Loading…
Loading…
4,430 results • Latest
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF EFFLUENT TREATMENT PLANT (ETP) FOR 50 BEDDED CRITICAL CARE HOSPITAL BLOCKS (CCHB) AT JASHPUR, DISTRICT- JASHPUR (C.G.)
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF EFFLUENT TREATMENT PLANT (ETP) FOR 50 BEDDED CRITICAL CARE HOSPITAL BLOCKS (CCHB) AT KAWARDHA, DISTRICT – KAWARDHA (C.G).
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF EFFLUENT TREATMENT PLANT (ETP) FOR CRITICAL CARE HOSPITAL BLOCKS (CCHB) AT KORBA, DISTRICT – KORBA (C.G).
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF EFFLUENT TREATMENT PLANT (ETP) FOR 50 BEDDED CRITICAL CARE HOSPITAL BLOCKS (CCHB) AT – GARIYABAND (C.G.).
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF EFFLUENT TREATMENT PLANT (ETP) FOR 50 BEDDED CRITICAL CARE HOSPITAL BLOCKS (CCHB) AT - MAHASAMUND, DISTRICT MAHASAMUND (C.G.)
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF EFFLUENT TREATMENT PLANT (ETP) FOR 50 BEDDED CRITICAL CARE HOSPITAL BLOCKS (CCHB) AT BHATAPARA, DISTRICT BALODABAZAR (C.G.)
CONSTRUCTION OF INTEGRATED PUBLIC HEALTH UNIT(IPHL)AT DISTRICT HOSPITAL SARANGARH-BILAIGARH, DISTRICT- SARANGARH-BILAIGARH (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
CONSTRUCTION OF PRIMARY HEALTH CENTER(PHC) MIDMIDA AT BLOCK-PUSSORE, DISTRICT-RAIGARH (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
CONSTRUCTION OF PRIMARY HEALTH CENTER (PHC) NAWAPARA (A) AT BLOCK-PUSSORE, DISTRICT-RAIGARH (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
CONSTRUCTION,REPAIR & UPGRADATION OF URBAN PRIMARY HEALTH CENTER MUNGELI AS HAMAR ASPATL, DISTRICT-MUNGELI (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
CONSTRUCTION OF FIRST AND SECOND FLOOR BUILDING AT DISTRICT OFFICE OF FOOD AND DRUG ADMINISTRATION, DISTRICT-JANJGIR-CHAMPA (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
CONSTRUCTION OF BALANCE OF URBAN HEALTH & WELLNESS CENTER (U-HWC) AT DUMARTALAB, (U-HWC) AT MINIMATA, (U-HWC) AT SADAR BAZAR & BSUP KACHNA AT RAIPUR, DISTRICT-RAIPUR (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LIFT WORK FOR CRITICAL CARE HOSPITAL BLOCKS (CCHB) AT RAIGARH, DISTRICT – RAIGARH (C.G).
Construction Of Auditorium At Ganiyari Ward No. 40
e – Short TENDER FOR THE PURCHASE OF MEDICAL COLLEGE FURNITURE FOR DIRECTORATES OF MEDICAL EDUCATION, GOVERNMENT OF CHHATTISGARH CHHATTISGARH
Construction of RCC Drain Work Work at Ward 08 Sangam Chowk To Sonari Talab.
Construction of CC ROAD Work Work at Ward 06 Ravi Thakur House to Budhawari Para.
Construction of CC ROAD & RRC Drain Work at Ward 04 Jhulelal gali to Ticher Colony.
CONSTRUCTION OF KATKONA MAIN ROAD TO SUNDERPUR LENGTH 3.18 KM. DIST. MCB (C.G.) ¼WORK CODE& W29447½
STRENGTHING WORK OF Kalyanpur-Latori-Datima-Salka road (MDR) in Dist. Surajpur (C.G.) from Km. 1 to 7, 10/2-4, 11 to 12/8, 13/4 to 13/10, 16/2-4, 17/6 to 20/4, 21/2-4-6, 23/8 to 30/4, 36 to 38, 40/10 to 41, 47 to 49 = 29.00 k.m. (Work code – W31654)
Construction of New Livelihood College Building at Sarangarh. i/c W.S.S.F. Electrification & Approach Road Works.
Strengthening of Chhal to Kharsia Road (SH 18) Km. 45/6 to 49/8 (100) Total Length 4.30 Km.
Comprehensive Annual Maintenance contract of Elevators and Escalators in office complex sector 24, Retail Complex and Commercial Complex at sector 21 and Paryawas Bhawan at sector 19 of Nava Raipur Atal Nagar Dist. Raipur(C.G.)”
test abc
Construction of Pree Metric Tribal Boys Hostel Building at Bagudega, Block Lailunga Distt. Raigarh (CG)
Construction of Pree Metric Tribal Boys Hostel Building at Keshla, Block Lailunga Distt. Raigarh (CG)
Construction of Tribal Girls Aashram Building at Bade Dumarpali, Block Kharsia Distt. Raigarh (CG)
ले.अरविन्द दीक्षित वार्ड क्रमंाक 56 अंतर्गत दीपक कालोनी मंे नाली एवं रोड़ निर्माण कार्य।
WMM and BT Patch repair With Emulsion work on various road of Kawardha-Division (Zonal Agency)
W.M.M. &. PATCH REPAIR WITH EMULSION WORK OF VARIOUS ROAD UNDER PWD SUB DIVISION NO. 01 & 02 DURG
W.M.M. & PATCH REPAIR WITH EMULSION WORK OF VARIOUS ROAD UNDER PWD SUB DIVISION NO. 03 DURG & PATAN (Zonal Agency)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING OF RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 01 DURG (Zonal Agency)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING OF INTSIDE RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 02 DURG (Zonal Agency)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING OF OUTSIDE RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 02 DURG (Zonal Agency)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING OF NON RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 02 DURG (Zonal Agency)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING OF NON RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 01 DURG (Zonal Agency)
Special Repair And MOW Work of Non Residential Building Under Under Sub Division NO-03 Durg (Zonal Agency)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING OF NON RESIDENTIAL BUILDING UNDER SUB DIVISION PATAN (Zonal Agency)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING OF NON RESIDENTIAL BUILDING OF JUNWANI SECTION UNDER SUB DIVISION NO - 03, DURG (Zonal Agency)
WAITING HALL IN BALOD DISTRICT FOR THE PEOPLE OF MINERAL AFFECTED AREAS UNDER SUB DIV. NO 01 BALOD
CONSTRUCTION OF OF THEKWADIH TO BOHARDIH ROAD LENGTH = 1.30 KM IN DIST. BALOD I/C BRIDGE & CULVERT
Repair work of Existing Building of Upsanchalak Yojana Sankhayaki Vibhag Durg
Special Repair Work for Bridge/Culvert Under Sub Division Madded.
Annual Repair and Mantenance Work of Under Sub Division Madded.
Annual Repair and Mantenance Work of Bijapur-Awapalli-Basaguda-Jagargunda Road Length = 43.50 Km Under Sub Division No. 2 Bijapur.
Construction of Police Chowki Building at Uparkachchhar, Distt. - Jashpur
Construction of 04 Nos GO’s House (E – Type) Quarter at 3rd Bn. Amleshwar (CAF) Campus Distt. - Durg
Construction of 04 Nos GO’s House (E – Type) Quarter at 8th Bn. Rajnandgaon (CAF) Campus Distt. - Rajnandgaon
Construction of 04 Nos GO’s House (E – Type) Quarter at 13th Bn. Korba (CAF) Campus Distt. - Korba
Construction of 04 Nos GO’s House (E – Type) Quarter at 2nd Bn. Sakari (CAF) Campus Distt. - Bilaspur