Loading…
Loading…
15,275 results • Latest
C/o R/Wall to house of Sh. Ajit Kumar Lamlehar Ward No. 4 (SW- C/o R/Wall)
C o Link road from Kyani to Gedam Gawas km 0 00 to 0 515 SH F C 5 7 mtr wide 0 00 to 0 515
Balance work of link road Band Vihar to Jitender Bhuria House Km 0/00 to 0/500 (SW- CC Pavement Km 0/00 to 0/070 (MC Deposit)
C/O G.I. wire crate work for the protection of Pier and abutment of Gareli Khad Bridge at RD 3/345
Co Link road from Kyani to Gedam Gram Panchyat Gawas km 000 to 200 Sh FC 57 mtr wide road at Rd 0525 to 1555 Deposit work
energization of hand pump at various locations under CRF
A R M O on Nahal Sheetalvan Kalgaon Teer Km RD 0 00 to 1 500 SH Widening of road from RD 0 680 1 500 P L Kharanja stone soling from RD 0 700 to 0 900
RR Damages Syria Nallah Kupri Melthi Kalgaon Teer road km 0 0 6 00 SH C O B Wall at RD 1 160 1 190 cause way at RD 5 570 5 590 with wing wall in PCC 1 3 6 at RD 5 570 5 580
R R Damages on Sariya Nallah Kupri Melthi Road km 0 00 to 6 00 SH C O R Wall at RD5 885 to 5 905 1 705 to 1 720
SH C O R Wall at Rd 0.330 to 0.350 , 0.380 to 0.400 , 0.460 to 0.480
RR Damage to Badiyara Tikkar Diswani Road Km 000 to 700 SH PF W-Metal Beam Crash Barrrier from RD 0215 to 0240 1060 to 1160 2525 to 2585 300 to 3095
Estimate for restoration of plinth area surrounding for protection of CESD office Boileauganj, under City Electrical Division, Shimla-171001
Estimate for RM of HT LT Lines at various location CESD, HPSEBL Idgah under the jurisdiction of this division.
RR Damage to Narkanda Sidhpur Sungari Rohru km 000 to 6700SH Co Rwall at RD 34850 to 34880
SH Protection work of existing pump house
R/R Damages on Various Road Under Bogdhar Sub Division HPPWD Bogdhar (SH Hiring of JCB for removal of Slip)
Estimate for RM of HT LT Lines at various location CESD, HPSEBL,Ridge and CESD Sanjauli under the jurisdiction of this division.
R R damages on Sheelghat ganganagar road RD 0 00 to 28 00 SH C O R Wall at RD 8 420 8 430 9 190 9 200 8 540 8 560 10 300 10 312
R/R Damages on Various Road Baila Section Under HPPWD Sub-Division Dadahu (SH Hiring of JCB for removal of Slip)
Estimate for RM of HT LT Lines at various location CESD, HPSEBL,Boileauganj under the jurisdiction of this division.
R/R Damages on Various Road Under Dadahu Sub Division HPPWD Dadahu (SH Hiring of JCB for removal of Slip)
R/R Damages on Various Road Andheri Section Under HPPWD Sub-Division Sangrah (SH Hiring of JCB for removal of Slip)
R R Damage on Dalgaon Makri Prem Nagar road km 0 00 to 1 500 SH C O R Wall at RD 0 410 0 433 0 355 0 375 0 470 0 493
R/R Damages on Nahan Dadahu Haripurdhar Road Under PIU Sub-Division HPPWD Sangrah (SH Hiring of JCB for removal of Slip)
Restoration of Rain Damages on Danoi Khood Drabil Raod km. 0/00 to 18/945 (SH C/O PCC Retaining Wall from RD. 5/885 to 5/897).
Restoration of Rain Damages on Charna Bhawai Sangrah Raod km. 0/00 to 14/00 (SH C/O PCC Retaining Wall from km. 0/900 to 0/913).
Repair to Pot Holes at RD 9/00 to 10/00 and 13/00 to 15/00
Restoration of Rain Damages on Solan Meenus Raod km. 61/00 to 110/00 (SH C/O PCC Retaining Wall from km. 85/490 to 85/496 and 85/520 to 85/526).
Repair of patch work on Kot to Devidarh road km. 0/00 to 22/500 (SH Repair of patch work at various reaches between km. 0/00 to 22/500) Under MMSRRY
Restoration of Rain Damages on Solan Meenus Raod km. 61/00 to 110/00 (SH C/O PCC Retaining Wall from km. 85/685 to 85/695).
Tender in advance for Repair and Restoration of 33KV HT line 33KV Doble Circuit Bajaura-Thalout,33KV Single circuit Bajaura-Garsa) for upcomming monsoon season for FY 2026 27 in various E sections under ESD HPSEBL Nagwain
CONSTRUCTION OF AMBULANCE ROAD TO MAIN ROAD HARIJAN BASTI VIA BALJEET SINGH HOUSE UPTO KURU ROAD SH C.O CEMENT CONCRETE PAVEMENT AT RD 0.500 TO 0.680 AND U SHAPE DRAIN AT RD 0.700 TO 0.800MMGSY
Restoration of Rain Damages on Nahan dadahu Haripurdhar Road km. 36/00 to 87/00 (SH C/O PCC Retaining Wall from km. 86/840 to 86/850).
Restoration of Rain Damages on Haripurdhar Korag Badol Road km. 0/00 to 11/500 (SH C/O PCC Retaining Wall from km. 4/560 to 4/570).
Restoration of Rain Damages on Gehel Dimaina Barwa Dasakna Road km. 0/00 to 5/390. (SH C/O PCC Retaining Wall from km. 1/450 to 1/465).
Restoration of Rain Damages on Dalyanoo Pullilani Nainidhar Road km. 0/00 to 22/800 SH C/O PCC Breast Wall from km. 6/520 to 6/555).
Construction of link road from Haripur Dosarka to Bhillo Nag Mandir including Sanyala under GP Sherlohara in Km. 0.00 to 1.700 SH ROFD, P.L GSB, and C.O CCP from RD. 0.500 to 1.200 and R.wall, V-shape drain and Edge wall Under MMGSY
SH 5/7 mtr wide F/C between km 0/00 to 0/450
SH P/L Kharanja Stone Soling at RD 0/00 to 0/600
Clearing jungle i/c uprooting of ranks, vegetation, bushes, cleaning of drains from Type-V, Type-IV, Type III, PL colony and All Type-I,II Blocks premises etc. in HPSEBL residential colony complex at Bhabanagar
Annual Repair and maintenance of water Supply system in Municipal Corporation, Solan.
Construction of new 20 users Septic Tank and soak pit,PVC pipe fittings and minor repair to existing toilet etc at HPSEBL Market complex under CMD,Bhabanagar
P/L Granular Sub Base Coarse and Wearing Coat G II and Tarring work in km 0/500
SH Hiring of JCB for removal of slips, shoulder breams and maintenance of road surface, drain etc. and Hiring of Tipper 5.50 cum capacity for carriage of material as and when required
SH C/O B/wall in wire crate at Rd 0/150 to 0/181
SH Construction of R/wall at Rd 8/330 to 8/342.50 and 8/342.50 to 8/365
Removal of slips,muckat sides of drains ,berms, collection pits,and spreading along berms etc and disposal of surplus materila in all kinds of soil and all leads and liftsat Rd00to RD 1500MTRS of HPSEBL colony road under CMD,Bhabanagar
REESTORATION OF RIAN DAMGES ON KALOHA PRAGPUR NEHRAN PUKHAR DHALIARA DADA SIBA ROAD KM 9.00 TO 22.2000 SH PROVIDING AND LAYING 80MM THICK INTERLOCKING PAVER BLOCK AT RD 9.786 TO 9.881
SH Providing and laying interlocking paver block at RD 7.400 to 7.455 and construction of retaining wall at RD 8.050 to 8.075 and 8.100 to 8.130and 8.150 to 8.175 and 9.098 to 9.120 and 9.130 to 9.155 2.00mtr. RCC span culvert at RD 15.550 and
RESTORATIONOF RAIN DAMGES ON UPPER PRAGPUR TO KAROL VIA DADARI ROAD KM 2.00 TO 3.300 SH PROVIDING AND LAYINBG 80MM THICK INTEERLOOCKING PAVEE RBLOCK AT RD 2.220 TO 2.260 2.640 TO 2.690 AND REPAIR OF POT HOLES IN KM 0.00 TO 3.500 VARIOUS RDS PDNA