanasanapalli (V),Kuppam (M), Chittoor (D).
Rejuvenation, Strengthening of Bund by Conducting CC Drain from Goutham Nagar 1st street to Lakeview Colony along Nellore Cheruvu in Division No.35 of NMC Under 15th FCG (2025-26) 1st Installment
Shifting of 33KV CTs from existing VCB structure to proposed cantilever structure on line side TC Towers for 6 Nos 33KV Feeders at 132KV SS Madanapalle in Annamaiah District Under RMI 2024 2025 Scheme
Annual Maintenance of SH's (3 Roads) in (R&B) Section, Vinukonda for the year 2026-27 in Palnadu District
Supply of laminated photos for the period form 01-8-2026 to 31-7-2027
Operation and Maintenance of pipe line network from 26to 30th division for the year 2025-26 in RMC.