Loading…
Loading…
28,415 results • Latest
Providing & Laying of Pipeline in SC Colony in Yarehanchinal Village in Kukanoor Taluka.
Cleaning of 03 Villages in Yarehanchinal Village Limit in Kukanoor Taluka.
Hiring of Crane for Maintenance and overhauling of complete Illumination circuits and different type of luminarie fittings of Mysuru Palace, Mysuru
Repairs to 1200 HP HSC Pump No.1 (Sl.No. 1734412015) at pure water pump house kolhar under M&R of Vijayapur city water supply 2025-26.
Repair to Kunnala Primary Health Centre for Tap repair, painting the interior and exterior of the hospital, plumbing repair, laying Churki and waterproofing for roof and residual fencing work in Kunnala village, Kunnal Gram Panchayath in Gubbi Taluk.
a) Construction of BCWD Post Graduate Boys Hostel near CBT at Dharwad Town. b) Construction of BCWD Post Metric Boys Hostel at Jaladarshini, Nagar, Dharwad. c) Construction of BCWD Post Metric Boys Hostel at Navalagunda Dharwad Dist.
Construction work of mens hi-tech toilet behind the Zilla Panchayath Head Office Hall
Establishing-2x5MVA-GIS-Substation-at-K.Perage-Village-at-Madikeri-Taluk-Kodagu-District
Repair Works of Mahatma Gandhi Pre-Graduation College Building in Kunigal Taluk Kunigal Town
Construction of retaining wall and providing revetment for wind row platform embackment and construction of drains at SWM site of CMC ramanagara at Harisandra
DRIVER D GROUP AND DATA OPERATER TENDER
Construction of a godown next to the office of the Deputy Director of Horticulture (RAVA) and construction of steps for the office of the Deputy Director of Horticulture (RAVA), Tumkur, located within the premises of the Joint Director of Horticulture (Z.P.) office, Tumkur.
Construction of a new library room in Turuvekere Taluk Govt. model Boys Senior Primary School, Turuvekere Town
Construction of Work Community Building Antapur Palya Village Chelur Hobali Gubbi Taluk
Repair work on the Government Boys Pre-University College building on B.H. Road, Tumakuru City
Work of providing temporarily decorative illumination to Vishnuvardhan park, Kuvempu park , Bal Gangadhar Tilak park , Sir M. Visvesvaraya Bhavan, Chikka Gadiyara, Tathayya park , Rajkumar park , Town Hall, Statue Park, Government guest house Arch, and MCC Head Office Building on the occasion of Dasara-2026
Installation of an electrical transformer at the solid waste management unit within the limits of Anavatti Town Panchayat.
Design, Supply, Installation, testing and Commissioning of UHT Processing and Bricks Packing Plant at NMPC Kanakapura on Turn key basis.
WATER SUPPLY ITEMS
Tender application form for the supply of equipment under the free improved equipment supply scheme for professional artisans for the year 2026 27 KODAGU DISTRICT
Supply of Water Supply Items to Muthegere Grama panchayath
Supply of Electrical Goods To Muthegere Grama panchayath
Supply of Water Supply Items to Yeliyur Grama panchayath
SUPPLY, INSTALLATION AND COMMISSIONING OF RF BACKEND CONNECTIVITY FOR DMR REPEATER STATION TO CHAMARAJANAGARA CIRCLE AND KODAGU CIRCLE
Annual Maintenance Contract (AMC) for Water Quality Testing Laboratories at Hassan, Arasikere and Holenarsipura Taluks.
Repair of existing 1000LPH water purification plant at Magge Village Magge GP Alur Taluk, Keralapura Village Keralapura GP Arakalagud Taluk, Halebeedu Village Halebeedu GP Belur Taluk, Yaliyuru Village Baladare GP ChannarayapatnaTaluk, Koravangala SC colony Village Koravangala GP Hassan Taluk and Valahalli Village Valahalli GP Sakaleshapura Taluk Hassan District.
Supply of Banana to Shri Vinayaka Shankaranarayana Durgamba Temple, Nandavara, Panemangalore, Bantwal Taluk, Dakshina Kannada
Supply of Coconut to Shri Vinayaka Shankaranarayana Durgamba Temple, Nandavara, Panemangalore, Bantwal Taluk, Dakshina Kannada
COMPREHENSIVE MAINTAINANCE OF STP AND ETP PLANT OF WENLOCK DISTRICT HOSPITAL MANGALORE
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Tammenahalli to Doddakari in Bangarpet range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Dodduru Karpanahalli to Tammenahalli in Bangarpet range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Siddanahalli to Margallu in Bangarpet range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Naganattapura to Siddanahalli in Bangarpet range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Kodnrahalli to Vardenahalli in Malur range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Maragallu to Dodduru Karpanahalli in Bangarpet range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Anepura to Vadaderi in Malur range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Vardenahalli to Anepura in Malur range during 2026-27 (5.50km)
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Gangapura to Kondarahalli in Malur range during 2026-27 (5.50km)
Annual Maintenance of Birur-Shimshige road at ch 0.00 to 6.00 km in kadur taluk.
Annual Maintenance of Halaguru (NH 209) to Kowdle (SH 84) Joining Road via Halaguru, K Belluru, Rudrakshipura, Madduru, Koppa, Kowdle (SH 186) Ch14.97 to 63.36km for the year 2026-27 in Maddur taluk
Annual maintenance for the year 2026-27 for the Road from S.A road to join Melukote road via Guddenahalli from Ch 0.00 to 3.50 km in K.R.Pete taluk
Annual maintenance for the year 2026-27 for the state Highway connecting Srirangapattana Arasikere Road ch 24.18 to 60.50 km SH-7 in K.R.Pete Taluk
Annual maintenance of the Road From NH-209 to join SH-33 via Malavalli Town from Ch.0.00 km to 1.36 km for the year 2026-27 in Malvalli Taluk, Mandya District
Annual maintenance of the SH-84 to join SH-33 via , Bheemanahalli, Dugganahalli,Madahalli from Ch.0.00 km to 14.40 km for the year 2026-27 in Malvalli Taluk, Mandya District.
Annual maintenance of the Sulthan road to join SH-84 via Aaladahalli, Markalu,Kodenakoppalu from Ch.0.00 km to 5.15 km for the year 2026-27 in Malvalli Taluk, Mandya District
Annual maintenance of Hosahalli - Belakavadi Road from Ch 0.00 km to 4.40 km for the year 2026-27 in Malvalli Taluk, Mandya District
Annual maintenance of Koratagere-Bavali road (SH-33) from Ch 132.69 km to 154.77 km and Link Road for the year 2026-27 in Malvalli Taluk, Mandya District
Providing House keeping works in 3rd stage East & west wings (2nd and 3rd gate), 4th gate and 5th gate floors, extenal cleaning of concrete path ways, premisses and passages, External Sweeping of Double road from M.S.Building 5th Stage to Vidhana Soudha West Gate and other allied works at M.S. Building premises, Bengaluru. Period from (01/08/2026 to 31/07/2027)
Installation of interior electrical works in MRF site at Mundaru area of Bajpe Village in bajpe Town Panchayath limit
Estimate for Raising of Monsoon Plantation at NHAI Bangalore to Chennai Expressway (NH-7) with 14x20 pbs 300 Plants and 10x16 pbs 600 plants in two rows for Doddakari to Rayasandra in Bangarpet range during 2026-27 (5.50km)