Loading…
Loading…
5,182 results • Latest
Road development of Road from KMA Road to Daspara under West Balaram GP (L-2.40 Km)/ SH- Grouting, WBM-III, Re-carpeting, Construction of wing wall by CC Block laying etc from chainage 1.40 Km to 2.40 Km.
Deployment of truck for drinking water supply with polytheen storage tank in different pockets spots habitation under 15th FC/RWS fund within the jurisdiction of Jampui Hill RD Block under DWS SubDivision Kanchanpur during the year 2026 27 Gr I
Patch repairing, Patch carpeting, Protection work through CC Blocks placing and allied works etc
SH Lifting and lowering of submersible pump motor Rewinding and repairing of different types of pump motor etc and all allied works within the jurisdiction of Jampui Hill RD Block under DWS SubDivision Kanchanpur
Roof Grading, Water proofing treatment etc
SH Extension and maintenance of distribution pipeline at Shantipur Nabajay Para Rajmohan Para Sukramani Para and purbahalam Para under Laljuri RD Block area with other allied works under DWS SubDivision Kanchanpur during the year 2026-27 Gr II
S.H Urgent maintenance replacement of Stolen electrical items foot valve etc of different M.I Schemes under Kamalpur Sub-Division 2nd phase.
Road development work of road from KA Road near Kulai Baazar to KA Road at Basudebpara via Harinmara (Length-4.00 Km)/ SH- Protection work of Road by RCC retaining wall, CC Block, Wire crates and drain etc from chainage 0.00 Km to 2.00 Km.
SH Extension and maintenance of distribution pipeline at Shantipur Nabajay Para Rajmohan Para Sukramani Para and purbahalam Para under Laljuri RD Block area with other allied works under DWS SubDivision Kanchanpur during the year 2026-27 Gr I
SH Periodical clearing Of intake well mtc Of VT pump motors and other allied works etc at Kanchanpur surface water Treatment plant 0.65 MGD under DWS SubDivision Kanchanpur during the year 202627 2nd Call
SH Providing fixing in/c repair of electrical panel board comprising with starter main switch motor protection device etc in different water supply scheme within the jurisdiction of Jampui Hill RD Block under DWS SubDivision Kanchanpur
Construction of tank at Gandatwisa Fish Breeding Farm, under Supdt. of Fisheries, Gandatwisa Sub Division, Dhalai District, Tripura (Under the Fisheries based Development project for Dumbur, Tripura, under NEC, Water area_3.82 Hact) SH. Devel...GR_II
Deployment of truck for drinking water supply by polythene storge tank in different pockets /spots/habitations under 15th FC/RWS fund within the Jurisdiction of Laljuri RD Block under DWS SubDivision Kanchanpur for the year 2026 27/ GrI
Road development of work from KA Road to Buddhamandir (length -3.194 Km)/ SH- Metalling, Carpeting, Road side drain, protection wall etc. from Ch. 0.00 km to 2.00 km.
Construction of Cherra Crossing at different cherra of L.I.Schemes under Durgachowmuhani RD Block and Kamalpur Nagar Panchayet during the year 2026 27.
Shifting, Re-Alignment and Restoration of damaged Water Supply Pipelines and Allied Water Supply Assets during the year 2025-26 within the jurisdiction of PWD(DWS), Chawmanu Sub-Division.(Gr-II)
Construction of tank at Gandatwisa Fish Breeding Farm, under Supdt. of Fisheries, Gandatwisa Sub Division, Dhalai District, Tripura (Under the Fisheries based Development project for Dumbur, Tripura, under NEC, Water area 3.82 Hact) SH. Dev...G_I
Roads under AMC Ward no. 42/(2nd Call).
Road development work of road from KA Road near Kulai Baazar to KA Road at Basudebpara via Harinmara (Length-4.00 Km)/ SH- Protection work of Road by RCC retaining wall, CC Block, drain etc from chainage 2.10 Km to 4.00 Km.
Shifting, Re-Alignment and Restoration of damaged Water Supply Pipelines and Allied Water Supply Assets during the year 2025-26 within the jurisdiction of PWD(DWS), Chawmanu Sub-Division.(Gr-III)
Renovation of pump house SH Mtc of pump house of different M.I. schemes under Durgachowmuhani RD Block and Kamalpur Nagar Panchayat under W.R. Sub Division Kamalpur for the year 2026 27
Development of road from Jawharnagar (near BSF Camp) to Kumardhan Para (Dhumacherra road) during the year 2026-27/ SH- Constn. of R.C.C Retaining Wall at Ch.4.50 Km (L/S), 4.67 Km (L/S), 6.39 Km (R/S), 7.22 Km (L/S) and 8.05 Km (L/S).
mtc. Of burnt motors and different capacity pumps of different schemes within the jurisdiction of Ambassa RD Block area under DWS Sub-Division Ambassa.(Gr-I).
Roads under AMC Ward No. 43.
SH - Grouting, metalling, carpeting, re-carpeting, constn. of unlined surface drain/ Pucca drain, bamboo palasiding, including placing of C.C Block and gunny bags etc. Ch. from 3.00 Km to 9.125 Km.
Roads under AMC Ward no. 29 and 41.
Internal electrification for the work Construction of Type II quarter at SDM office Dharmanagar North Tripura under RD Dharmanagar Division during the FY 2024 25 Block 1 Unit 6
Construction
Construction
Providing fixing of Electrical items in/c repairing and Mtc of electrical equipments at different water supply scheme within the jurisdiction of Dasda RD Block under DWS Sub-Division Dasda.
Deployment of truck for drinking water supply of polythene storage tank in different pockets spots, habitation under 15th FC/ RWS fund within the jurisdiction of DWS Sub-Division Dasda during the year 2026-27.Gr-III.
Mtc. of PVC pipeline, Providing FHTCs and other allied work at different location within Dasda RD Block under DWS Sub-Division Dasda./Gr-II.
Mtc. of PVC pipeline, Providing FHTCs and other allied work at different location within Dasda RD Block under DWS Sub-Division Dasda./Gr-I
Repairing, Restoration Mtc of Existing Water supply schemes at Various DTW Pump House under DWS Sub-Division Dasda.
Construction of New Building for Nazrul Chatrabas of 150 nos capacity at Agartala Tripura W Front Block under Phase- II Balance portion SH Building portion including internal water supply and sanitary installation Providing internal electrification t
Flat Brick soling, Palasiding, Bats filling, Landslide clearing and other allied works.
Construction of 100 seated working women hostel at Udaipur under RD Udaipur Division,Gomati District Tripura during the year 2025-26/Providing internal electrification thereof.
Construction of RCC foot bridge near the house of Surya Mohan at Purba Palatana GP,of Kakraban RD Block.
Providing IE works for installation of Fire Alarm and Detection System for the auditorium of Sukanta Academy Agartala West Tripura
Construction of RCC foot bridge at Dakmura Para near the land of Udaimohan Jamatia under Kowaimura VC of Killa RD Block.
Maintenance of internal wiring and replacement of defective electrical equipements light fans etc of the administrative building of Kendriya Sansodhanagar Bishalgarh Tripura
Development of infrastructure facilities in rural market at Palatana Tulamura Market under Kakraban Agri Sub Division Gomati Tripura SH Providing Internal Electrification thereof
Internal Carrying of Agri. Inputs under South Tripura District w.e.f. 01/08/2026 to 31/07/2027
Construction
Construction of new Boundary wall at BBI Quarter near BBI pond under DMC for the year 2025 26 starting from last end of School inspector office to post office road
Construction
Please refer to the DNIeT
Construction
Maintenance of Dr. B.R. Ambedkar Memorial Chhatrinibas attached to Anandanagar HS School Sadar, West Tripura District
SH Patch WBM grouting recarpeting and other allied works