Loading…
Loading…
3,110 results • Latest
Construction work including road and drain cover from main road to Ajay Singh's house, ward no. 08
Construction of PCC road and drain along with cover from Ranji's house to Birbalji's house, Ward No. 11
WARD NO 16 ME MD ALLAUDDIN KE GHAR SE MD MUKHTAR KE GHAR TAK PAKKA NALA SAH PCC SADAK NIRMAN KARYA
WARD NO 11 ME BRMHASTHAN MEN ROAD SE MASJID TAK PCC SADAK NIRMAN KARYA
PARTIAL REPAIR WORK OF STRUCTURES BUILT FROM KM 0.00 TO 6.097 KM OF THE HIGH-LEVEL MAIN CANAL.
NAME OF WORK: Repair of 2000 MT capacity TPDS SFC Godown at Kharga Road Danapur , Diast. Patna.
NAME OF WORK: Repair of approach road Building of 500 MT of TPDS SFC Godown at Warun , Dist. Aurangabad.
NAME OF WORK: Repair of approach road for CMR Godown No. 08 ( BDO Residence Campus ) at Block - Haveli kharagpur Dist. Munger.
Name of Work: Repair of Approach Road for 500 MT capacity TPDS SFC Godown at- Navgachhiya Block , District- Bhagalpur
Name of Work: Repair Estimste For 2000 MT Capacity CMR SFC Godown No -03 At-Bagwari Bazar Samiti Block Jagadishpur, Dist-Bhagalpur
Name of Work:-Repair of 500MT TPDS SFC Godown At -Sanhoula Block , Dist-Bhagalpur
NAME OF WORK: Repair of 5000 MT capacity CMR SFC Godown at Arwal block Dist. Arwal .
NAME OF WORK: Repair of 5000 MT capacity TPDS SFC Godown No. 08 at Shahpur block District -Ara(Re-tender)
Name of Work:- Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes, i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. Blocks: All Blocks of Dhaka Division No. of schemes: WLS(Non Quality): - 54 WLS(Quality):- 00 PWS: -12
Construction of 20 Nos. 125mm X 40mm X 61M deep Tube well with I.M.-II Hand Pump, Platform , Drain and Soakpit under State fund scheme for Sinking of New Handpumps for drinking water due to Drought and falling water level in District for the year 2026-27 in Patna District under P.H. Division, Patna West, Patna.
Construction of 2 Female & 8 Male Urinal point in Town Club, Nagar Nigam Madhubani.
CONSTRUCTION OF NEW 85 Nos. 125MM X 40MM DIA X 61M DEEP HAND OPERATED T/WELL WITH INDIA MARK-II HAND PUMP WITH PLATFORM AND DRAIN INCLUDING SOAK PIT OF SIZE 1.0M DIAMETER 2.0 METRE DEEP WITH DRY BRICK HONEY COMB SHAFT WITH BRICKS OF CLASS DESIGNATION 100B FOR HAND PUMP IN PLACE OF OLD DEFUNT/ORDINARY HAND PUMP IN THE WATER SCARES AREAS IN SAMASTIPUR DISTRICT UNDER P.H.DIVISION, SAMASTIPUR FOR THE YEAR 2026-27.
Construction of Piau (water Stand)At Ward 10 in Nagar Parishad Haweli Kharagpur. (Dist-Munger)
Construction of road and drain up to Dr. Vijay Kishore's house via Ward No. 02 Delha Middle School Lane under Gaya Municipal Corporation.
Construction of pink toilet under nagar panchayat kamtaul ahiyari
Request for proposal for selection of agencies for providing outsourced Manpower for performing and managing day to day activities related to sanitation work for Nagar Panchayat KAMTAUL-AHIYARI (DARBHANGA)
Construction of 8m hight RCC Staging and house service connection Near land of Ramchandra prasad in ward no. 09 at Nagar Parishad Kanti. (Re-tender)
CONSTRACTION OF RCC DRAIN FROM CHANDAN RAY HOUSE TO RAILWAY LINE in ward no- 45 AT NAGAR NIGAM MADHUBANI
Design, build, construct, install and commissioning of Material Recovery Facility (MRF) of 50 TPD for Dry Waste along with operation and maintenance of the plant for five years on EPC mode of Nagar Parishad Siwan
CONSTRACTION OF RCC DRAIN & PCC ROAD FROM ARVIND KUMAR HOUSE TO MUNESHWAR YADAV HOUSE in ward no- 18 AT NAGAR NIGAM MADHUBANI
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 16A (Navtoli Tola) .
Renovation of Industries Department Vikas Bhawan
Construction of RCC drain and paver block road from house of Bharat sah via house of Sudarshan mahto up to house of Awadesh mahto in ward. no.45 at Katihar.
Nagar Panchayat, Sursand kshetra antrgat sursand purvi sthith jal minar ka brihad marammti, Pipe Line vitran evm grih Sanyojan Kary.
CONSTRACTION OF RCC DRAIN & PCC ROAD FROM RAM SARNI DEVI HOUSE TO HAULLA SAH HOUSE in ward no- 28 AT NAGAR NIGAM MADHUBANI
CONSTRACTION OF RCC DRAIN & PCC ROAD FROM SAMBHU MANDAL HOUSE TO PRAMOD HOUSE in ward no- 11 AT NAGAR NIGAM MADHUBANI
Construction of P.C.C Road from hanuman mandir to Munni devi house, from Pradip hari house to Surendar paswan house, from soni devi house to babu Kasai house , from Fekani devi house to Kalimandir in ward no-03 at Katihar.
Request For Bids (rfp) For Selection Of Solar Power Developers Through Tariff-based Competitive Bidding For Setting Up Grid-connected Rooftop Solar Projects Of Cumulative Capacity Of 15 Mw, With Individual Plant Capacity Ranging From 1.1 Kw, For Up To 13290 Kutir Jyoti Households In The Bhagalpur Circle Of South Bihar Power Distribution Company Limited (sbpdcl), Under Capex Plus Resco Mode In The Utility-led Aggregation (ula) Model Of The Pm Surya Ghar-muft Bijli Yojana (pmsg-mby).
Nagar Parishad piro antargat Parvez Master ke ghar se badi masjid hote hue raushan sheikh ke ghar ke samne se hote hue parvez master ke pyali factory se mission school ke piche tak naala safai
Nagar parishad Piro antargat paasi tola se hote hue om prakash sah ke ghar hote hue sikas colony eyum bagicha tak nala safai karya
NAGAR PARISHAD ANTARGAT THANA SE HOTE HUE BALIKA UCCH VIDYALAYA SE HOTE HUE RNB SCHOOL SE MONTESSARI SCHOOL TAK NALLA SAFAI KARYA
Request for Proposal for Selection of agency for providing outsourced manpower for performing and managing day to day activities INCLUDING Door to Door Collection & transportation to designated places related to sanitation work for NAGAR PARISHAD PIRO
Desiltation of Nitane Main Canal from 0.00km to 0.60 km along with Construction work of 1 No. Fall at 6.7 Km & 3 Nos. Outlet
CONSTRUCTION OF Dr. A.P.J. ABDUL KALAM RESIDENTIAL SCIENCE SCHOOL AT NARKATIYAGANJ,BETTIAH (WEST CHAMPARAN)
CONSTRUCTION OF Dr. A.P.J. ABDUL KALAM RESIDENTIAL SCIENCE SCHOOL AT DAGARUA,PURNEA.
Jungle Clearance of PLE & PRE under Punpun Flood Protection Division, Patna City
CONSTRUCTION OF NEW 60 Nos. 125MM X 40MM DIA X 61M DEEP HAND OPERATED T/WELL WITH INDIA MARK-II HAND PUMP WITH PLATFORM AND DRAIN INCLUDING SOAK PIT OF SIZE 1.0M DIAMETER 2.0 METRE DEEP WITH DRY BRICK HONEY COMB SHAFT WITH BRICKS OF CLASS DESIGNATION 100B FOR HAND PUMP IN PLACE OF OLD DEFUNT/ORDINARY HAND PUMP IN THE WATER SCARES AREAS IN MADHUBANI DISTRICT UNDER P.H.DIVISION, JHANJHARPUR FOR THE YEAR 2026-27.
Establishment for furnishing of computer Lab in CABT under Bihar Agricultural University, Sabour, Bhagalpur
Selection of Agency for supply of (Food Grains,) for daily use for Prisoners. District Jail Bettiah and Sub Jail Bagaha (Khand K).
Construction of 30 Nos of 125mm dia x 48m deep Gravel Packed Tube well with I.M-II hand pump with construction of 1.85mtrn dia. circular P.C.C (1:2:4) platform and P.C.C (1:2:4) drain as per UNICEF design including 1m dia and 2m deep Soakpit under P.H.Division, Hilsa , district- Nalanda for the year of 2026-27.
REVISION OF MASTER PLAN AND CONCEPT DESIGN AND PREPARATION OF DETAILED DESIGN AND DETAILED PROJECT REPORT FOR THE DEVELOPMENT OF THE VISHNUPAD TEMPLE CORRIDOR DEVELOPMENT IN GAYAJI DISTRICT.
REVISION OF MASTER PLAN AND CONCEPT DESIGN AND PREPARATION OF DETAILED DESIGN and DETAILED PROJECT REPORT (DPR) FOR THE DEVELOPMENT OF THE BABA HARIHARNATH TEMPLE CORRIDOR IN SARAN DISTRICT.
Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes (WLS) with Electric Driven Pumps in Leftout Tola of PRD Panchayat taken over by Panchayati Raj Department in Buxar District of Bihar on turn-key basis with 3 months Trial Run after Completion Period under Mukhmantri Nishchay (Non-Quality Affected) Yojna under P.H. Division, Buxar for the Year 2024-25.
Construction work of a protection wall on the eastern side of the graveyard in Ward No. 05 of Nagar Panchayat Singhia.
Nagar Nigam Sharsa chhetra antargat Saharsa ke Sadar Asptal antargart Nirmit Pahunch Path ka Chaurikaran ewam Samne ke Bhag ka Saundarya karan kary.