Loading…
Loading…
24,014 results • Latest
Renovation of Gurabadi minor at tail end of Daha Irrigation Project for the year 2026-27.
Renovation to Laxmibandha MIP under Critical grant in Athagarh Block of Kataka District for the Year 2026-27.
Nangalbod to Akhadabhatta_Road_SDBC_0.500 to 5.000
Building
Tahasil office building at Jagannathprasad_building
Provision of Three Phase power supply to 400kVA at 33kV load of DHH Phulbani Buildings.
Const. of Additional Classroom at Banabhuin H/S under Nilagiri Block
RD Road to Mahulpadar _Road_Pothole repair, Flank dressing, raincut filling, CD painting0.000 to 2.000
REPAIR AND REHABILITATION OF ELECTRICAL INSTALLATIONS WORK TO ADMINISTRATIVE BUILDING OF CHIEF CONSTRUCTION ENGINEER, ANANDAPUR BARRAGE PROJECT AT SALAPADA IN THE DISTRICT OF KEONJHAR.
PWD Road to Junapani_Road_Potholes repair, PMC and Seal Coat_0.000 to 0.400
Renovation of Ripitipalli Sub-minor at tail end of Daha Irrigation Project for the year 2026-27.
Improvement to Rajabandha CD in Tangi-choudwar Block of Kataka District under Improvement To Check Dam Scheme for the year 26-27.
Provision of Three Phase power supply to 235kVA at 33kV load of MCH Phulbani Buildings.
S/R to Qtr.No. 3RB/28 at Ankuli Such as fixing of GCI Sheet tile flooring etc. completed at Berhampur for the year 2025-26 building
Constriction of retaining wall with garland drain and barbed wire fencing at hill top of Daitari iron ore mines in the district of Keonjhar.
Development work at Telugu Burial Crematorium at Satichoura in Ward No.6.
Improvement to Digimahara CD in Tangi-choudwar Block of Kataka District under Improvement To Check Dam Scheme for the year 26-27.
Repair and Renovation of GNM Hostel at Phulbani. (Part-2) Buildings.
Repair and restoration of Toilet infront of Biswanath Pandit Library in Ward No.36.
Construction of approach road from main road (Link road) to Biswanath Pandit Libraray in Ward No.36.
Const. of Dormitories at Tenda GHS under Nilagiri Block
Renovation of Agajhola Sub-minor at tail end of Daha Irrigation Project for the year 2026-27.
Renovation of Mangalabag SUH at Mallha Sahi in Ward No.34.
Improvement to Nahakabandha CD in Tangi-choudwar Block of Kataka District under Improvement To Check Dam Scheme for the year 26-27.
S/R to Judicial Residential Qtr.no. 2RB at Komapali R.C Das lane at Berhampur for the year 2025-26 such as providing alluminium sliding, brick work mosquito jally and MS Sheet door building
Construction / Beautification work of road side vacant area from Appolo pharmacy shop to Ashok Electrical shop at LIC colony Bombay Inn in road Jobra in Ward No.40.
Renovation of main canal with CD at RD 30810 m and at RD 30630 m of Daha Right Distributary of Daha Irrigation Project for the year 2026-27.
Babandha to Bahandei Road with Bridge_Road_GSB, BM , WMM and SDBC_0.000 to 2.000
RD Road Jn to Tentuliguda __SDBC, Berm Filling,Toe Wall 30 mtr, HPC 1000 dia single row0.000 to 0.700, 0.470 to 0.500 At 0.480 km
Construction of new sales road parallel to existing road for Weigh Bridge - 09,02, 06 and sales road for Parking Plaza entry at Baliparbat Stack yard of Daitari iron ore mines in the district of Keonjhar
Renovation to Chamundapallia MIP (RES) under Critical grant in Narasinghpur Block of Kataka District for the Year 2026-27.
Const. of Adivasi Sanskruti Bhawan at Nilagiri
Desilting of MSWC-I from Chhatra Bazar culvert to Nityananda Hospital in Ward No.36.
Renovation of Kanteipalli feeding channel and Dubulunda feeding channel of Daha Right Distributary of Daha Irrigation Project for the year 2026-27.
Construction of Kaduadora Check Dam in Tureikela Block of Balangir District Under The scheme MATY 3.0 for the year 2026-27
Renovation of Mudulipalli feeding channel of Daha Right Distributary of Daha Irrigation Project for the year 2026-27.
Renovation of main canal with CD at RD 21300 m of Daha Right Distributary of Daha Irrigation Project for the year 2026-27.
Construction of Tambipadar Check Dam in Khaprakhol Block of Balangir District Under The scheme MATY 3.0 for the year 2026-27
Construction of Jhankarpali Check Dam in Khaprakhol Block of Balangir District Under The scheme MATY 3.0 for the year 2026-27
Construction of Guard wall to Sakhigopal Branch Canal in between RD 32.490Km. to 34.540Km
Construction of road from Sindhikaguda to Badani under MMSY-Connecting Missing Road Links (MMSY-CMRL) in the Districts of Nabarangpur for the year 2025-26
Construction of road from NH-26 to Sandaibhata under MMSY-Connecting Missing Road Links (MMSY-CMRL) in the Districts of Nabarangpur for the year 2025-26
Construction of Boilapari to Tekguda in the District of Malkangiri under Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27.
Construction of Chedenga to Jabaguda in the dist of Malkangiri under Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27
Construction of Cover slab from Kailash Bhol house to Udala Bandha in Ward No-11
Earthwork,Concrete
Construction of Cover slab from Adibasi Padia to Electric Structure Both Side to Udala Bandha in Ward No-12
Earthwork,WBM,Turfing
Construction of Banipadar Chowk to Siunguda Via Dhundubeda Road in the District of Nabarangpur under MMSY Transferred Road Improvement Programme (MMSY-TRIP) for the year 2024-25.
Repair of Road (Paver Road) from PWD road to Arun Mohanty House in Ward No-01