Loading…
Loading…
3,085 results • Latest
Construction of PCC Flooring with gravel spreading and drainage system in the switch yard area of existing 220kv s/s katorewala to cease weed growth
Construction of Rain water recharging cum Silt detention and Crate wire structures in Village Surewal Khatana Khad Rajgiri Khad Bathlor Jathwarh Under Sub Division Nurpur Bedi Tehsil Shri Anandpur Sahib District Roopnagar
Providing and installation of Fire Fighting and Fire Detection System for Gap Analysis at District Hospital Mukatsar Sahib
Special Repair and Upgradation of Olympian Balbir Singh senior International Hockey Stadium at Mohali
Repair of Boosting Station at Canal, SS Tank No.2, Filter Beds 8.22 m dia 3 No., 9.50m dia 1 No., HLT 8.22 m dia, CWT 8.22 m dia, Pump Chamber 6.10 x 4.88, Pipe Line at Head Works, Pumping Machinery and all other works contingent there to.
REPAIR OF LINK ROAD BBM ROAD TO RAMPURA SALABATPURA ROAD VIA GANDHI BASTI