Loading…
Loading…
6,534 live4,905 closing this weekmost from Local Self Government Department and PWD
Published at etenders.kerala.gov.in, Kerala's official e-procurement portal.
6,534 results • Latest
Cutting and disposal of standing trees for establishment of industrial unit at KINFRA Food Processing Industrial Park, Adoor
Maintenance of Streetlight, lowmast ,highmast light
Annual Plan-KURUMATHUR GPPROVIDING TARRING WORKS TO PANAKKAD PADINJARU STREET NUMBER 3 ROAD(FROM CH 0/000 TO CH 0/120 KM)- PROJ.177/26-27-General Civil Work
General- Court Varkala Construction of Toilet Block for Munsiff Court Varkala Thiruvananthapuram Civil work
chalakkal para side road retarring
MAINTENANCE OF PATTAYAMKAVALA JIO NAGAR ROAD WARD 13
Vayal mtce works at areas under Peria Forest Section in Peria Range
MAINTENANCE OF PAZHUKKAKULAM KALLUKANDAM ROAD
Annual Plan-EDAYUR GRAMAPANCHAYATH 2023-24 PROJECT NO. 244/24-RENOVATION OF MAYINPADI ANGANWADI CENTER NO16
PROVIDING CONCRETE WORKS TO PERUMBA AMBALAM ROAD-PROJ.NO.337/2026-27
E TENDER FOR THE SUPPLY OF DESKTOP COMPUTER FOR ERCMPU LTD
Vayal mtce works at Hariland vayal under Peria Range
PROVIDING RETARRING WORKS TO KUNDOOLADU SHANDHIGRAMAM ROAD -PROJ.NO.33/26-27 CH 0/000 TO 0/155 KM
Vayal mtce works at areas under Kunhome Forest Station in Peria Range
MINI WATER SUPPLY SCHEME AT KOOLAMOOCHI, WARD-08 IN MELARCODE GRAMA PANCHAYATH IN PALAKKAD DISTRICT UNDER DEPOSIT SCHEME
Renovation of the Fully climatic station at Malankara
GENERAL-Budget 2023-24 (20)- Substitution- Amended Works in Azhikkode LAC-Improvements to Kottali kaavu - Ambedkar Samsarika Nilayam - Athazhakunnu Road-General Civil Work-Azhikkode LAC
mosco nagar anganwadi road retarring
Tholur pishariyekkal road retarring
PROVIDING CONCRETE SLAB ON DRAINAGE IN VARADOOL THRICHAMBARAM ROAD PROJ.NO.102/26-27 (IN B/W CH 0/000 to 0/100
EOI FOR SUPPLY OF ELECTRICAL AND MECHANICAL COMPONENTS FOR DOL MOTOR STARTERS
KUNDUKOALAKE BEACH HIGHMASS LIGHT INSTALLATION AT KUNDUKOLAKE BEACH MANJESHWAR GRAMA PANCHAYAT
GENERAL-CONSTRUCTION OF CULTURAL CENTRE,MUNDAKAYAM GRAMA PANCHAYATH PHASE II TOPOGRAPHIC SURVEY AND SOIL INVESTIGATION PART TS-Investigation works-Investigation Work-1-DEPOSIT
GENERAL-GUPS Mechal-Contingency Assistance of Sustenance of School Infrastructure-General Civil Work
Supply, Installation, Testing and Commissioning of Lithium-Ion Battery Bank with 30 Minutes Backup for the Existing 20 kVA/20 kW UPS including Buy-Back of Existing Old Batteries in the GF Admin Block in NUALS Campus
The estimate for the proposed construction of the Pilgrim Tourism Center at Thiruvizha Mahadeva Temple, Alappuzha has been prepared based on the Administrative Sanction accorded by the Tourism Department.