Loading…
Loading…
5,227 results • Latest
HIRING OF ONE MARUTI VEHICLE (preferably Wagon-R, Celerio having commercial registration/permit) FOR OFFICIAL USE
patch Soling, WBM, grouting, PMC, sand seal coat, drain etc.
Internal electrification work for newly constructed 100 seated Working women Hostel at Belonia under R.D. Santirbazar Division, during the year-2025-26
Supply, Installation, Commissioning of 4 nos. Jetski (Personal WaterCraft-PWC) for use in water sports along with Annual Maintenance Contract of 5 years, at Damboor Lake, Gondatwissa Sub Division,Tripura.
Construction of Cultural shed at Simanta Kalibari of Sarasima under Hrishyamukh RD Block (PWD SoR-2023)
patch Soling, WBM, grouting, PMC, sand seal coat, drain etc.
patch Soling, WBM, grouting, PMC, sand seal coat, drain etc.
INTERNAL ELECTRIFICATION
Construction of Vatsalya Sadan (50 seated) Childred Home, CWC and (50 seated) Observation Home, Special Home, Place of Safety and JJB at Thakurcherra, Jolaibari under RD Santirbazar Division during FY 2026-27
Flat brick soling, brick edging, patch carpeting, potholes repair, brick drain mtc. and other allied works etc.
Maintenance of road from Bridhyanagar (Opposite to AIR Station) to Howrah foot bridge up to newly constructed work under the jurisdiction of Khayerpur Sub-Division, PWD(R and B) during the year 2026-27
Development of road from Ranirbazar cattle market to PHC chowmuhani (Total length - 0.81 Km) under 10-Majlishpur Assembly Constituency SH Grouting, metalling , re-carpetting, seal coat..(L 0.40 km, from Ch.0.00 km to Ch.0.40 km) (Gr-I)
CONSTRUCTION WORK
Construction of Kayadhepa Sub Centre under Bishalgarh RD Block, Sepahijala District, Tripura during the financial year 2026-27. (PWD SoR 2023).
GCI Sheet roofing, Half Brick walling up-to sill level and pucca floor.
Maintenance
Maintenance
Establishment of Agar International Trade and Research Center for Promoting Trade and Research in the Agarwood Sector Tripura on EPC basis
Construction of Paver block road with drain from Raju Das to Subal Debnath House,at ward no-7 under Jirania Nagar Panchayat.
Construction of Paver block road towards Harej Mia House,at ward no-1 under Jirania Nagar Panchayat.
Construction of Paver block road with drain from Existing NH08 to Under Construction NH08 Byepass via Baishya Para,at ward no-11 under Jirania Nagar Panchayat.
Supply and Installation of Hostel Furniture at Forest Training Institute Hatipara for upgradation of Training Institute Infrastructure under ELEMENT Project
Construction of Paver block road from the H/O Sudhir Das to Haralal Das House,at ward no-4 under Jirania Nagar Panchayat.
Construction
Construction of masonry drain and construction of RCC Slabs at various location of Ward No_03 UMC_UDP_2026_27 Total Length 150.00 m.
Construction of Paver block road from the H/O Jiban Dey to Sricharan Das House,at ward no-4 under Jirania Nagar Panchayat.
Construction of Paver block road from Subashnagar PWD Road to Shankar Goala House at Block Chowmuhani,at ward no-6 under Jirania Nagar Panchayat.
Construction of Paver block road from the H/O Ajoy Kr Chowdhury to Bijoy Chakraborty House,at ward no-4 under Jirania Nagar Panchayat.
Supplying Installation and commissioning of air Conditioning System at Forest Training Institute Hatipara for Upgradation of Training Institute Infrastructure under ELEMENT Project
Construction of Paver Block road including Protection wall at various locations under the Ward No_03 UMC_UDP_2026_27. Length of P wall 150.00 m and length of Paver Block road 150.00 m
Development and construction of road and drain work under AMC Ward No.39.
Protection work and road side pucca drain etc
CONSTRUCTION OF OFFICE BUILDING FOR EEXCUTIVE ENGINEER, RD GONDATWISA DIVISION DURING
Patch WBM, Grouting, Re-carpeting and seal coating etc.
Patch WBM, Grouting, Re-carpeting , seal coating etc
Construction of RCC drain from near Suman Karmakar house to Laxman Karmakar house at Puranpally under Bishalgarh Municipal Council. W/No - 7
Patch WBM, Grouting, Re-carpeting , seal coating, protection work and road side pucca drain etc
Construction of CC road from near Sadhan Shil house to Ranjan Shil house under Bishalgarh Municipal Council. W/No - 7
Construction
Cleaning of underground sump,RCC Over Head Tank and PVC water storage tank at blood bank,DRTB Centre,College Building,NTH-1,NTH-2,New Super Speciality Block,Old Building,Joyanti Block,Medicine Block,Eye Block,Mortuary,Boys and Boys Intern Hostel,
Construction
Repairs and Maintenance of different units of PG Hostel at AGMC and GBP Hospital, Agartala, during the FY - 2026-2027(2nd call).
Development of primary rural market at Karamcherra Market under Chamanu Agri sub Division ,Karamcherra, Longtharaivelly, Dhalai, Tripura SH Providing Internal Electrification
Construction of drain and road at MBB Club road Loknath Bari gali under ward no 21 AMC
Const of new cc road at started from HO Makhan Dey to H.O Paresh Ghosh at Rajdhanagar under ward no 09 AMC
Construction of CC road from Pintu Roy house to Sajal Saha house under Bishalgarh Municipal Council. W. No 7
Construction of Market at Sachindra Nagar Phase II at Majlishpur under Jirania Agri Sub Division.
Construction of new cc road drain and slab started from HO Manindra Das to H O Rekha Malakar at Adarsha colony under ward no 29 AMC
Construction of CC road incliding including wall and RCC drain from near Dipankar Bhowmik house to Karmakarpara road via Biswajit Saha house at West Laxmibill under Bishalgarh Municipal Council. W/No - 6
Construction of CC road from Dilip Paul house to near Dipankar Baidya house at Shitaltilla under Bishalgarh Municipal Council. Ward No 03